[Ord. 349, 3/20/2017]
A permit shall be required pursuant to this chapter before any
construction or development is undertaken within any identified floodplain
areas of the Township of Lower Heidelberg.
[Ord. 349, 3/20/2017]
A copy of all plans and applications for any proposed construction
or development in any identified floodplain area to be considered
for approval may be submitted by the Floodplain Administrator to any
other appropriate agencies and/or individuals (e.g., planning commission,
municipal engineer, etc.) for review and comment.
[Ord. 349, 3/20/2017]
After the issuance of a permit by the Floodplain Administrator,
no changes of any kind shall be made to the application, permit or
any of the plans, specifications or other documents submitted with
the application or otherwise approved by the Floodplain Administrator
without the written consent or approval of the Floodplain Administrator.
Requests for any such change shall be in writing, and shall be submitted
by the applicant to Floodplain Administrator for consideration.
[Ord. 349, 3/20/2017]
In addition to the permit, the Floodplain Administrator shall
issue a placard which shall be displayed on the premises during the
time construction is in progress. This placard shall show the number
of the permit, the date of its issuance and must bear the signature
of the Floodplain Administrator.