[Ord. 585, 9/12/2011]
For any regulated activities not eligible for the exemptions provided in §
23-302, the final approval of subdivision and/or land development plans, the issuance of any building or occupancy permit, or the commencement of any land disturbance activity, may not proceed until the applicant has received written approval of a SWM site plan and report from the Borough.
[Ord. 585, 9/12/2011]
A modification to a submitted SWM site plan and report for a
project site that involves a change in stormwater management facilities
or techniques, or that involves the relocation or redesign of stormwater
management facilities, or that is necessary because soil or other
conditions are not as stated on the SWM site plan and report as determined
by the Borough, shall require a resubmission of the SWM site plan
and report in accordance with this chapter.
[Ord. 585, 9/12/2011]
A disapproved SWM site plan and report may be resubmitted with
the revisions addressing the Borough's concerns documented in
writing, to the Borough Enforcement Officer in accordance with this
chapter. A Borough review fee may be required by the Borough for resubmission
of a disapproved SWM site plan and report.
[Ord. 585, 9/12/2011]
Borough approval of a SWM site plan and report authorizes the
regulated activities documented in the SWM site plan and report for
a maximum term of five years following the date of approval. The Borough
may specify a term shorter than five years in the approval for any
specific SWM site plan and report. If stormwater management facilities
included in the approved SWM site plan and report have not been constructed,
or if a record drawing of these facilities has not been submitted
within this time, then the Borough may consider the SWM site plan
and report disapproved and may revoke any and all permits or approvals.