Ord./Res.
|
Date
|
Subject
|
---|---|---|
Res. 282
|
4/8/1971
|
Approving a tentative Comprehensive Plan for the Township of
Salisbury and providing for a public hearing of said Plan
|
Res. 283
|
6/10/1971
|
Amending a tentative Comprehensive Plan for the Township of
Salisbury
|
Res. 284A
|
6/10/1971
|
Approving and adopting a Comprehensive Plan for the Township
of Salisbury
|
Res. 10-87-545
|
10/8/1987
|
Conditionally approving the major subdivision plan of the Busch
Brothers
|
Res. 11-87-550
|
11/24/1987
|
Conditionally approving the preliminary/final land development
plan of Taco Bell
|
Res. 1-88-555
|
1/14/1988
|
Conditionally approving the final major subdivision plan of
Woodhaven
|
Res. 3-88-561
|
3/10/1988
|
Conditionally approving the Devonhouse preliminary/final resubdivision
and land development plan
|
Res. 3-88-565
|
3/24/1988
|
Approving the Lindquist final major subdivision plan
|
Res. 6-88-576
|
6/23/1988
|
Conditionally approving the Devonshire residential preliminary/final
resubdivision plan
|
Res. 6-88-577
|
6/23/1988
|
Approving the Devonshire residential preliminary/final revised
major subdivision plan
|
Res. 11-88-591
|
11/22/1988
|
Conditional approval of Devonshire residential preliminary/final
resubdivision plan of 11/9/1988
|
Res. 11-88-592
|
11/22/1988
|
Conditional approval of the Trout Creek Crossing II revised
preliminary/final plan of 11/17/1977
|
Res. 5-89-619
|
5/11/1989
|
Conditionally approving the 1050 Professional Building preliminary/final
resubdivision and land development plan
|
Res. 5-89-620
|
5/11/1989
|
Conditionally approving the preliminary/final land development
plan of James J. Mika
|
Res. 5-89-622
|
5/11/1989
|
Conditionally approving the Mountain Top final major subdivision
plan
|
Res. 5-89-623
|
5/11/1989
|
Conditionally approving the Lehigh Professional Center preliminary/final
land development plan
|
Res. 9-89-637
|
9/14/1989
|
Conditionally approving the preliminary major subdivision plan
of Troxell Gardens II
|
Res. 9-89-642
|
9/28/1989
|
Resolution for plan revision
|
Res. 9-89-643
|
9/28/1989
|
Conditionally approving the Lehigh County Temporary Prison preliminary/final
land development and major subdivision plan
|
Res. 1-90-651
|
1/11/1990
|
Conditionally approving the final major subdivision plan of
Troxell Gardens II
|
Res. 3-90-659
|
3/22/1990
|
Conditionally approved the Lehigh County Temporary Prison Facility
addition site plan
|
Res. 4-90-668
|
4/26/1990
|
Conditionally approving the preliminary/final site plan of the
South Mall Expansion
|
Res. 4-90-669
|
4/26/1990
|
Adopting and submitting to the Department of Environmental Resources
for its approval the revision of the official plan of a parcel of
land identified as the South Mall Expansion
|
Res. 5-90-671
|
5/24/1990
|
Conditionally approving the Penn Treaty Life Insurance Company
preliminary/final land development plan
|
Res. 5-90-672
|
5/24/1990
|
Adopting and submitting to the Department of Environmental Resources
for its approval of the revision of the official plan of a parcel
of land identified as the Lot II Devonshire Park
|
Res. 5-90-673
|
5/24/1990
|
Conditionally approving the Howard Construction Company preliminary/final
land development plan
|
Res. 7-90-677
|
7/18/1990
|
Conditionally approving the preliminary major subdivision plan
of Woodland Hills
|
Res. 8-90-679
|
8/9/1990
|
Conditionally approving the preliminary/final site plan of the
