Unless specifically defined below, words and phrases used in
this chapter shall be interpreted so as to give this chapter its most
reasonable application.
ACCESSORY USE OR STRUCTURE
A use or structure on the same lot with, and of a nature
customarily incidental and subordinate to, the principal use or structure.
BASE FLOOD
A flood which has a one-percent chance of being equaled or
exceeded in any given year (also called the "one-hundred-year flood"
or "one-percent annual chance flood").
BASE FLOOD DISCHARGE
The volume of water resulting from a base flood as it passes
a given location within a given time, usually expressed in cubic feet
per second(cfs).
BASE FLOOD ELEVATION (BFE)
The elevation shown on the FIRM for zones AE, AH, A1-30 that
indicates the water surface elevation resulting from a flood that
has a one-percent or greater chance of being equaled or exceeded in
any given year.
BASEMENT
Any area of the building having its floor below ground level
on all sides.
BUILDING
A combination of materials to form a permanent structure
having walls and a roof. Included shall be all manufactured homes
and trailers to be used for human habitation.
DCED
The Pennsylvania Department of Community and Economic Development
or any agency successor thereto.
DEP
The Pennsylvania Department of Environmental Protection or
any agency successor thereto.
DEVELOPMENT
Any man-made change to improved or unimproved real estate,
including, but not limited to, the construction, reconstruction, renovation,
repair, expansion, or alteration of buildings or other structures;
the placement of manufactured homes; streets and other paving; utilities;
filling, grading and excavation; mining; dredging; drilling operations;
storage of equipment or materials; and the subdivision of land.
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction
of facilities for servicing the lots on which the manufactured homes
are to be affixed (including, at a minimum, the installation of utilities,
the construction of streets, and either final site grading or the
pouring of concrete pads) is completed before the effective date of
the floodplain management regulations adopted by the Borough.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
The preparation of additional sites by the construction of
facilities for servicing the lots on which the manufactured homes
are to be affixed (including the installation of utilities, the construction
of streets, and either final site grading or the pouring of concrete
pads).
FEMA
The Federal Emergency Management Agency or any agency successor
thereto.
FLOOD
A temporary inundation of normally dry land areas.
FLOOD INSURANCE RATE MAP (FIRM)
The official map on which the FEMA has delineated both the
areas of special flood hazards and the risk premium zones applicable
to the Borough.
FLOOD INSURANCE STUDY (FIS)
The official report provided by FEMA that includes flood
profiles, the FIRM, the Flood Boundary and Floodway Map, and the water
surface elevation of the base flood.
FLOODPLAIN AREA
A relatively flat or low land area which is subject to partial
or complete inundation from an adjoining or nearby stream, river or
watercourse; and/or any area subject to the unusual and rapid accumulation
of surface waters from any source.
FLOODPROOFING
Any combination of structural and nonstructural additions,
changes, or adjustments to structures which reduce or eliminate flood
damage to real estate or improved real property, water and sanitary
facilities, structures and their contents.
FLOODWAY
The channel of a river or other watercourse and the adjacent
land areas that must be reserved in order to discharge the base flood
without cumulatively increasing the water surface elevation more than
one foot.
HIGHEST ADJACENT GRADE
The highest natural elevation of the ground surface prior
to construction next to the proposed walls of a structure.
HISTORIC STRUCTURE
Any structure that is:
A.
Listed individually in the National Register of Historic Places
(a listing maintained by the Department of Interior) or preliminarily
determined by the Secretary of the Interior as meeting the requirements
for individual listing on the National Register;
B.
Certified or preliminarily determined by the Secretary of the
Interior as contributing to the historical significance of a registered
historic district or a district preliminarily determined by the Secretary
to qualify as a registered historic district;
C.
Individually listed on a commonwealth inventory of historic
places.
IDENTIFIED FLOODPLAIN AREA
This term is an umbrella term that includes all of the areas within which the Borough has selected to enforce floodplain regulations. It will always include the area identified as the Special Flood Hazard Area on the FIRM and FIS. See §§
171-17 and
171-18 for the areas included in the identified floodplain area.
LOWEST FLOOR
The lowest floor of the lowest fully enclosed area (including
basement). An unfinished, flood-resistant partially enclosed area,
used solely for parking of vehicles, building access, and incidental
storage, in an area other than a basement area is not considered the
lowest floor of a building, provided that such space is not designed
and built so that the structure is in violation of the applicable
nonelevation design requirements of this chapter.
MANUFACTURED HOME
A structure, transportable in one or more sections, which
is built on a permanent chassis, and is designed for use with or without
a permanent foundation when attached to the required utilities. The
term includes park trailers, travel trailers, recreational and other
similar vehicles which are placed on a site for more than 180 consecutive
days.
MINOR REPAIR
The replacement of existing work with equivalent materials
for the purpose of its routine maintenance and upkeep, but not including
the cutting away of any wall, partition or portion thereof, the removal
or cutting of any structural beam or bearing support, or the removal
or change of any required means of egress, or rearrangement of parts
of a structure affecting the exitway requirements; nor shall minor
repairs include addition to, alteration of, replacement or relocation
of any standpipe, water supply, sewer, drainage, drain leader, gas,
oil, waste, vent, or similar piping, electric wiring, mechanical or
other work affecting public health or general safety.
