[Ord. 899-8, 9/13/1989; as amended by Ord. 9711-6, 11/12/1997, § 185-37]
1. Sewage Disposal Requirements.
A. Prior to the construction of any sanitary sewer facilities, formal application shall be made to the Pennsylvania Department of Environmental Protection and the necessary permits obtained.
B. When installing public sewers, construction of such facilities shall comply with specifications set forth in the Red Lion Construction and Materials Specifications for Land Development. Upon completion of the sanitary sewer installation, a reproducible as-built plan of the system must be filed with the Borough.
2. Water Supply Requirements.
A. All water supply systems must be in accordance with the minimum standards approved by the Pennsylvania Department of Environmental Protection.
B. When installing a public water supply system, upon completion, a reproducible as-built plan of the system must be filed with the Borough.
C. If water is to be provided by means other than by private wells owned and maintained by the individual owners of lots within the proposed development, applicants shall present evidence to the Borough Council or the Planning Commission, as the case may be, that the proposed development is to be supplied by a certified public utility, a bona fide cooperative association of lot owners or by a municipal corporation, authority or utility. A copy of a certificate of public convenience from the Pennsylvania Public Utility Commission or an application for such certificate, a cooperative agreement or a commitment or agreement to serve the area in question, whichever is appropriate, shall be acceptable evidence.