A.
Applicant responsibility. In all cases, the applicant shall be responsible for the installation of all improvements required by this chapter.
B.
Preliminary plan approval required. Applicants shall not initiate installation of any required improvements, site alterations or erection of any buildings or structures in any proposed subdivision or land development prior to preliminary plan approval being granted and prior to receipt of all required local, state and federal permits and other approvals.
C.
Compliance. No project shall be considered in compliance with this chapter until the streets, parking facilities, storm drainage facilities, water and sewer facilities, lot line markers and survey monuments and all other required or proposed improvements have been installed in accord with this chapter.
D.
Signature of final plan. No final plan shall be signed by the Board of Supervisors for recording in the office of the County Recorder of Deeds until:
(1)
All improvements required by this chapter and/or shown on the plan are installed to the specifications contained in Article VI and other Township requirements and such improvements are verified by the Township Engineer and are certified as complete and in compliance with this chapter by the applicant's engineer; or
E.
Dedication of improvements. The approval of a final plan by the Board of Supervisors shall not constitute an acceptance of the dedication of any road, street, other proposed public way, space, or area, or any other development improvement shown on the final plan. The Board of Supervisors of Kidder Township does not intend to accept the dedication any of the roads, streets, other proposed public ways, spaces, or areas, or any other development improvements shown on this final plan. The land owner, developer or an association of lot owners shall be responsible for the maintenance of all development improvements subsequent to the construction of the same.