This exception shall not apply to any two contiguous lots in
a single ownership as of or subsequent to the effective date of this
chapter in any case where a reparceling or replotting could create
one or more lots which would conform to the area and dimensional provisions
of this chapter.
|
Width of Planting Screen Within the Buffer Yard
|
Requirements
(where two options are provided, applicant may choose
one within the category)
| ||
---|---|---|---|
10 feet (for 10-foot buffer yard)
|
Shrubs with a planted minimum height of 5 feet shall be planted,
with shade trees interspersed, in a continuous band with a spacing
not exceeding 5 feet on center for shrubs and 30 feet on center for
trees.
| ||
15 feet (for 20-foot buffer yard)
|
(1)
|
1 canopy tree per 40 feet; plus 1 evergreen tree per 60 feet
| |
OR
| |||
(2)
|
1 flowering tree per 40 feet; plus 1 evergreen tree per 60 feet
| ||
25 feet (for 30-foot buffer yard)
|
(1)
|
1 canopy tree per 40 feet; plus 1 flowering tree per 60 feet;
plus 1 evergreen tree per 60 feet
| |
OR
| |||
(2)
|
1 canopy tree per 40 feet; plus 1 flowering tree per 60 feet; plus 1 hedge on lot line (3-foot centers except as noted in Subsection 4F below)
| ||
OR
| |||
(3)
|
1 flowering tree per 40 feet; plus 1 evergreen tree per 25 feet
| ||
30 feet (for 50-foot buffer yard)
|
(1)
|
1 canopy tree per 40 feet; plus 1 evergreen tree per 20 feet;
plus 1 shrub per 4 feet
| |
OR
| |||
(2)
|
1 flowering tree per 40 feet; plus 1 evergreen tree per 20 feet; plus 1 hedge on lot line (3-foot centers except as noted in Subsection 4F below)
| ||
OR
| |||
(3)
|
1 flowering tree per 40 feet; plus 1 evergreen tree per 20 feet;
plus 1 berm 4 feet high
|
Street Classification
|
Minimum Future Right-of-Way
| |
---|---|---|
Arterial Highway
|
80 feet
| |
Collector Street
|
60 feet
| |
Local Street
|
50 feet
|
Except for uses noted in the preceding paragraph and uses specifically prohibited in the Delaware Canal Enhancement Area by Subsection 5 above, all other uses permitted in the underlying zoning districts shall have the following setbacks:
|
During any filling, grading, dredging or construction activity,
all reasonable efforts shall be made to leave the setback areas undisturbed.
|
In addition, all new uses or expanded uses shall comply with
the following requirements in order to be eligible for a zoning permit:
|