[Ord. No. ZO17-1, eff. 5-15-2016]
(a) The purpose of planned unit development ("PUD") regulations is to
encourage and allow more creative and innovative design of land development
and use than is possible under conventional zoning district regulations.
Planned unit developments are intended to allow flexibility in planning
and in designing development proposals, which ideally results in a
development that contains more amenities through preservation of natural
and cultural resources, and through providing a combination of complementary
uses. The result is ultimately a development that is more desirable
than one produced in accordance with conventional zoning ordinance
and subdivision controls.
(b) Through proper design and review, each PUD should substantially meet
the following objectives:
(1)
To allow a mix of uses, structures, facilities, housing types
and open space that is compatible with existing and planned uses on
nearby properties.
(2)
To encourage land development that, to the greatest extent possible,
preserves natural vegetation, respects natural topographic conditions,
and preserves natural resources such as wetlands, forests, floodplains,
natural drainage patterns, agricultural lands, wildlife habitats and
other natural site features.
(3)
To provide for the regulation of lawful and reasonable land
uses not otherwise authorized within this chapter.
(4)
To provide for single- or mixed-use developments which respect
the goals and objectives of this chapter and the Park Township Master
Plan.
(5)
To encourage the provision of open space and the development
of recreational and other support facilities in generally central
locations or within a reasonable distance of all dwellings or uses.
(6)
To implement the vision of the Park Township Master Plan in
order to provide a high standard of quality of life, varied housing
options, and richness of natural assets.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) The Township Board may approve a PUD in any location within Park Township, provided the property meets the qualifying conditions set forth in Section
38-365.
(b) Any land use allowed by this chapter may be approved by the Township
Board within a PUD as a principal or accessory use subject to adequate
provisions for the public health, safety, and welfare within the PUD,
except manufactured housing communities may only be approved within
a PUD in areas recommended in the Park Township Master Plan for high-density
residential and zoned R-4 Medium Density Single- and Two-Family Residence
District prior to consideration as a PUD.
(c) Private roads are allowed in a PUD subject to the requirements of Section
38-512 herein.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) Minimum PUD area size. In order to be eligible for a PUD, the area
proposed for a PUD shall consist of a minimum of two contiguous acres;
with the exception that, in the C-1 Neighborhood Business District
and the C-2 Resort Service District, the minimum size shall be one
contiguous acre.
(b) Completion of PUD as approved. Upon the transfer of ownership or
control of the entire PUD or individual properties within the PUD,
all requirements approved by the Township Board shall continue to
be met and the development shall be completed in its entirety as approved.
[Ord. No. ZO17-1, eff. 5-15-2016]
The lot area, lot width, building height, setback, and other
dimensional and yard requirements, supplemental regulations, landscaping,
signs, lighting and parking regulations and other development regulations
which would otherwise be applicable to the type of land use being
requested for the PUD shall be determined by the Township Board following
a recommendation from the Planning Commission in order to achieve
the objectives of this division. Criteria which shall be used in making
these determinations shall include the following:
(1) Number, location, size, and type of dwelling units.
(2) Type, location, and amount of nonresidential uses proposed.
(3) Proximity and impact of the PUD on adjacent existing and future land
uses.
(4) Preservation of existing vegetation or other natural features on
site.
(6) Provision of public and/or community water, sanitary sewer and storm
sewer or approval of the Ottawa County Health Department for on-site
well and septic systems.
(7) Access for emergency vehicles to all buildings and areas.
(8) Provisions for pedestrian circulation, recreational amenities, and
open space.
(9) Traffic circulation and safety.
[Ord. No. ZO17-1, eff. 5-15-2016; amended by Ord. No. 2020-001, eff. 1-27-2020]
For planned unit developments which will devote all or a portion of the site to residential use, the following requirements shall apply, in addition to the requirements of Section
38-366:
(1) Number of dwellings permitted. An area which is requested for approval to a PUD shall be developed in accordance with the density determined by using the minimum lot size required by the current zoning district for the area for residential uses according to the requirements of Section
38-367(2).
(2) Formula to determine number of dwellings on net buildable acreage.
