[Amended 10-17-2022]
Prior to starting any construction activities, a registered land surveyor shall set grade stakes along the roadway right-of-way, center line, sidelines, and sidewalks at one-hundred-foot intervals. All trees to be preserved shall be flagged. The site shall be walked with a designated agent of the Department of Public Works. All construction and work sequencing shall be conducted in accordance with the following sections.