Town of Norwell, MA
Plymouth County
Login
By using
eCode360
you agree to
be legally bound by
the
Terms of Use
.
If you do not agree to the Terms of Use, please do not use
eCode360.
Home
Help
Pin open the table of contents
Table of Contents
Open the table of contents
Table of Contents
Division 1: Charter and State Acts
Ch SA
Special Acts and General Laws
Division 2: General Bylaws
Part I: Town Government and Administration
Ch 1
General Provisions
Ch 2
Town Meetings
Ch 3
Elected Officials
Ch 4
Appointed Officials
Ch 5
Town Employees
Ch 6
Contracts
Ch 7
Finance
Ch 8
Legal Affairs
Ch 9
Licenses and Permits
Ch 10
Records and Reports
Ch 11
Town Property
Ch 12
Town Seal
Part II (Reserved)
Part III: Health and Public Safety
Ch 41
Board of Health
Ch 42
Board of Water Commissioners
Ch 43
Division of Inspections
Ch 44
Fire Department
Ch 45
Police Department
Part IV: Land Use and Natural Resources
Ch 61
Conservation Commission
Ch 62
Soil, Loam, Sand or Gravel Removal
Ch 63
Right to Farm
Ch 64
Waterways
Part V: Streets and Ways
Ch 81
Public Ways
Ch 82
Scenic Roads
Division 3: Zoning Bylaw
Ch 201
Zoning
Division 4: Rules and Regulations
Ch 301
Board of Appeals
Ch 301 Art 1
General Provisions
§ 301-1.1
Purpose; filing; amendments; references.
§ 301-1.2
Board powers.
§ 301-1.3
Types of appeals, applications and petitions.
Ch 301 Art 2
Board Organization
§ 301-2.1
Elections.
§ 301-2.2
Chair.
§ 301-2.3
Vice Chair.
§ 301-2.4
Clerk.
§ 301-2.5
Panel members and hearing chair.
§ 301-2.6
Associates and special alternates.
§ 301-2.7
Quorum.
§ 301-2.8
Hearings, meetings and site walks.
§ 301-2.9
Legal record.
§ 301-2.10
Policies and advice.
Ch 301 Art 3
Pre-Application Process
§ 301-3.1
Requirements by application type.
§ 301-3.2
Other approvals.
Ch 301 Art 4
Application Process
§ 301-4.1
Commencement of proceedings.
§ 301-4.2
Application forms and supporting documents; filing fee and escrow schedule.
§ 301-4.3
Notice to abutters.
§ 301-4.4
Filing application.
§ 301-4.5
Supplemental information.
§ 301-4.6
Number of copies.
§ 301-4.7
Application filing fee; escrow funds.
Ch 301 Art 5
Pre-Hearing Process
§ 301-5.1
Notice, hearings and decision.
§ 301-5.2
Scheduling public hearing.
§ 301-5.3
Public hearing and decision timelines.
§ 301-5.4
Public notice and notification to parties in interest.
§ 301-5.5
Zoning Bylaw and documents availability; Town website.
Ch 301 Art 6
Public Hearing Process
§ 301-6.1
Hearing procedure.
§ 301-6.2
Applicant's submission.
§ 301-6.3
Applicant's representatives and presentation.
§ 301-6.4
Examination by Board.
§ 301-6.5
Submission of evidence; witnesses, speakers and oaths.
§ 301-6.6
Proponents.
§ 301-6.7
Opponents.
§ 301-6.8
Interested and concerned citizens.
§ 301-6.9
Other counsel or representatives.
§ 301-6.10
Reports.
§ 301-6.11
Rebuttals.
§ 301-6.12
Briefs.
§ 301-6.13
Decision.
Ch 301 Art 7
Action by Board
§ 301-7.1
Voting requirements.
§ 301-7.2
Withdrawal.
§ 301-7.3
False or misleading information.
§ 301-7.4
Appeal of Board decision.
§ 301-7.5
Recording of decision.
§ 301-7.6
Repetitive petitions.
§ 301-7.7
Limitation on approval; extensions.
§ 301-7.8
Waiver of requirements; additional information.
Ch 301 Art 8
Projects Subject to Site Plan Requirements
§ 301-8.1
Documentation required.
§ 301-8.2
Technical review.
§ 301-8.3
Performance guarantees; certificates of occupancy; as-built plans.
§ 301-8.4
Site plan changes and modifications.
Ch 301 Art 9
Stormwater Management Requirements
§ 301-9.1
Requirements and purpose.
§ 301-9.2
Documentation and plans.
§ 301-9.3
Drainage specifications.
§ 301-9.4
Drainage design.
§ 301-9.5
General requirements.
§ 301-9.6
Data submission.
§ 301-9.7
Construction plan/erosion and sedimentation control plan.
§ 301-9.8
Operations and maintenance plan.
§ 301-9.9
Minimum design criteria for stormwater basins and subsurface systems.
§ 301-9.10
Minimum design criteria for drainage pipes.
§ 301-9.11
Drainage easements.
§ 301-9.12
Homeowners' association requirements.
§ 301-9.13
Installation; gas and sand traps; excavation; gravel removal.
Ch 301 Art 10
Comprehensive Permits
§ 301-10.1
Purpose; applicability of other rules and regulations.
§ 301-10.2
Definitions.
§ 301-10.3
Minimum jurisdictional requirements for filing application.
§ 301-10.4
Elements of complete application.
§ 301-10.5
Town authority and departmental review; application copies.
§ 301-10.6
Application filing fees.