The number of dwellings which may be constructed within a PUD shall
be determined as follows:
a. Determine gross site acreage. The gross site acreage may include
the public road rights-of-way to which the site abuts only if the
legal description for the land includes the road rights-of-way.
b. Subtract all the areas of existing wetlands, creeks, streams, ponds,
lakes, or other water bodies, floodplains, critical dunes, and slopes
of 20% or greater.
c. If requested by the Planning Commission or the Township Board, the
determination of the existence of wetlands or floodplain areas on
a parcel shall be demonstrated through a written determination by
the Michigan Department of Natural Resources, or by a professional
biologist, ecologist, environmental engineer or similar professional
person deemed acceptable to the Planning Commission or the Township
Board and in compliance with the standards for wetlands or floodplains
established by the Michigan Department of Natural Resources at the
time of the review.
d. Subtract acreage proposed to be devoted to nonresidential uses, except
those areas proposed for, but not limited to, parks, playgrounds,
and dedicated open space, which shall not be subtracted.
1.
Facilities proposed for, but not limited to, community buildings,
indoor recreational facilities, and similar facilities shall be considered
nonresidential uses and shall be subtracted to determine net buildable
acreage.
2.
Streets, alleys, drives, or similar improvements internal to
the site designed for the circulation of traffic, with or without
a right-of-way, shall be subtracted to determine net buildable acreage.
The area for these improvements shall be calculated using a width
of no less than 66 feet by their total length. Driveways generally
perpendicular to the street, alley, drive, or similar improvement
shall not be included within this calculation.
e. The number of acres remaining shall be the net buildable acreage.
f. Multiply the net buildable acreage by the number of dwelling units
per acre that results using the minimum residential lot size required
by the current zoning district.
(3) Additional dwellings. Additional dwellings above those authorized by Section
38-367(1) and
(2) may be allowed at the discretion of the Township Board following a recommendation by the Planning Commission if the development provides additional amenities or preserves additional dedicated open space, beyond that required by Section
38-368, which would result in a significant recognizable benefit to the Township and residents of the PUD. In considering whether the PUD will result in a significant recognizable benefit to the Township and the residents of the PUD, the Planning Commission and Board shall consider whether the PUD includes one or more of the following items as well as similar items:
a. Recreational facilities such as playground areas with play equipment,
ball fields, bike paths, constructed lake, community building or similar
recreation facilities, with the exception of golf courses.
b. Additional landscaping to preserve or enhance the views along the
roadway.
c. Enhancement of existing wetlands, or creation of lakes or ponds which
are not designed solely to function as retention or detention facilities,
but are designed primarily as recreational or visual amenities, subject
to applicable regulations.
d. Provision of additional unique dedicated open space or mature stands
of trees which would be of recognizable benefit to Township residents
and residents of the PUD.
e. Provision of a public or private community water and/or sanitary
sewer system.
f. If additional dwelling units are to be allowed, the maximum number of dwelling units shall be determined according to the formula in Section
38-367(2)a and f by utilizing the gross site acreage. In no case shall the number of dwelling units exceed that allowed by this subsection.
(4) Mixed-use developments.
a. Where a mix of commercial, residential, or other combinations of
land uses are proposed for one PUD, the density of the residential
portion of the PUD site shall be calculated based upon the net buildable
acreage of only that portion of the site where residential uses are
permitted by the underlying zoning district.
b. The formula to determine additional dwellings for a mixed-use PUD
shall be based upon the gross site acreage of only that portion of
the PUD site where residential uses are permitted by the underlying
zoning district.
[Ord. No. ZO17-1, eff. 5-15-2016; amended by Ord. No. 2020-001, eff. 1-27-2020]
(a) A PUD with residential uses shall provide and maintain the following minimum amount of dedicated open space in accordance with the standards of this article. The Planning Commission shall have the discretion to recommend to the Township Board more than the minimum amount of dedicated open space required by the following, if such recommendation is made pursuant to the Planning Commission finding that the purpose and the objectives of the PUD District as required by Section
38-363 are met.
(1)
For land zoned AG, a minimum of 40% of the gross site area devoted
to residential use shall be permanently preserved as dedicated open
space.
(2)
For land zoned R-1, R-2 or R-3, a minimum of 20% of the gross
site area devoted to residential use shall be permanently preserved
as dedicated open space.
(3)
For land zoned R-4 or R-5 and not served with public or private
sewer, a minimum of 20% of the gross site area devoted to residential
use shall permanently be preserved as dedicated open space. For land
zoned R-4 or R-5 and served with public or private sewer, and for
those uses proposed for multifamily development, a minimum of 15%
of the gross site area devoted to residential use shall be permanently
preserved as dedicated open space.
(4)
For land zoned R-4 or R-5 and proposed for manufactured housing community, the regulations of Article
IX of this chapter regarding minimum dedicated open space shall apply.
(b) Areas not considered dedicated open space. The following land areas
shall not be considered, allowed, or approved as dedicated open space
for the purposes of this section:
(1)
The area within any public or private road easement or right-of-way or within streets, alleys, drives, or similar improvements pursuant to Section
38-367(2)d.2 of this chapter.
(2)
Any easement for overhead utility lines, unless adjacent to
qualified dedicated open space.
(3)
Only 50% of the area of any existing floodplain, streams, wetlands,
lakes, ponds, and slopes which are 20% or greater shall be counted
as dedicated open space.
(4)
The area within a platted lot or site condominium lot.
(5)
The area of required setbacks or required distances between
buildings.
(6)
Proposed detention and retention ponds. Stormwater management facilities such as rain gardens, bioswales, vegetated filter strips, constructed wetlands, and similar facilities may be considered, allowed, or approved as dedicated open space upon recommendation of the Planning Commission and approval by the Township Board based upon a review of the purpose and objectives in Section
38-373 and the standards in Section
38-373(i).
(7)
Community drain fields if such areas are not completely underground.
(8)
Any area devoted to a golf course.
(9)
Landscaping buffers and greenbelts as required by ordinance.
[Ord. No. ZO17-1, eff. 5-15-2016]
The following standards shall apply to the dedicated open space
provided in a PUD:
(1) Dedicated open space shall be located so as to preserve significant
natural resources, natural features, scenic or wooded conditions,
bodies of water, wetlands, or significant cultural features, such
as existing landmark structures or vegetation.
(2) A portion of the dedicated open space may be required to be located
along the public road frontage abutting the site. This area shall
be left in its natural condition or landscaped to provide a view compatible
with the existing or desired character of the area. When required,
the depth of this area shall be recommended by the Planning Commission
and as approved by the Township Board, but in no case shall it be
less than 30 feet, and it shall not include the road right-of-way.
(3) If the site contains a lake, stream, or other body of water, the
Township Board, following a recommendation from the Planning Commission,
may require a portion of the dedicated open space to abut the body
of water.
(4) Dedicated open space areas shall be linked with adjacent open spaces,
public parks, bicycle paths or pedestrian paths where practicable.
(5) Grading in the dedicated open space shall be minimal, with the intent
to preserve existing topography where practicable.
(6) Dedicated open space may consist of ballfields, tennis courts, children's
play area, skate parks, swimming pools and related buildings, community
buildings, and similar recreational facilities. No more than 50% of
the dedicated open space may be devoted to these uses.
(7) The dedicated open space shall be available and usable for all residents
of the PUD, subject to reasonable rules. Safe and convenient pedestrian
access to the dedicated open space shall be provided.
(8) The dedicated open space shall be designed to be used primarily by residents of the PUD, but this shall not prohibit non-PUD residents from utilizing these accessory uses, provided rules for such use are set forth in the open space agreement required by Section
38-371 herein.
(9) Noncontiguous dedicated open space. If requested by the applicant,
the Planning Commission may recommend and the Township Board may approve
dedicated open space that is not contiguous with the rest of the PUD.
In determining whether to approve noncontiguous dedicated open space,
one or more of the following criteria shall apply:
a. The noncontiguous dedicated open space is located such that residents
of the PUD can reasonably access and use the noncontiguous dedicated
open space.
b. The noncontiguous dedicated open space will be open to use by the
residents of the PUD and the general public.
c. The dedicated open space contains unique features not found on the
lands contiguous to the PUD, and the noncontiguous dedicated open
space will be open to use or observation by the residents of the PUD
and the general public.
[Ord. No. ZO17-1, eff. 5-15-2016]
The intent of this section is to ensure that each PUD that proposes
nonresidential uses (such as commercial or institutional uses) shall
provide permanent dedicated open space for the nonresidential portion
of the PUD site in the form of civic space, such as a central green
for sitting or viewing of small outdoor events, or provide objects
or areas of interest such as a fountain or plaza, or provide rain
gardens or other bioretention areas for the purpose of stormwater
detention which shall also function as a visual amenity.
(1) Dedicated open space areas shall be arranged and designed to contribute
to the attractiveness and function of the PUD and shall, insofar as
reasonably possible, be interspersed throughout the site.
(2) At least one dedicated open space area shall be a central green,
plaza, or civic square which functions as a focal point for the nonresidential
portions of the PUD and serves as an area where social, civic, or
passive activities can take place. This area shall be of sufficient
size and design to serve as a visual and functional civic amenity
for sitting, viewing, dining, or other similar outdoor activity and
which, in the opinion of the Township Board, satisfies the intent
of this section.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) The applicant shall provide an open space preservation and maintenance
agreement to the Township guaranteeing that all dedicated open space
portions of the PUD shall always be maintained in the manner approved.