MRI building addition, Lehigh Valley Hospital
|
Res. 8-90-680
|
8/23/1990
|
Conditionally approving the preliminary/final site plan of South
Mall Expansion
|
Res. 11-90-685
|
11/15/1990
|
Adopting and submitting to the Department of Environmental Resources
a revised official plan of a parcel of land identified as Woodland
Hills Subdivision
|
Res. 11-90-686
|
11/15/1990
|
Conditionally approving the final major subdivision plan of
Woodland Hills
|
Res. 2-91-698
|
2/28/1991
|
Adopting and submitting to the Department of Environmental Resources
a revised official plan of a parcel of land identified as Eastern
Salisbury Fire/Rescue Station
|
Res. 3-91-701
|
3/14/1991
|
Conditionally approving the Eastern Salisbury Fire/Rescue Station
preliminary/final major subdivision and land development plans
|
Res. 4-91-704
|
4/25/1991
|
Conditionally approving the preliminary/final land development
plan of Mobil Oil Corporation
|
Res. 5-91-705
|
5/23/1991
|
Accepting the Crown America Detention Basin in the Devonshire
Park Subdivision
|
Res. 6-91-707
|
6/13/1991
|
Amending Res. 4-91-704, approving the Mobil Oil Corporation
preliminary/final plan by changing the reference to stormwater basin
|
Res. 6-91-708
|
6/13/1991
|
Granting conditional preliminary approval to the preliminary
land development plan of the Cedar Crest Boulevard Office Building/Hornstein
Enterprises, Inc.
|
Res. 7-91-711
|
7/11/1991
|
Granting conditional approval to the preliminary/final land
development plan of South Allentown Congregation
|
Res. 7-91-712
|
7/25/1991
|
Amending in part Res. 11-90-686, conditionally approving the
final major subdivision plan of Woodland Hills
|
Res. 7-91-713
|
7/25/1991
|
Revising the official sewage facilities plan for the Woodland
Hills major subdivision
|
Res. 8-91-714
|
8/22/1991
|
Granting conditional, final approval to the final land development
plan of Cedar Crest Boulevard Office Building/Hornstein Enterprises,
Inc.
|
Res. 8-91-715
|
8/22/1991
|
Revising the official sewage facilities plan for the Cedar Crest
Office Building land development plan
|
Res. 10-91-716
|
10/10/1991
|
Revising the official sewage facilities plan for the Wayne A.
and Alayne Renniger minor subdivision plan
|
Res. 10-91-717
|
10/24/1991
|
Revising the official sewage facilities plan for the Stephen
and Ethel M. Dervarics minor subdivision plan
|
Res. 11-91-719
|
11/14/1991
|
Granting conditional approval to the preliminary/final major
subdivision plan of River Road Fire Company, Inc.
|
Res. 4-92-738
|
4/23/1992
|
Stating that the Board will ratify without review or discretion
any decision made by the Salisbury Township Planning Commission on
the LaBelle subdivision/land development plan
|
Res. 5-92-740
|
5/14/1992
|
Granting conditional approval for the Salisbury School District
Administration Building site plan
|
Res. 5-92-742
|
5/28/1992
|
Granting conditional approval for the Lehigh Valley Hospital
preliminary/final land development plan
|
Res. 5-92-743
|
5/28/1992
|
Revising the official sewage plan of the Lehigh Valley Hospital
Center
|
Res. 5-92-744
|
5/28/1992
|
Revising the official sewage plan of the Warren W. and Miriam
M. Ritter
|
Res. 6-92-746
|
6/11/1992
|
Revising the official sewage plan of the Leona Robinson
|
Res. 6-92-747
|
6/25/1992
|
Granting conditional approval to the revised final land development
plan of the Cedar Crest Boulevard Office Building/Hornstein Enterprises,
Inc.
