[Ord. 3-2016, 10/13/2016]
1.
No regulated activities shall commence until the municipality approves a plan which demonstrates compliance with the requirements of this chapter.
2.
Plans approved by the municipality shall be on site throughout the duration of the regulated activity.
3.
The municipality may, after consultation with the DEP, approve methods for meeting the state water quality requirements other than those in this chapter, provided that they meet the minimum requirements of, and do not conflict with, state law, including, but not limited to, the Clean Streams Law.[1]
[1]
Editor's Note: See 35 P.S. § 691.1 et seq.
4.
For all regulated activities, implementations of water quality controls are required.
5.
For all regulated activities equal to or greater than 1,000 square feet in area, implementation of peak rate controls and preparation of an SWM site plan are required.
6.
Impervious Areas:
A.
The measurement of impervious areas shall include all of the impervious areas in the total proposed development, even if development is to take place in stages.
B.
For development taking place in stages, the entire development plan must be used in determining conformance with this chapter.
C.
For projects that add impervious area to a parcel, the total impervious area on the parcel is subject to the requirements of this chapter.
7.
Discharges onto adjacent property shall not be created, increased, decreased, relocated, or otherwise altered without permission of the adjacent property owner(s). Such discharges shall be subject to the requirements of this chapter.
8.
All regulated activities shall include such measures as necessary to:
A.
Protect health, safety, and property;
C.
Meet the water quality goals of this chapter by implementing measures to:
(1)
Minimize disturbance to floodplains, wetlands, natural slopes over 15%, and existing native vegetation.
(2)
Preserve and maintain trees and woodlands. Maintain or extend riparian buffers and protect existing forested buffer. Provide trees and woodlands adjacent to impervious areas whenever feasible.
(3)
Establish and maintain nonerosive flow conditions in natural flow pathways.
(4)
Minimize soil disturbance and soil compaction. Cover disturbed areas with topsoil having a minimum dept of four inches. Use tracked equipment for grading when feasible.
(5)
Disconnect impervious surfaces by directing runoff to pervious areas.
9.
The design of all facilities over karst shall include an evaluation of measures to minimize adverse effects.
10.
The design storm volumes to be used in the analysis of peak rates of discharge should be obtained from the Precipitation-Frequency Atlas of the United States. Atlas 14, Volume 2, United States Department of Commerce, National Oceanic and Atmospheric Administration, National Weather Service, Hydrometeorological Design Studies Center, Silver Spring, Maryland, 20910. NOAA's Atlas 14 can be accessed at Internet address: http://hdsc.nws.noaa.gov/hdsc/pfds/.