[Ord. 334 (92-1), 2/5/1992, § 701]
1.
The Borough shall required a performance bond in favor of the Borough in an amount equal to 110% of the estimated cost of all stormwater management facilities. Said bond shall be conditioned upon the faithful performance of the control measures specified on the plan within the times specified or within any extension thereof granted by the Borough. Said bond shall terminate when all control measures as shown on the approved plan are completed and approved by the Borough Engineer.
2.
In lieu of the required bonds, the applicant may deposit funds or securities in an escrow account satisfactory to the Borough Solicitor. Funds deposited in this account for guaranteeing the construction or maintenance of control measures shall be used for these purposes only.