|
Res. 7-92-748
|
7/23/1992
|
Conditionally approving the St. Thomas More Church site plan
for a parking lot
|
Res. 8-92-751
|
8/27/1992
|
Revising the official sewage facilities plan for the Robert
and Anna Sopko minor subdivision
|
Res. 10-92-755
|
10/8/1992
|
Revising Condition #7 of Res. 11-91-719, conditionally approving
the preliminary/final major subdivision plan of River Road Fire Co.,
Inc.
|
Res. 11-92-760
|
11/12/1992
|
Conditionally approving the Vince Boyer site plan
|
Res. 11-92-762
|
11/24/1992
|
Granting conditional preliminary/final approval to the land
development plan of Lot #8 of Devonshire Park submitted by Gerald
J. Labelle
|
Res. 11-92-763
|
11/24/1992
|
Revising the official sewage facilities plan for Lot #8 Devonshire
Park/Car Wash development plan
|
Res. 3-93-774
|
3/11/1993
|
Revising the official sewage facilities plan for the Magnetic
Resonance Imaging Building addition at Lehigh Valley Hospital
|
Res. 4-93-777
|
4/8/1993
|
Conditionally approving the site plan for a sanctuary addition
at the Cedar Crest Bible Fellowship Church
|
Res. 4-93-778
|
4/5/1993
|
Revising the official sewage facilities plan for the sanctuary
addition at the Cedar Crest Bible Fellowship Church
|
Res. 8-93-784
|
8/12/1993
|
Adopting and submitting to the Department of Environmental Resources
for its approval the revision of the official plan of the minor subdivision
located at Concord and Lehigh Avenues
|
Res. 8-93-785
|
8/26/1993
|
Conditionally approving the preliminary major subdivision plan
of Westbury Park
|
Res. 10-93-788
|
10/14/1993
|
Revising the official sewage facilities plan for the Westbury
Park major subdivision
|
Res. 11-93-796
|
11/9/1993
|
Denying the preliminary land development plan for Hamilton Manor
|
Res. 11-93-798
|
11/23/1993
|
Revising the official sewage facilities plan for the Ronald
Stack minor subdivision
|
Res. 1-94-806
|
1/13/1994
|
Conditionally approving the preliminary/final land development
plan for Cedar Crest Professional Park
|
Res. 1-94-807
|
1/13/1994
|
Conditionally approving the preliminary/final major subdivision
plan for Devonshire Park Lot No. 1
|
Res. 1-94-808
|
1/13/1994
|
Revising the official sewage facilities plan for the Devonshire
Park Lot No. 1 major subdivision
|
Res. 1-94-809
|
1/13/1994
|
Conditionally approving the Westbury Park final major subdivision
plan
|
Res. 2-94-812
|
2/24/1994
|
Revising the official sewage facilities plan for the land development
plan in the Cedar Crest Professional Park
|
Res. 3-94-817
|
3/10/1994
|
Conditionally approving the Deer Run preliminary/final major
subdivision plan
|
Res. 3-94-818
|
3/24/1994
|
Approving the Western Salisbury Fire Company preliminary/final
site plan for an additional bay for the fire station
|
Res. 3-94-819
|
3/24/1994
|
Conditionally approving the Cross Roads Baptist Church preliminary/final
site plan
|
Res. 4-94-822
|
4/14/1994
|
Conditionally approving the preliminary subdivision plan of
City View Estates
|
Res. 5-94-826
|
5/12/1994
|
Revising the official sewage facilities plan for the Deer Run
major subdivision
|
Res. 6-94-829
|
6/9/1994
|
Revising the official sewage facilities plan for the City View
Estates major subdivision
|
Res. 8-94-835
|
8/11/1994
|
Conditionally approving the City View Estates major subdivision
plan
|
Res. 10-94-840
|
10/13/1994
|
Conditionally approving the Salisbury Township preliminary/final
