Exhibit A
Comprehensive Schedule of Fees and Charges
| ||
---|---|---|
Records[1]
| ||
Type
|
Fee/Charge
| |
Copies of public records
|
$0.10 per page
| |
Search and retrieval of public records
|
$4.00 per 15 minutes
| |
Penalty for disclosure of closed records
|
Up to $500.00
| |
Court Costs[2]
| ||
Costs of court
[Ord. No. 19-10, 9-17-2019] |
$15.00
| |
Police Officer training fee
|
$3.00
| |
Crime victims compensation fund
|
$7.50
| |
Battered persons shelter costs
|
$2.00
| |
Court automation fund
|
$7.00
| |
Judicial education fund
|
$1.00
| |
Failure to comply with search warrant
|
Not less than $250.00
| |
Annual Animal License Fees[3]
| ||
Male or spayed female animal
|
$3.00
| |
Unspayed female animal
|
$5.00
| |
Replacement license tag
|
$3.00
| |
Animal Regulation Fines[4]
| ||
Dog running at large (1st offense)
|
$25.00
| |
Dog running at large (2nd offense)
|
$50.00
| |
Dog running at large (3rd offense)
|
$100.00
| |
Maximum dog running at large fine
|
$500.00
| |
Animal neglect
|
Up to $500.00
| |
Animal trespass (1st offense)
|
Up to $200.00
| |
Animal trespass (subsequent offenses)
|
Up to $500.00
| |
Dangerous Animal Fines[5]
| ||
Violation of dangerous animal ordinance (1st offense)
|
$200.00
| |
Violation of dangerous animal ordinance (2nd offense)
|
$300.00
| |
Violation of dangerous animal ordinance (3rd offense)
|
$500.00
| |
Animal nuisance (1st offense)
|
$5.00 to $50.00
| |
Animal nuisance (subsequent offenses)
|
$15.00 to $150.00
| |
Public Safety Offenses[6]
| ||
Littering via carcasses
|
$25.00 to $500.00
| |
Corrupting or diverting water supply
|
$50.00 to $500.00
| |
Weapons and Firearms Offenses[7]
| ||
Carrying a concealed firearm, with a concealed carry permit,
but in violation of City ordinance (1st offense)
|
$100.00
| |
2nd offense within 6 months
|
$200.00
| |
3rd offense in 1 year of 1st offense
|
$500.00
| |
Failure to carry concealed carry permit while carrying concealed
weapon
|
$35.00
| |
Offenses Concerning Minors[8]
| ||
Parental responsibility (1st offense)
|
$100.00
| |
Parental responsibility (2nd offense)
|
$200.00
| |
Parental responsibility (3rd and subsequent offenses)
|
$500.00
| |
Restitution
|
Up to $2,000.00
| |
Sale or distribution of tobacco products to minors (1st offense)
|
$25.00
| |
Sale or distribution of tobacco products to minors (2nd offense)
|
$100.00
| |
Sale or distribution of tobacco products to minors (3rd and
subsequent offenses)
|
$250.00
| |
Handbill Distribution[9]
| ||
Unlawful distribution of handbills
|
Up to $500.00
| |
Traffic Violations — General Provisions[10]
| ||
Speeding in a school zone
|
Double the fine, up to $500.00
| |
Traffic Violations — Speed Regulations[11]
| ||
Speeding in a construction zone
|
Double the fine, up to $500.00
| |
Following too closely in a construction zone
|
Double the fine, up to $500.00
| |
Improper lane usage in a construction zone
|
Double the fine, up to $500.00
| |
Careless and imprudent driving in a construction zone
|
Double the fine, up to $500.00
| |
Speeding in a travel safe zone
|
Double the fine, up to $500.00
| |
Following too closely in a travel safe zone
|
Double the fine, up to $500.00
| |
Improper lane usage in a travel safe zone
|
Double the fine, up to $500.00
| |
Careless and imprudent driving in a travel safe zone
|
Double the fine, up to $500.00
| |
Traffic Violations — Miscellaneous Driving Rules[12]
| ||
Failure to yield to a funeral procession