§ 301-10.7
Technical review escrow; consultant selection and appeal.
§ 301-10.8
Review of conditions claimed to render project uneconomic; pro forma and escrow requirements.
§ 301-10.9
Public hearing and decision.
§ 301-10.10
Changes in application.
§ 301-10.11
Appeals.
§ 301-10.12
Other provisions.
Ch 301 Art 11
Severability
§ 301-11.1
Severability.
Ch 302
Planning Board
Ch 303
Conservation Commission
Ch 304
Board of Health
Ch 305
Board of Water Commissioners
Ch 306
Board of Selectmen
Ch 307
Cemetery Committee
Ch 308
Permanent Drainage Committee
Derivation Table
Ch DT
Derivation Table
Disposition List
Ch DL
Disposition List
Charter
Code
New Laws (8)
Index
Print
Email
Download
Share
Get Updates
arrow_back
Town of Norwell, MA
/
Division 4: Rules and Regulations
Chapter 301
Board of Appeals
arrow_forward
[HISTORY: Adopted by the Board of Appeals of the Town of Norwell
7-22-2008
; amended
4-30-2014
, ratified 6-25-2014. Subsequent amendments noted where applicable.]
GENERAL REFERENCES
Zoning — See Ch.
201
.
Article 1
General Provisions
§ 301-1.1
Purpose; filing; amendments; references.
§ 301-1.2
Board powers.
§ 301-1.3
Types of appeals, applications and petitions.
Article 2
Board Organization
§ 301-2.1
Elections.
§ 301-2.2
Chair.
§ 301-2.3
Vice Chair.
§ 301-2.4
Clerk.
§ 301-2.5
Panel members and hearing chair.
§ 301-2.6
Associates and special alternates.
§ 301-2.7
Quorum.
§ 301-2.8
Hearings, meetings and site walks.
§ 301-2.9
Legal record.
§ 301-2.10
Policies and advice.
Article 3
Pre-Application Process
§ 301-3.1
Requirements by application type.
§ 301-3.2
Other approvals.
Article 4
Application Process
§ 301-4.1
Commencement of proceedings.
§ 301-4.2
Application forms and supporting documents; filing fee and escrow schedule.
§ 301-4.3
Notice to abutters.
§ 301-4.4
Filing application.
§ 301-4.5
Supplemental information.
§ 301-4.6
Number of copies.
§ 301-4.7
Application filing fee; escrow funds.
Article 5
Pre-Hearing Process
§ 301-5.1
Notice, hearings and decision.
§ 301-5.2
Scheduling public hearing.
§ 301-5.3
Public hearing and decision timelines.
§ 301-5.4
Public notice and notification to parties in interest.
§ 301-5.5
Zoning Bylaw and documents availability; Town website.
Article 6
Public Hearing Process
§ 301-6.1
Hearing procedure.
§ 301-6.2
Applicant's submission.
§ 301-6.3
Applicant's representatives and presentation.
§ 301-6.4
Examination by Board.
§ 301-6.5
Submission of evidence; witnesses, speakers and oaths.
§ 301-6.6
Proponents.
§ 301-6.7
Opponents.
§ 301-6.8
Interested and concerned citizens.
§ 301-6.9
Other counsel or representatives.
§ 301-6.10
Reports.
§ 301-6.11
Rebuttals.
§ 301-6.12
Briefs.
§ 301-6.13
Decision.
Article 7
Action by Board
§ 301-7.1
Voting requirements.
§ 301-7.2
Withdrawal.
§ 301-7.3
False or misleading information.
§ 301-7.4
Appeal of Board decision.
§ 301-7.5
Recording of decision.
§ 301-7.6
Repetitive petitions.
§ 301-7.7
Limitation on approval; extensions.
§ 301-7.8
Waiver of requirements; additional information.
Article 8
Projects Subject to Site Plan Requirements
§ 301-8.1
Documentation required.
§ 301-8.2
Technical review.
§ 301-8.3
Performance guarantees; certificates of occupancy; as-built plans.
§ 301-8.4
Site plan changes and modifications.
Article 9
Stormwater Management Requirements
§ 301-9.1
Requirements and purpose.
§ 301-9.2
Documentation and plans.
§ 301-9.3
Drainage specifications.
§ 301-9.4
Drainage design.
§ 301-9.5
General requirements.
§ 301-9.6
Data submission.
§ 301-9.7
Construction plan/erosion and sedimentation control plan.
§ 301-9.8
Operations and maintenance plan.
§ 301-9.9
Minimum design criteria for stormwater basins and subsurface systems.
§ 301-9.10
Minimum design criteria for drainage pipes.
§ 301-9.11
Drainage easements.
§ 301-9.12
Homeowners' association requirements.
§ 301-9.13
Installation; gas and sand traps; excavation; gravel removal.
Article 10
Comprehensive Permits
§ 301-10.1
Purpose; applicability of other rules and regulations.
§ 301-10.2
Definitions.
§ 301-10.3
Minimum jurisdictional requirements for filing application.
§ 301-10.4
Elements of complete application.
§ 301-10.5
Town authority and departmental review; application copies.
§ 301-10.6
Application filing fees.
§ 301-10.7
Technical review escrow; consultant selection and appeal.
§ 301-10.8
Review of conditions claimed to render project uneconomic; pro forma and escrow requirements.
§ 301-10.9
Public hearing and decision.
§ 301-10.10
Changes in application.
§ 301-10.11
Appeals.
§ 301-10.12
Other provisions.
Article 11
Severability
§ 301-11.1
Severability.