plan for a municipal building
|
Res. 10-94-841
|
10/27/1994
|
Revising the official sewage facilities plan for the Salisbury
Township municipal building land development plan
|
Res. 12-94-846
|
12/22/1994
|
Conditionally approving the Milton and Dale Stephens major subdivision
plan
|
Res. 1-95-848
|
1/12/1995
|
Revising the official sewage facilities plan for the Milton
and Dale Stephens major subdivision plan
|
Res. 1-95-849
|
1/12/1995
|
Revising the official sewage facilities plan for the Patrick
and Mary Rigney minor subdivision plan
|
Res. 7-95-861
|
7/13/1995
|
Conditionally approving the revised preliminary/final land development
plan for Devonshire Park Lot No. 8
|
Res. 7-95-862
|
7/13/1995
|
Revising the official sewage facilities plan for the minor subdivision
plan of William Schnierlein and Kenneth Erney
|
Res. 7-95-864
|
7/27/1995
|
Conditionally approving the Lamm Machine, Inc., site plan
|
Res. 8-95-866
|
8/24/1995
|
Conditionally approving the preliminary major subdivision plan
of Honeysuckle Ridge (formerly Mountain Top Estates)
|
Res. 9-95-869
|
9/28/1995
|
Revising the official sewage facilities plan for the minor subdivision
plan of Thomas Williams
|
Res. 10-95-873
|
10/26/1995
|
Conditionally approving the Swain School library/classroom addition
|
Res. 11-95-874
|
11/9/1995
|
Conditionally approving the Lehigh Valley Hospital south access
drive site plan review
|
Res. 1-96-879
|
1/11/1996
|
Revising the official sewage facilities plan for the minor subdivision
plan of the South Allentown Congregation
|
Res. 1-96-880
|
1/25/1996
|
Revising the official sewage facilities plan for the Pine Street
minor subdivision plan on Pine Street
|
Res. 2-96-882
|
2/8/1996
|
Revising the official sewage facilities plan for the New Seasons
of Allentown land development plan
|
Res. 2-96-883
|
2/8/1996
|
Conditionally approving the New Seasons at Allentown preliminary/final
land development plan
|
Res. 3-96-886
|
3/14/1996
|
Revising the official sewage facilities plan for the Kistler
minor subdivision plan
|
Res. 5-96-890
|
5/9/1996
|
Conditionally approving the Rodney Godshall preliminary/final
land development plan
|
Res. 6-96-893
|
6/13/1996
|
Conditionally approving the Lehigh Valley Hospital south campus
infrastructure project site plan
|
Res. 9-96-896
|
9/12/1996
|
Conditionally approving the Bank of Pennsylvania land development
plan
|
Res. 10-96-898
|
10/10/1996
|
Conditionally approving the Dr. Weiner parking lot expansion
for Building 1259 site plan
|
Res. 10-96-899
|
10/10/1996
|
Conditionally approving the Manor Healthcare Corporation site
plan
|
Res. 10-96-902
|
10/24/1996
|
Conditionally approving the St. Thomas More Church preliminary/final
site plan for elementary school additions and renovations
|
Res. 10-96-903
|
10/24/1996
|
Conditionally approving the revised preliminary/final New Seasons
at Allentown land development plan
|
Res. 1-97-913
|
1/23/1997
|
Conditionally approving the Devonshire Cell preliminary/final
major subdivision plan
|
Res. 2-97-917
|
2/27/1997
|
Conditionally approving the 1245 South Cedar Crest Boulevard
preliminary/final land development plan for an office building in
the Cedar Crest Professional Park
|
Res. 4-97-927
|
4/24/1997
|
Conditionally approving the Lehigh Valley Hospital East Wing
Addition and North Campus Infrastructure site
|
Res. 5-97-930
|
5/22/1997
|
Conditionally approving an amended plan showing Phase I of the