NEW CONSTRUCTION
Structures for which the start of construction commenced
on or after the effective date of these floodplain regulations were
adopted by the Borough, and includes any subsequent improvements thereto.
Any construction started after January 8, 1980, and before the effective
date of these floodplain regulations is subject to the regulations
in effect at the time the permit was issued, provided the start of
construction was within 180 days of permit issuance.
NEW MANUFACTURED HOME PARK OR SUBDIVISION
A manufactured home park or subdivision for which the construction
of facilities for servicing the lots on which the manufactured homes
are to be affixed (including at a minimum, the installation of utilities,
the construction of streets, and either final site grading or the
pouring of concrete pads) is completed on or after the effective date
of floodplain management regulations adopted by the Borough.
PERSON
An individual, partnership, public or private association
or corporation, firm, trust, estate, municipality, governmental unit,
public utility or any other legal entity whatsoever, which is recognized
by law as the subject of rights and duties.
RECREATIONAL VEHICLE
A vehicle which is built on a single chassis; not more than
400 square feet, measured at the largest horizontal projections; designed
to be self-propelled or permanently towable by a light-duty truck,
and not designed for use as a permanent dwelling but as temporary
living quarters for recreational, camping, travel, or seasonal use.
REGULATORY FLOOD ELEVATION
The base flood elevation (BFE) or estimated flood height
as determined using simplified methods plus a freeboard safety factor
of 1 1/2 feet.
SPECIAL FLOOD HAZARD AREA (SFHA)
An area in the floodplain subject to a one-percent-or-greater
chance of flooding in any given year. It is shown on the FIRM as zone
A, AO, A1 A30, AE, A99, or AH.
START OF CONSTRUCTION
Includes substantial improvement and other proposed new development
and means the date the permit was issued, provided the actual start
of construction, repair, reconstruction, rehabilitation, addition,
placement, or other improvement was within 180 days after the date
of the permit and shall be completed within 12 months after the date
of issuance of the permit unless a time extension is granted, in writing,
by the floodplain administrator. The "actual start" means either the
first placement of permanent construction of a structure on a site,
such as the pouring of slab or footings, the installation of piles,
the construction of columns, or any work beyond the stage of excavation;
or the placement of a manufactured home on a foundation. Permanent
construction does not include land preparation, such as clearing,
grading, and filling; nor does it include the installation of streets
and walkways; nor does it include excavation for a basement, footings,
piers, or foundations or the erection of temporary forms; nor does
it include the installation on the property of accessory buildings,
such as garages or sheds not occupied as dwelling units or not part
of the main structure. For a substantial improvement, the "actual
start of construction" means the first alteration of any wall, ceiling,
floor, or other structural part of a building, whether or not that
alteration affects the external dimensions of the building.
STRUCTURE
A walled and roofed building, including a gas or liquid storage
tank that is principally above ground, as well as a manufactured home.
SUBDIVISION
The division or redivision of a lot, tract, or parcel of
land by any means into two or more lots, tracts, parcels or other
divisions of land, including changes in existing lot lines for the
purpose, whether immediate or future, of lease, partition by the court
for distribution to heirs, or devisees, transfer of ownership or building
or lot development. Provided, however, that the subdivision by lease
of land for agricultural purposes into parcels of more than 10 acres,
not involving any new street or easement of access or any residential
dwelling, shall be exempted.
SUBSTANTIAL DAMAGE
Damage from any cause sustained by a structure whereby the
cost of restoring the structure to its before-damaged condition would
equal or exceed 50% or more of the market value of the structure before
the damage occurred.
SUBSTANTIAL IMPROVEMENT
Any reconstruction, rehabilitation, addition, or other improvement
of a structure, of which the cost equals or exceeds 50% of the market
value of the structure before the start of construction of the improvement.
This term includes structures which have incurred substantial damage
regardless of the actual repair work performed. The term does not,
however, include any project for improvement of a structure to correct
existing violations of state or Borough health, sanitary, or safety
code specifications which have been identified by the Borough Code
Enforcement Official and which are the minimum necessary to assure
safe living conditions.
UNIFORM CONSTRUCTION CODE (UCC)
The statewide building code adopted by the Pennsylvania General
Assembly in 1999 applicable to new construction in all municipalities
whether administered by the municipality, a third-party or the Department
of Labor and Industry. Applicable to residential and commercial buildings,
the code adopted the International Residential Code (IRC) and the
International Building Code (IBC), by reference, as the construction
standard applicable with the state floodplain construction. For coordination
purposes, references to the above are made specifically to various
sections of the IRC and the IBC.
VARIANCE
A grant of relief by the Borough from the terms of a floodplain
management regulation.
VIOLATION
The failure of a structure or other development to be fully
compliant with this chapter. A structure or other development without
the elevation certificate, other certifications, or other evidence
of compliance required in 44 CFR § 60.3(b)(5), (c)(4), (c)(10),
(d)(3), (e)(2), (e)(4), or (e)(5) is presumed to be in violation until
such time as that documentation is provided.