A.
Application; fee.
(1)
Before any major subdivision of land takes place, an application shall be submitted and approved. The application shall be submitted to the Secretary of the Board, on the appropriate form provided by the Board, with the appropriate copies of a preliminary plat of the proposed subdivision. The number and type of copies of the application form and maps shall be as specified in the procedure manual for subdivisions, as prepared, approved and from time to time revised by the Planning Board.
B.
Revision; amendment.
(1)
Following the public hearing and prior to adoption of a resolution of approval or disapproval of a subdivision application, the developer may request and the Board may grant permission to revise the preliminary plat.
(2)
The Board shall also have the discretion to permit the applicant to submit an amendment application in appropriate instances.
C.
Action by Borough Engineer. Prior to consideration of the application by the Board, the Borough Engineer shall examine the preliminary plans for conformance with the engineering requirements of the Borough. The Borough Engineer shall submit his/her comments to the Board prior to the date set for consideration of the application by the Board.
D.
Approval.
(1)
Notation. Where the Board acts favorably on an application, the Chairperson and the Secretary of the Board shall affix their signatures to the plat, with a notation that it has now received approval, and it shall be returned to the developer for compliance with final approval requirements.
(2)
Effect. Approval of the preliminary plat shall constitute approval of the subdivision as to form only; that is, as to the arrangement and approximate dimensions of streets, lots and other planned features.
(3)
Rights of applicant. Preliminary approval shall confer upon the applicant the following rights for a three-year period from the date of approval: