[Ord. 754, 8/14/2007]
All paving shall be in accordance with PennDOT Publication 408
and the Borough specifications as provided in the construction details.
[Ord. 754, 8/14/2007]
Installation of sanitary sewers, including house lines, laterals,
trunk lines, manholes, and other appurtenances, shall comply with
the rules and regulations of the municipal authority having jurisdiction
and subject to inspection by the same.
[Ord. 754, 8/14/2007]
This chapter incorporates in its entirety and as may be amended,
all aspects of the Stormwater Management Act P.L. 864, No. 167. Said
act requires that actions be taken:
A. To assure that the maximum rate of stormwater runoff is no greater
after development than prior to development activities; or
B. To manage
the quantity, velocity, and direction of resulting stormwater runoff
in a manner which otherwise adequately protects health and property
from possible injury.
[Ord. 754, 8/14/2007]
All developments shall be required to use public water system
for all potable water needs.
[Ord. 754, 8/14/2007]
Permanent monuments of reinforced concrete or metal shall be
installed after all grading and improvements have been installed to
identify all street right-of-ways and set in locations as determined
by the Borough Engineer. The developer shall furnish a certification
that monuments have been set in the locations as shown on recorded
subdivision plan.
[Ord. 754, 8/14/2007]
In wooded areas or where other natural conditions exist, in
such a manner that their presence adds to the desirability of a subdivision
or land development, the Council shall require that the applicant
preserve as much of the original trees and natural conditions as is
economically feasible and require that a minimum of grading be done
other than the grading and excavating which is required for the construction
of the improvements in accordance with this part and approved by the
Council.
[Ord. 754, 8/14/2007]
After completion of all required improvements, the developer
shall have his engineer or surveyor prepare and submit for Borough
approval plans and profiles showing the exact location, elevation,
grade, size stormwater detention pond volumes and material used to
install all facilities. Said plans shall be dated, signed and sealed
by the person preparing plan and be submitted on mylar and in an approved
electronic digital format acceptable to the Borough.