[Ord. No. 03-21-06-01, §§ 1
— 9, 3-21-2006]
A. Compliance with Highway 33/Main Street Corridor Site Plan Review
and Design Standards required. Any owner or authorized agent who intends
to construct new development or commence new construction, or to make
significant modifications or expansion of existing buildings or structures
upon properties immediately adjacent to State Highway 33 (Main Street)
in the City of Cushing shall comply with the Highway 33/Main Street
Corridor Site Plan Review and Design Standards as set forth herein
before a building permit will be issued.
B. Purpose of site plan review and design standards. The Highway 33/Main
Street Corridor (corridor) is the City's primary high-intensity
commercial zone, the major transportation artery, and one of the most
significant visual features of the community. The purpose of site
plan review and design standards is to ensure that development in
the corridor contributes to the highest utilization and performance
of commercial properties, supports safe and efficient travel and circulation,
and creates and maintains a high aesthetic standard. The principal
goal of these standards is to enhance the quality-of-life in Cushing,
and preserve its image as a desirable place to live, operate a business,
and visit.
C. "Corridor" defined. For the purpose of these regulations, "corridor"
refers to all properties immediately adjacent to Highway 33/Main Street,
from the eastern to the western limits of the City.
D. Applicability of standards. Within the corridor, a site plan review
approval based on the herein described guidelines and standards shall
be required for the issuance of a permit for any new development/construction.
These standards shall only apply to issuance of permits relating to
existing development under the following conditions:
(1) Any modification, alteration, or expansion of any structure or major
site characteristic (landscaping, architecture, parking and circulation,
signs) of 50% or greater; or,
(2) Lot consolidation or a change in the zoning lot of record; or
(3) Change in roadway access.
|
Unless otherwise required by City general or zoning ordinance,
these standards, when applied to existing development, shall accommodate
existing conditions to the greatest extent possible.
|
E. Site plan review process.
(1) Prior to obtaining any permit for any of the aforementioned activities,
the property owner or the owner's designated agent shall submit
an application for site plan approval to the code official. Within
a reasonable time frame allowing for review of submitted information,
the site plan shall be reviewed by the site plan review committee.
If the proposed application is found to meet design requirements,
the committee shall issue a site plan approval. If the application
is found to be deficient in content or fails to meet design requirements,
the committee shall indicate such deficiencies to the applicant who
may make adjustments and resubmit.
(2) An application is considered to meet the design requirements herein
if the review committee, in its judgment, determines that the application
overall demonstrates reasonable conformity with the purpose, general
guidelines, and elements of design set forth herein. Recognizing that
every property, every proposal, and every situation is unique, the
review committee may waive, modify or lessen any of the standards
herein as it reasonably deems appropriate.
F. Site plan review committee. The site plan review committee shall
be comprised of the City engineer, the code official, and such other
City staff whose technical field may be required.
G. Application contents. Applications for site plan approval shall consist
of a statement of the proposed use and the following:
(2) Adjoining streets, alleys, and adjacent off-site improvements;
(3) Locations and dimensions of existing and proposed improvements including
buildings, fencing, landscaping, off-street parking, trash enclosures;
(5) Site entry and exit and internal circulation; and
(6) Any other data and dimensions necessary to show that all provisions
of these standards are satisfied.
H. General guidelines. These design standards emphasize the use of architectural
design, landscaping, sign control, and other site design and construction
techniques to improve and enhance the use of properties within the
corridor. While specific in some regards, the standards are intended
to achieve certain overall objectives while allowing creativity, innovation,
and accommodating the unique characteristics of a particular property.
The general objectives of the design standards are as follows:
(1) Functionality. A functional design should effectively accommodate
the use or activity for which the development is intended, and provide
for the comfort and ease of access of its users. A functional design
will also provide safe and efficient pedestrian and vehicular links
within the development and between the development and surrounding
properties, roadways, and neighborhoods.
(2) Orderliness. Order means maintaining a sense of continuity and harmony.
Development supports orderliness by not interrupting or conflicting
with the character or pattern of existing surrounding development.
Within a development, order is maintained through the consideration
of building placement, parking and circulation, and through unifying
architectural elements.
