A.
Building permits. Where required by the Dallastown Borough Building Permit Ordinance[1] for the erection, enlargement, repair, alteration, moving or demolition of any structure, a building permit must be obtained from the Zoning Officer. The permit application must be accompanied by a site plan to demonstrate conformity to this chapter.
(1)
Lot: the location and dimensions of the lot.
(2)
Streets: names and widths of abutting streets and highways.
(3)
Structures and yards: locations, dimensions and uses of existing and proposed structures and yards on the lot and, as practical, of any existing structures within 100 feet of the proposed structure but off the lot.
(4)
Improvements: proposed off-street parking and loading areas, access drives and walks; proposed sewage disposal system, water supply system and other utilities.
B.
Use certificates. A use certificate certifying compliance with this chapter must be obtained from the Zoning Officer for any new structure as below or for any change of use of a structure or land as set forth below before such new structure or use or change of use is occupied or established.
(1)
Use of a building or structure erected, structurally altered or extended or moved after the effective date of this chapter.
(2)
Use of vacant land except for horticultural purposes.
(3)
Any change in a conforming use of a building or structure or land.
(4)
Any change from a nonconforming use of a building or structure or land to a conforming use.
(5)
Any change in the use of a building or structure or land from that permitted by any variance of the Zoning Hearing Board.
(6)
Temporary garage, yard, attic, barn or similar types of sales. The application for a use certificate must include a statement of the intended use and any existing use of the structure or land. The certificate continues in effect as long as the use of the structure or land for which it is granted conforms with this chapter or until change of occupancy.
C.
Use certificate for an existing use. An owner may, in writing, request the Zoning Officer to issue a use certificate for any existing structure or land, after the effective date of this chapter or on the effective date of any amendment and at that time in conformity with this chapter.
D.
Temporary permits; application. A person may request a temporary special exception for a nonconforming structure or use which is or will be seasonal or is or will be in the public interest.