1245 South Cedar Crest Boulevard preliminary/final land development
plan for parking lot expansion in the Cedar Crest Professional Park
|
Res. 5-97-931
|
5/22/1997
|
Conditionally approving an amended plan showing Phase II of
the 1245 South Cedar Crest Boulevard preliminary/final land development
plan for an office building in the Cedar Crest Professional Park
|
Res. 5-97-932
|
5/22/1997
|
Conditionally approving the Knopf Pontiac site plan
|
Res. 7-97-941
|
7/24/1997
|
Conditionally approving the Rosewood preliminary major subdivision
plan
|
Res. 02-98-966
|
2/26/1998
|
Modifying a condition of the preliminary/final plan approval
of the Deer Run subdivision to require a 5-foot of right-of-way along
the south side of Fish Hatchery Road
|
Res. 03-98-972
|
3/12/1998
|
Conditionally approving the Rosewood final major subdivision
plan
|
Res. 03-98-974
|
3/26/1998
|
Conditionally approving the R. Tyler Moorhead site plan
|
Res. 04-98-976
|
4/23/1998
|
Conditionally approving 1249 South Cedar Crest Boulevard preliminary/final
land development plan in the Cedar Crest Professional Park
|
Res. 06-98-981
|
6/25/1998
|
Conditionally approving the Service Electric Cable TV site plan
and lot consolidation plan
|
Res. 12-98-1005
|
12/10/1998
|
Conditionally approving the preliminary/final site development
plan of the Swain School
|
Res. 01-99-1011
|
1/28/1999
|
Conditionally approving the major subdivision plan for 739 East
Emmaus Avenue
|
Res. 5-99-1023
|
5/13/1999
|
Approving the preliminary/final site plan for the proposed athletic
field expansion of the Swain School
|
Res. 5/99/1026
|
5/27/1999
|
Approving the preliminary/final land development plan for the
Central Congregation of Jehovah's Witnesses Church
|
Res. 6-99-1033
|
6/10/1999
|
Approving an amended preliminary/final land development plan
for the Central Congregation of Jehovah's Witnesses Church
|
Res. 2-2000-1055
|
2/10/2000
|
Ratifying without review or discretion any decision made by
the Salisbury Township Planning Commission on the Unity of the Lehigh
Valley Church preliminary/final land development plan
|
Res. 3-2000-1061
|
3/14/2000
|
Denying the preliminary land development plan for Unity of Lehigh
Valley Church
|
Res. 3-2000-1062
|
3/23/2000
|
Ratifying the Planning Commission decision to deny the preliminary
land development plan for Unity of the Lehigh Valley Church
|
Res. 3-2000-1063
|
3/23/2000
|
Approving the site plan for the western Salisbury School ballfield
expansion site plan
|
Res. 4-2000-1067
|
4/27/2000
|
Conditionally approving the C-TEC Cable Systems of PA, Inc.,
(RCN) site plan
|
Res. 5-2000-1068
|
5/11/2000
|
Approving the preliminary/final minor subdivision plan of Wilhemina
Hassick
|
Res. 7-2000-1069
|
7/27/2000
|
Approving the site plan of Cedar Crest Professional Park Underground
Detention
|
Res. 8-2000-1070
|
8/24/2000
|
Denying applicant's request for an extension of preliminary
major subdivision plan approval of Honeysuckle Ridge (formerly Mountaintop
Estates)
|
Res. 9-2000-1072
|
9/28/2000
|
Approving the site plan of the Salisbury School District middle
school athletic fields grading project
|
Res. 12-2000-1078
|
12/28/2000
|
Conditionally approving the Penn Treaty Life Insurance Company
parking lot site plan
|
Res. 12-2000-1079
|
12/28/2000
|
Denying preliminary/final major subdivision plan known as the
Robert Bollinger subdivision