(3) Identity. An effective development will convey a sense of its own
unique identity and use while remaining consistent with surrounding
development. Development identity can be enhanced by incorporating
elements that establish visual focus (a clock tower, fountain, unique
landscaping, for example), and by creating a particular "feel" through
building placement or amenities (such as walkways, courtyards, arcades).
(4) Appeal. The development design should be pleasing and attractive,
and contribute in a positive way to the aesthetic quality of Cushing.
Building architecture and sight design should reflect a standard of
quality and excellence, convey a focus on the customer, and suggest
an inviting and enjoyable experience.
I. Elements of design. In addition to any other City ordinance standards
or requirements, including the Cushing Zoning Ordinance, all development
subject to these standards shall incorporate the following, except
where an exemption is granted in site plan review due to specific
property characteristics or overall project considerations:
(1) Landscaping:
a. For lots less than 200 feet in depth, a twenty-foot greenbelt along
the length of the Main Street frontage, inclusive of right-of-way.
The greenbelt shall be turf, with at least 20% dedicated to plantings,
trees, or other landscaping elements (stone, timbers, fountains, etc.).
An approved accent landscape plan is acceptable as an alternative
to the greenbelt.
b. For lots 200 feet or greater in depth, a comprehensive landscape
plan shall be approved for the site.
c. Plantings and other landscaping elements along building walls, should
be used to accent building and entryway, and create transition from
paved areas.
d. Landscape "islands" in the parking areas, of at least 200 square
feet and not less than one per every 20 parking spaces.
e. All landscape materials shall be drought resistant and shall be approved
as to type and amount by the site plan review committee.
(2) Architecture: Design elements and qualities that are to be incorporated
into new construction or expansion include:
a. Variety of surface texture;
b. Wall articulation and relief;
c. Large windows at street level and windows (operable or decorative)
in regular rhythm on all visual sides of buildings to preclude blank
wall space;
d. Detailing such as tile accents, pop-outs, window trim or awnings;
e. Exterior materials shall be of masonry, plaster, stone, brick, stucco,
textured block, EIFS. Other materials will be considered on a case-by-case
basis;
f. Metal buildings are allowed but shall have at least 50% treatment
material treatment (brick, stone, stucco, etc.) on all visual areas;
g. Roofs either shall be peaked or shall be concealed by parapet walls,
mansards, etc.;
h. Roof materials may include concrete tile, slate or metal standing
seam with baked enamel colors. Other materials will be considered
on a case-by-case basis;
i. Roof overhangs proportional to building scale;
j. Large buildings shall avoid a box-like appearance by any or a combination
of the following: varying the plane of exterior walls in depth or
direction; varying building height; varying roofline; creating articulation
of facade by use of color or materials; use of detailing, shadowing,
relief, accents, etc.; and
k. Building placement and orientation should create a harmony with adjacent
properties and within the site. For sites with more than one building,
the structures should be oriented to create a "village center" feel.
Service areas should be located to the rear of the property/buildings,
and screened by fencing or landscaping.
(3) Parking and circulation:
a. Parking should be located at the sides or toward the rear of the
property. Parking fronting on Main Street should be avoided; if necessary,
it should be limited to one row adjacent to the building;
b. Parking areas should be broken up into groups of not more than 20
spaces where possible (35 for large developments), separated by landscaping,
islands, medians, etc.;
c. Parking spaces should be separated from building walls by sidewalks,
curbs, landscaping, etc.;
d. Every effort should be made to link circulation with adjacent properties,
and to use shared parking to minimize parking "fields";
e. Entrances and exits from Main Street should be minimized. Where possible,
there should be a one-hundred-foot separation between driveways; where
not, one-way drives are preferred;
f. Interior circulation should be one-way, where possible, and should
minimize the need for throughways; and
g. Through access to North Street is encouraged; access by way of alleyways
is not.
(4) Signs:
a. Signs should be of design, materials, and scale that comports with
the overall characteristics of the site and buildings;
b. Signs should not be a dominant feature of the site; nor should they
be a distraction for street traffic;
c. Signs on buildings should be incorporated into the architectural
elements; and
d. Streetscape signs should be incorporated into the landscape elements.