|
Up to $100.00
| |
Special permit for use of utility vehicles on highways
|
$15.00
| |
Special license for special uses of recreational off-highway
vehicles on highways
|
$15.00
| |
Moving violation in an emergency zone (1st offense)
|
$35.00 (in addition to other fines authorized by law)
| |
Moving violation in an emergency zone (2nd and subsequent offenses)
|
$75.00 (in addition to other fines authorized by law)
| |
Speeding violation in an emergency zone (1st offense)
|
$250.00 (in addition to other fines authorized by law)
| |
Speeding violation in an emergency zone (2nd offense)
|
$300.00 (in addition to other fines authorized by law)
| |
Traffic Violations — Stopping, Standing Or Parking[13]
| ||
Parking in a physically disabled parking space
|
Up to $225.00
| |
Violation of Section 355.100, Physically Disabled Parking, generally
|
Not less than $50.00 nor more than $300.00
| |
Violation of Table III-A, Emergency And Snow Routes
|
$10.00 to $500.00
| |
Traffic Violations — Vehicle Equipment[14]
| ||
Driving without headlights when required
|
$10.00
| |
Permit for curb loading zone
|
$10.00 per year or fraction thereof
| |
Up to $50 and court costs
| ||
Failure to wear a seat belt
|
$10.00
| |
Failure to wear protective headgear on a motorcycle
|
Up to $25.00
| |
Traffic Violations — Bicycles And Motorized Bicycles[15]
| ||
Violation of bicycle operation ordinance (by an individual over
17 years of age)
|
$5.00-$25.00
| |
Traffic Violations — Licensing Requirements[16]
| ||
Deposit for temporary dealer sale vehicle plates
|
$10.50
| |
Traffic Violations — Abandoned Vehicles[17]
| ||
Obstructing the flow of traffic
|
$10.00 to $50.00
| |
Land Development — General Provisions[18]
| ||
Use of unapproved plat in sale of land
|
Up to $300.00 per lot sold
| |
Violation of land development regulations (1st offense)
|
Up to $200.00
| |
Violation of land development regulations (2nd within a 12-month
period beginning with the 1st violation)
|
Up to $275
| |
Violation of land development regulations (3rd within a 12-month
period beginning with the 1st violation)
|
Up to $350
| |
Violation of land development regulations (4th within a 12-month
period beginning with the 1st violation)
|
Up to $450
| |
Failure to comply with order to remove violation of land use
regulation
|
$250.00
| |
Land Development — Floodplain Management[19]
| ||
Floodplain management violation
|
Up to $500.00
| |
Land Development — Infrastructure Standards[20]
| ||
Electrical and communication line utility permit
|
Pursuant to City's Fee Schedule
| |
Building Permit Fees[21]
| ||
New Buildings, Building Additions, Garages (attached or
detached), Freestanding Structures, Structural Decks and Porches[22]
| ||
Finished areas
|
$1.45 per square foot
| |
Unfinished areas
|
$1.00 per square foot
| |
Decks
|
$0.50 per square foot
| |
Interior Remodel[23]
| ||
Work performed within existing footings (building footprint)
of the structure to be remodeled
|
$1.00 per square foot
| |
Miscellaneous Building Permits[24]
| ||
Dock and boat lift electrical inspection (new or relocate)
|
$100.00
| |
Fence (with survey and property pins marked)
|
$75.00
| |
Retaining wall — under 4 feet in height measured from
the bottom of the footing to the top of the wall and non-load-bearing
|
Exempt
| |
Retaining wall — under 4 feet in height measured from
the bottom of the footing to the top of the wall — subject to
inspection; footing and drainage inspection
|
$150.00
| |
Retaining wall — over 4 feet in height, measured from
the bottom of footing to top of the wall — administrative fee
|
$100.00
| |
Third-party inspection for all retaining walls used for structural
support (supporting a surcharge) to be completed and on file with
the City
|
At owners' expense
| |
Signs
|
$150.00 (plus $1.00 per square foot)
| |
Swimming Pools and Hot Tubs greater than 24" in depth from the
flood rim:
| ||
Prefabricated hot tubs and above ground pools (electrical and
enclosure inspection)
|
$200.00
| |
In ground hot tubs and swimming pools
|
$200.00 minimum (plus $20.00 per 1,000 gallons)
| |
Roof — administrative fee
|
$75.00
| |
Exterior steps of 4 or more consecutive risers with required
hand railings
|
$150.00
| |
Sewer line repairs and inspection, coordinated with Director
of Public Works
|
$100.00
| |
Driveways and flatwork and steps with less than 4 consecutive
risers — administrative fee
|
$100.00
| |
Mechanical trams, rail lifts and elevators — electrical
inspection
|
$150.00
| |
Mechanical trams, rail lifts and elevators — third-party
inspection must be completed and on file
|
At owners' expense
| |
Decks — 100 square feet or less, attached or unattached
to the dwelling, under 30 inches in height at the tallest point and
do not interfere with doors of egress
|
No permit required
| |
Decks — greater than 30 inches in height at the tallest
point above the ground, attached or unattached to the dwelling and
do not interfere with doors of egress
|
$75.00 minimum permit fee $0.50 per square foot
| |
Plumbing, heating, air-conditioning and electrical fee; includes
but not limited to the following installations and services:
|
$50.00
| |
Water heater replacement and installation; natural gas, liquid
propane or electric
| ||
Furnace boiler installation; natural gas, liquid propane or
electric
| ||
Electrical connections, service upgrades, rewiring and relocations
for permanently installed equipment and appliances, including but
not limited to emergency generators, ovens and kitchen ranges, air-conditioning
system components
| ||
Service-related work in the above trades is excluded
| ||
Certificate of Occupancy[25]
| ||
Nonresidential certification of occupancy
|
$100.00
| |
Demolition Permits
| ||
Demolition permit: 0 to 500 square feet
|
$50.00
| |
Demolition permit: 501 to 1,000 square feet
|
$200.00
| |
Demolition permit: 1,001 to 5,000 square feet
|
$400.00
| |
Demolition permit: over 5,000 square feet
|
$600.00
| |
Excavation Permit
| ||
Excavation permit
|
$50.00
| |
Floodplain Certificates/Permits
| ||
Floodplain certificate letter fee (includes engineer fee)
|
$200.00
| |
Floodplain development permit fee (includes engineering fee)
|
$300.00
| |
Grading Permits
| ||
Grading permit fee — residential site
|
$100.00
| |
Grading permit fee — multi-family site
|
$200.00
| |
Grading permit fee — nonresidential
|
$300.00 per unit
| |
Re-Inspection Fees[26]
| ||
Re-inspection fee (inspections that have been scheduled, then
cancelled, postponed or found to be not ready for inspection after
the Code Official has arrived at the inspection site)
|
$75.00
| |
Permit Expiration and Extension
| ||
Permit expiration and extension fee
|
$250.00
| |
On-Site Wastewater (Septic) System Fees[27]
| ||
Residential single family
|
$150.00
| |
Residential multi-family
|
$150.00 administrative fee, $75.00 per unit
| |
Non-residential
|
$300.00
| |
Sewer Permit Fees
| ||
Sewer permit — residential site
|
$50.00 administration fee, $75.00 lot fee
| |
Sewer permit — multi-family residential
|
$75.00 administration fee, $200.00 per unit
| |
Sewer permit — nonresidential
|
$100.00 administration fee, $200.00 per connection
| |
Sewer tap fee
|
$5,000.00
| |
Fee for property outside the benefited district to buy back
into the district
|
$0.20 per square foot per lot
| |
Plan Review Fees[28]
| ||
Plan review — new home
|
$150.00
| |
Plan review — home remodel and decks
|
$75.00
| |
Development Approval Fees
| ||
All required certified notices to be paid by the applicant
|
$6.00
| |
Administrative appeal fee
|
$300.00
| |
Annexation fee (includes engineer fee)
| ||
0 to 5 acres
|
$500.00
| |
5 to 10 acres
|
$1,000.00
| |
10 to 15 acres
|
$1,500.00
| |
15 to 20 acres
|
$2,000.00
| |
Over 20 acres
|
$3,000.00
| |
Comprehensive plan amendment fee — all text amendments
|
$500.00
| |
Concept plan review fees for concept plan (includes engineer
fee)
| ||
1 to 50 lots
|
$200.00 base fee;
$6.00 lot fee;
$206.00 minimum;
$500.00 maximum
| |
51 to 150 lots
|
$200.00 base fee;
$6.50 lot fee;
$531.50 minimum;
$1,175.00 maximum
| |
151 to 500 lots
|
$200.00 base fee;
$7.00 lot fee;
$1,257.00 minimum;
$3,700.00 maximum
| |
Over 500 lots
|
$200.00 base fee;
$7.50 lot fee;
$3,950.00 minimum;
TBD — maximum
| |
Conditional use permit
| ||
0 to 5 acres
|
$500.00*
| |
5 to 10 acres
|
$1,000.00*
| |
10 to 15 acres
|
$1,500.00*
| |
15 to 20 acres
|
$2,000.00*
| |
Over 20 acres
|
$3,000.00*
| |
* Should any extraordinary circumstances be involved which require
special (or) additional outside consulting services, the fees shown
will be adjusted to include such additional cost to the City. The
applicant will be advised of these requirements before the City accepts
the application.
| ||
Public improvements plan review (includes engineering fee) —
1 to 50 lots
|
3% of the estimated public improvement construction cost
| |
Public improvements plan review (includes engineering fee) —
over 50 lots
|
2% of the estimated public improvement construction cost
| |
Construction plan review
| ||
1 to 10 lots
|
$50.00 base;
$1.00 lot fees;
$51.00 minimum;
$60.00 maximum
| |
11 to 50 lots
|
$50.00 base;
$1.50 lot fees;
$66.50 minimum;
$125.00 maximum
| |
51 to 150 lots
|
$50.00 base;
$2.00 lot fees;
$152.00 minimum;
$350.00 maximum
| |
151 to 500 lots
|
$50.00 base;
$2.50 lot fees;
$427.50 minimum;
$1,300.00 maximum
| |
Over 500 lots
|
$50.00 base;
$2.50 lot fees;
$1,300.00 minimum;
$1,300.00 maximum
| |
Development Code amendments — final plat (all text amendments)
|
$500.00
| |
Final plat (includes engineer fee)
| ||
1 to 50 lots
|
$300.00 base; $14.50 lot fees;
$314.50 minimum;
$445.00 maximum
| |
51 to 150 lots
|
$300.00 base;
$15.50 lot fees;
$1,090.50 minimum;
$2,625.00 maximum
| |
151 to 500 lots
|
$300.00 base;
$16.00 lot fees;
$2,716.00 minimum;
$8,300.00 maximum
| |
Over 500 lots
|
$300.00 base;
$16.00 lot fees;
$8,300.00 minimum;
TBD — maximum
| |
Lot split fees
|
$250.00
| |
Non-conforming use
|
$250.00
| |
Planned development fees (includes engineer fee)
| ||
1 to 50 lots
|
$300.00 base;
$14.50 lot fees;
$314.50 minimum;
$1,025.00 maximum
| |
51 to 150 lots
|
$300.00 base;
$15.50 lot fees;
$1,090.50 minimum;
$2,625.00 maximum
| |
151 to 500 lots
|
$300.00 base;
$16.00 lot fees;
$2,716.00 minimum;
$8,300.00 maximum
| |
Over 500 lots
|
$300.00 base;