|
Res. 2-2001-1081
|
2/22/2001
|
Approving the site plan of the Salisbury Township School District
High School building addition, preliminary/final land development
plan
|
Res. 2-2001-1082
|
2/22/2001
|
Approving the site plan of St. Thomas More Church building additions,
preliminary/final land development plan
|
Res. 4-2001-1083
|
4/26/2001
|
Approving the site plan of Lehigh Valley Hospital Center for
new parking lots
|
Res. 5-2001-1086
|
5/31/2001
|
Approving the site plan of the Swain School building addition/land
development
|
Res. 8-2001-1087
|
8/23/2001
|
Approving preliminary/final site plan of Dr. Lawrence E. Glaser
for a building addition
|
Res. 12-2001-1094
|
12/27/2001
|
Conditionally approving Howard Kulp parking lot expansion/land
development plan
|
Res. 01-2002-1098
|
1/24/2002
|
Approving the land development plan of Cedar Crest Professional
Park for parking lot expansion
|
Res. 08-2002-1105
|
8/22/2002
|
Approving the land development plan of Wendy's Restaurant, to
be located at 3390 Lehigh Street
|
Res. 08-2002-1106
|
8/22/2002
|
Approving the major subdivision plan for the Thomas P. Williams
property located at 1315 Fairfax Place
|
Res. 11-2002-1109
|
11/26/2002
|
Approving the major subdivision plan of the Estates of Fish
Hatchery
|
Res. 12-2002-1111
|
12/12/2002
|
Denying applicant's request for a major subdivision plan approval
of Bruce H. Uhl
|
Res. 06-2003-1124
|
6/12/2003
|
Approving the site plan of Vinart Honda
|
Res. 08-2003-1133
|
9/4/2003
|
Approving the land development plan of Knopf Pontiac
|
Res. 10-2003-1137
|
10/23/2003
|
Approving the land development plan of Center Square Associates
|
Res. 02-2004-1161
|
2/10/2004
|
Approving Scott Chevrolet's preliminary land development plan
|
Res. 03-2004-1151
|
3/25/2004
|
Approving the Yeker Farms preliminary plan for a major subdivision
|
Res. 03-2004-1152
|
3/25/2004
|
Approving the Parkwood Center final land development plan
|
Res. 03-2004-1153
|
3/25/2004
|
Approving the final land development plan of Scott Chevrolet
|
Res. 05-2004-1162
|
5/27/2004
|
Approving the Yeker Farms final plan for a major subdivision
|
Res. 06-2004-1165
|
6/24/2004
|
Approving the final land development plan of Daisy Hill Convenience
Store
|
Res. 01-2005-1178
|
1/27/2005
|
Approving Lehigh Valley Hospital's preliminary/final land development
plan
|
Res. 05-2005-1196
|
5/12/2005
|
Approving the Lehigh Valley Hospital Center final land development
plan
|
Res. 08-2005-1202
|
8/25/2005
|
Approving the Salisbury Commercial Commons final land development
plan
|
Res. 10-2005-1203
|
10/13/2005
|
Approving the South Mall Starbucks preliminary land development
plan
|
Res. 11-2005-1204
|
11/10/2005
|
Approving the South Mall Starbucks final land development plan
|
Res. 12-2005-1209
|
12/8/2005
|
Approving the Cedar Crest Bible Fellowship Church final land
development plan
|
Res. 12-2005-1215
|
12/8/2005
|
Approving the Michaela Manor on the Parkway preliminary major
subdivision plan
|
Res. 01-2006-1214
|
1/12/2006
|
Approving the Salisbury Commercial Commons final land development
plan
|
Res. 01-2006-1216
|
1/26/2006
|
Approving the Michaela Manor on the Parkway final major subdivision
plan
|
Res. 03-2006-1217
|
3/9/2006
|
Approving the Salisbury Woods preliminary major subdivision
plan
|
Res. 04-2006-1219
|
4/27/2006
|
Approving the Salisbury Woods final major subdivision plan
|
Res. 04-2006-1230
