An application for a surface mining extraction permit shall be made to the Zoning Board of Adjustment with a site plan application and shall be accompanied by:
A.
A map showing existing contour lines at two-foot intervals.
B.
An aerial survey, which may be waived if, in the opinion of the Township Engineer, such a survey is not practical.
C.
Proposed contour lines at two-foot intervals after removal of the soil.
D.
All existing structures on the subject premises and within 200 feet thereof.
E.
All existing roads and drainage within 200 feet of the property.
F.
Location of topsoil storage areas.
G.
Methods of controlling silting of downstream properties.
H.
Elevation of the water table, if it is within eight feet of the proposed final contour, or certification that the water table is not within eight feet of the proposed final contour. The determination of the water table is to be by an approved method and shall be certified by a professional engineer, which certification shall also show the date the tests were made.
I.
Environmental impact statement.
J.
Drainage calculations.
K.
Wetlands delineation.
L.
Structures to be removed.
M.
The maps shall also show all existing trees having 2 1/2 inches in diameter, measuring 4 1/2 feet from ground level, and the plan for replacing the same number of trees with trees having a diameter of 2 1/2 inches measured 4 1/2 feet from the top of root level.
N.
The application shall also indicate the total number of cubic yards to be removed and the length of time within which the proposed operation shall be completed, which shall normally not be for longer than five years. Where a total project is not capable of being completed within five years, it shall be broken down into two sections, one of which shall be completed within five years and the other within such further period not exceeding five years as the Zoning Board of Adjustment may recommend or specify and subject to the Township Committee approval.
O.
The application shall contain the name and address of the applicant, if a different person is involved. The signed consent of the owner shall be required, if the applicant is not the owner. In addition, the tax block and lot number of the property involved and the routes to and from the proposed site to be used in transporting soil removal from the site shall be included.
P.
Approved Soil Conservation District Plan approved by the appropriate State of New Jersey or Warren County agency, as the case may be.