$16.00 lot fees;
$8,300.00 minimum;
TBD — maximum
| |
Preliminary plats and preliminary plat amendments (includes
engineer fee)
| ||
1 to 50 lots
|
$300.00 base;
$9.50 lot fees;
$309.50 minimum;
$775.00 maximum
| |
51 to 150 lots
|
$300.00 base;
$10.50 lot fees;
$3,835.50 minimum;
$1,875.00 maximum
| |
150 to 500 lots
|
$300.00 base;
$11.00 lot fees;
$1,961.00 minimum;
$5,800.00 maximum
| |
Over 500 lots
|
$300.00 base;
$11.00 lot fees;
$5,800.00 minimum;
TBD — maximum
| |
Re-plat plat fees for re-plats and final plat amendment (includes
engineering fee)
| ||
1 to 50 lots
|
$300.00 base;
$14.50 lot fees;
$314.50 minimum;
$1,025.00 maximum
| |
51 to 150 lots
|
$300.00 base;
$15.50 lot fees;
$1,090.50 minimum;
$2,625.00 maximum
| |
151 to 500 lots
|
$300.00 base;
$16.00 lot fees;
$2,716.00 minimum;
$8,300.00 maximum
| |
Over 500 lots
|
$300.00 base;
$16.00 lot fees;
$8,300.00 minimum;
TBD — maximum
| |
Rezoning (zoning amendments)
| ||
0 to 5 acres
|
$250.00*
| |
5 to 10 acres
|
$500.00*
| |
10 to 15 acres
|
$750.00*
| |
15 to 20 acres
|
$1,000.00*
| |
Over 20 acres
|
$1,500.00*
| |
* Should extraordinary circumstances be involved which require
special (or) additional outside consulting services, the fees shown
will be adjusted to include such additional cost to the City. The
applicant will be advised of these requirements before the City accepts
the application.
| ||
Site plan review fee (includes engineer fee)
| ||
0 to 1 acres
|
$1,250.00
| |
1 to 5 acres
|
$2,000.00
| |
Over 5 acres
|
1% of land improvement construction cost (excluding buildings)
| |
Vacation (ROW/easement) fee
|
$250.00
| |
Variance fee
|
$300.00
| |
Administrative fee plus an appropriate construction permit fee
|
$50.00;
Based on $5.00/$1,000.00 construction cost or;
$50.00 per inspection trip, whichever is greater
| |
Public improvement construction inspection fee
|
5% of estimated public improvement construction cost
| |
Blasting Permit[29]
| ||
Permit for blasting and the use and possession of explosives
|
$10.00
| |
Bond to accompany a permit for blasting and the use and possession
of explosives
|
$1,000.00 to $50,000.00 to be set by the City Engineer
| |
Building Move Permit[30]
| ||
Permit for used building moved into or within the City limits
— performance bond
|
20% of the cost of remodeling
| |
Alcoholic Beverages[31]
| ||
Bond amount requirement — required of each applicant for
a license
|
$10,000.00
| |
Manufacturers of malt liquor
|
$250.00
| |
Manufacturers or distillers of intoxicating liquors containing
alcohol in excess of 5% by weight
|
$300.00
| |
Distributors or wholesalers of malt liquor
|
$75.00
| |
Retailers selling malt liquor, in the original package direct
to the consumer, and not for consumption on the licensed premises
where sold
|
$22.50
| |
Retailers selling intoxicating liquor containing alcohol in
excess of 5% by weight, in the original package, not to be opened
or consumed on the licensed premises where sold
|
$150.00
| |
Retailers selling malt liquor and/or light wines in the original
package or for consumption on the licensed premises
|
$52.50
| |
Retailers selling intoxicating liquor with an alcoholic content
of more than 5% by weight, for consumption on the premises where sold
|
$450.00
| |
Sunday license fees
|
$300.00
| |
Special permit for festivals
|
$37.50
| |
Lost or destroyed license — replacement fee
|
$5.00
| |
Violation of Chapter 600, Alcoholic Beverages
