Ord./Res. | Date | Subject |
|---|---|---|
Ord. 117 | 10/18/1971 | Signifying the desire and intention of the Township to jointly organize a Joint Sewer Authority |
Ord. 124A | 12/5/1972 | Approving the engineering proposal of Gilbert Association Inc. for the design of a sanitary sewerage system |
Ord. 127 | 6/2/1973 | Approving the engineering proposal of Gilbert Association Inc. for the design of a sanitary sewerage system |
Ord. 129 | --/--/1974 | Approving the engineering proposal of Gilbert Association Inc. for the preparation of right-of-way drawings for a sanitary sewerage system |
Res. 11/29/1977 | 11/29/1977 | Authorizing Cassebaum & McFall, P.C. to initiate any and all legal action concerning the sewer project of the Bushkill-Lower Lehigh Joint Sewer Authority |
Ord. 245 | 6/18/1993 | Requiring owners served by Bayberry Street sanitary sewer to connect and discontinue use of cesspools, septic tanks and other of the like |
Ord. 303 | 2/8/2006 | Requiring owners served by the Mary's Mountain Estates, Phase II sanitary sewer to connect and discontinue use of cesspools, septic tanks and of the like |
Ord. 340 | 1/14/2009 | Requiring owners served by Phase I of the West Pen Argyl area sanitary sewer to connect and discontinue use of cesspools, septic tanks and other of the like |
Res. No. 2022-08 | 2/9/2022 | Adopting the Act 537 Sewage Facilities Plan |
Res. No. 2023-08 | 3/23/2023 | Submitting for DEP approval a revision to the Official Sewerage Facilities Plan for an on-lot system for the Farm-Winery, Micro Distillery, Vineyard & Special Event space development by Social Still Distillery |
Res. No. 2023-10 | 5/25/2023 | Adopting an update to the Act 537 Sewage Facilities Plan |