|
4/13/2006
|
Approving the Center Square Associates preliminary/final major
subdivision and land development plan
|
Res. 07-2006-1231
|
7/27/2006
|
Approving the 1730 East Susquehanna Street final major subdivision
plan
|
Res. 12-2006-1238
|
12/28/2006
|
Approving the Southbury Park final major subdivision plan
|
Res. 01-2007-1240
|
1/11/2007
|
Approving the Devonhouse Building preliminary/final land development
plan
|
Res. 07-2007-1255
|
7/12/2007
|
Approving the Bruce Uhl preliminary major subdivision and land
development plan
|
Res. 09-2007-1257
|
9/27/2007
|
Approving the Devonshire Park Apartments preliminary/final land
development plan
|
Res. 01-2008-1268
|
1/31/2008
|
Approving the preliminary land development plan for Kidspeace
|
Res. 03-2008-1283
|
3/27/2008
|
Approving the final land development plan for Kidspeace
|
Res. 06-2008-1286
|
6/12/2008
|
Approving the Parkwood Real Estate Trust, LLC, preliminary/final
land development plan
|
Res. 09-2008-1293
|
9/25/2008
|
Approving an amendment to Res. 05-2005-1196, involving a final
land development plan for Lehigh Valley Hospital
|
Res. 10-2008-1300
|
10/23/2008
|
Approving the Hope United Church of Christ preliminary/final
land development plan
|
Res. 12-2008-1302
|
12/11/2008
|
Approving the Salisbury High School preliminary/final land development
plan
|
Res. 05-2009-1322
|
5/28/2009
|
Approving the A & H Sporting Goods preliminary/final land
development plan
|
Res. 06-2009-1324
|
6/11/2009
|
Approving the Devonshire Park Apartments Expansion additional
waiver to § 10.10.B.2(h) and (i)
|
Res. 06-2009-1326
|
6/25/2009
|
Approving the St. Thomas Moore Church preliminary/final land
development plan
|
Res. 11-2009-1333
|
11/12/2009
|
Denying the Devonshire Park Apartments request for a waiver
from SALDO § 10.14
|
Res. 03-2010-1346
|
3/11/2010
|
Approving the preliminary/final land development plan of the
Lehigh Valley Health Network Family Lodging Center
|
Res. 04-2010-1348
|
4/8/2010
|
Approving the Scott Cars, Inc., Chevrolet preliminary/final
land development plan
|
Res. 07-2010-1365
|
7/22/2010
|
Approving the Crossroads Baptist Church preliminary/final land
development plan
|
Res. 10-2010-1373
|
10/14/2010
|
Approving the SAR Associates, LLC, Chevrolet building addition
preliminary/final plan
|
Res. 02-2011-1381
|
2/24/2011
|
Approving the preliminary/final land development plan of the
1600 Riverside Drive Lehigh County Detoxification Facility
|
Res. 07-2011-1394
|
7/28/2011
|
Approving the Devonshire Park apartments expansion allowing
additional units with a revised land development plan
|
Res. 10-2012-1426
|
10/25/2012
|
Approving the Kost Tire & Auto Service preliminary/final
land development plan
|
Res. 11-2012-1427
|
11/29/2012
|
Approving the Devonhouse building expansion preliminary/final
land development plan
|
Res. 10-2013-1447
|
10/24/2013
|
Approving the Legacy Place preliminary/final land development
plan
|
Res. No. 07-2020-1680
|
7/9/2020
|
Approving the Plot 886 Preliminary Major Subdivision Plan
|
Res. No. 07-2020-1683
|
7/28/2020
|
Approving the Plot 886 Final Major Subdivision Plan
|
Res. No. 11-2020-1688
|
11/12/2020
|
Approving the Mercedes-Benz and Porsche of the Lehigh Valley
Preliminary/Final Land Development Plan
|
Res. No. 01-2021-1696
|
1/14/2021
|
Approving the Preliminary/Final Land Development Plan for a
proposed office building at 2460 Parkwood Drive
|