|
$25.00 to $500.00
| |
Business Licenses[32]
| ||
Type A and C businesses
[Ord. No. 21-20, 11-2-2021] |
$75.00 flat fee;
$5.00 per employee;
$100.00 minimum license fee
| |
Type B business
|
$0.075 per ton of rock, gravel or other aggregate sold, up to
1.5 million tons annually;
$0.04 for each ton of rock, gravel or other aggregate sold on
all sales over 1.5 million tons annually;
$50.00 base license fee
| |
Peddlers and Solicitors[33]
| ||
License for a peddler acting on behalf of a merchant otherwise
licensed to do business in the City
|
No fee
| |
License for a peddler acting on behalf of a merchant not otherwise
licensed to do business within the City
|
$10.00 per day
| |
License for a solicitor, including a commercial solicitor advertising
an event, activity, good or service, for a purchase at a location
away from the residence
|
No fee
| |
License for a canvasser requesting a permit
|
No fee
| |
Sewer and Sewage Disposal[34]
| ||
Individually metered units designed and intended for residential
occupancy
[Ord. No. 23-19, 12-5-2023] |
$91.56 per month base charge (2024); $100.00 per month base
charge (2025)
$7.00 per 1,000 gallons (2024), $7.50 per 1,000 gallons (2025
and beyond);
to monthly maximum of 6,000 gallons
| |
Commercial and industrial users, all person, companies, and
corporations other than the occupants of individually metered residential
units
[Ord. No. 23-19, 12-5-2023] |
$91.56 per month base charge (2024); $100.00 per month base
charge (2025)
$7.00 per 1,000 gallons (2024), $7.50 per 1,000 gallons (2025
and beyond);
to monthly maximum of 6,000 gallons
| |
Sewer customers whose water usage is less than 500 gallons any
given month
|
$11.25 monthly hydration charge
| |
Infiltration and inflow (I&I) charge — for each sewer
user determined by the Director of Public Works to have a sewer service
line which is in a condition that permits rainwater, surface water
or groundwater to enter the sewer service system
|
$50.00 per month
| |
Processing fee for water disconnects for past due sewer billings
|
$25.00
| |
Advance deposit, business
|
Estimated 2-month bill for that business, in that location,
over the next 12-month period
| |
Advance deposit, residential
|
Estimated 2-month bill for that residence in that location,
over the next 12-month period
| |
Private sewer permit, residential
|
$50.00
| |
Private sewer permit, commercial
|
$100.00
| |
Failure to allow the Director of Public Works onto property for inspection, observation, measurement, sampling and testing as permitted by Section 700.390
|
$100.00 per day of denied inspection
| |
Violation of Chapter 700 beyond time limit in notice
|
Not to exceed $100.00
| |
Application to extend sewer lines
|
$150.00
| |
Connection to City sewerage system — land not in the sewer
benefit district as of July 18, 1995
|
$0.20 per square foot of land in the development project
| |
Connection to City sewerage system
|
$5,000.00 per residential connection;
$700.00 per commercial or industrial building
| |
Utility Company Taxation[35]
| ||
Telephone company tax
|
5% of local service revenues, quarterly
| |
Gas company tax
|
5% of gross sales receipts, February 1 and August 1, annually
| |
Electric company tax
|
5% of the gross receipts, monthly
| |
Working Without a Permit or in Violation of a Stop Order[36]
| ||
1st offense
|
$500.00 fine
| |
2nd offense
|
$1,000.00 fine
| |
3rd and subsequent offenses
|
$3,000.00 fine
|