[Ord. 252, 5/24/2004, § 601]
The fees required by this chapter are the Borough Engineer or
outside review agency review fee and Borough review fee. Fees shall
be established by the Borough to defray review costs incurred by the
Borough, any outside review agencies or entities necessary to review
submitted plans, and the Borough Engineer. The applicant shall pay
all fees.
[Ord. 252, 5/24/2004, § 602]
The Borough shall establish a review fee schedule by resolution
of the Borough Council based on the size of the regulated activity
and based on the Borough's costs for reviewing stormwater management
site plans. The Borough shall periodically update the review fee schedule
to ensure that review costs are adequately reimbursed.
[Ord. 252, 5/24/2004, § 603]
1. The fees required by this chapter shall at a minimum cover:
B. The review of the stormwater management site plan by the Borough
and the Borough Engineer or other qualified persons designated by
the Borough.
D. The inspection of stormwater management facilities and drainage improvements
during construction.
E. The final inspection upon completion of the stormwater management
facilities and drainage improvements presented in the stormwater management
site plan.
F. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and assure proper completion
of stipulated remedial actions.