The agreement shall permanently bind all successors and future owners
in title. This provision shall not prohibit a transfer of ownership
or control of all or any part of the PUD, provided notice of such
transfer is provided to the Township and the land uses continue as
approved in the PUD plan, unless an express amendment is approved
by the Township Board.
(b) The agreement will be subject to the review and approval of the Township
Board and may consist of a recorded deed restriction, covenants that
run perpetually with the land, or a conservation easement established
according to the Michigan Conservation and Historic Preservation Act,
Public Act 197 of 1980, as amended.
(c) The agreement shall:
(1)
Indicate the permitted use(s) of the dedicated open space.
(2)
Require that the dedicated open space be maintained by parties
who have an ownership interest in the dedicated open space.
(3)
Provide for scheduled maintenance of the dedicated open space,
including necessary pruning, mowing, replacement of dead or diseased
vegetation, and harvesting of trees and new plantings.
(4)
Provide for scheduled maintenance of any structures or facilities
located within the dedicated open space, including trails.
(5)
Provide that maintenance may be undertaken by Park Township
in the event that the dedicated open space is inadequately maintained
or is determined by the Township to be a public nuisance. The agreement
shall also provide that any costs incurred by the Township in providing
such maintenance, including, but not limited to, all costs of labor
(wages and benefits), materials, equipment, and administrative costs,
shall be proportionately assessed to the owners of the properties
within the PUD and that any unpaid assessment will become a lien against
the property.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) Public or private streets may be required to be extended to an adjacent
property line by the Township Board following a recommendation from
the Planning Commission. In making such a decision and recommendation,
the Township Board and Planning Commission shall consider the following
standards:
(1)
The road extension is a logical method to achieve the safe and
efficient movement of vehicles and pedestrians between residential
areas and to reduce the amount of vehicle trips which would otherwise
need to utilize the street system to access adjoining residential
areas. In making this determination, the Township Board and Planning
Commission shall consider the likelihood of the adjacent property
being developed, whether the natural site features on the adjacent
property preclude or present difficulty in extending the public or
private road, and if the adjacent site is already developed so as
to prevent the extension of the public or private road.
(2)
The road extension would not result in future traffic from off
site creating unsafe situations for the residents of the project proposed
by the applicant.
(b) If such a connection is required, the applicant shall construct the
road to the adjacent property line at the time that the public or
private road is built or the applicant shall grant an appropriate
easement to the adjoining property for the road connection and illustrate
that easement for the future road on the approved PUD site plan, and
shall record an agreement (subject to the approval by the Township)
to construct the road connection within the easement when the adjacent
property develops and the Planning Commission determines the necessity
of the road connection. The Township Board may require the applicant
to provide a bond, letter of credit, or other financial guarantee
at the time of the PUD approval to ensure that the road is extended
as required.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) Preapplication conference and presentation.
(1)
Before submitting an application for PUD approval, the applicant
shall meet with the Zoning Administrator, who may request the attendance
of the Township Planner, Township Engineer, or other professional
or Township official.
(2)
The applicant shall provide a conceptual drawing or other information
about the development of the property.
(3)
The purpose of the preapplication meeting is to explain the
PUD review process to the applicant along with site design requirements
in order to assist the applicant in preparing a PUD site plan for
review by the Planning Commission.
(4)
No formal action may be taken at a preapplication conference,
nor will any statements made at the preapplication conference be legally
binding commitments.
(5)
The applicant shall, upon request by the Zoning Administrator
or other Township official, make a preapplication presentation to
the Planning Commission. This presentation shall include a conceptual
drawing and other information sufficient to inform the Planning Commission
of the proposal and to provide the applicant with preliminary comments
from the Planning Commission. No formal action may be taken at a preapplication
presentation, nor will any statements made at the preapplication presentation
be legally binding commitments.
(b) Submit PUD application materials. Following the preapplication conference,
the applicant shall submit an application for PUD approval that shall
include a completed application form and 10 sets of the preliminary
PUD development plan, including an electronic file of the development
plan. The application materials shall be submitted to the Zoning Administrator
in accordance with the submittal schedule established by the Planning
Commission, along with the fee or fees as set by resolution of the
Township Board. The application shall at a minimum contain all of
the following information:
(1)
The applicant's name, address, and phone number.
(2)
Proof that the applicant is the owner of the property or has
a sufficient legal or financial interest in the property.
(3)
The name, address and phone number of the owner(s) of record
if different than the applicant.
(4)
The address of the property.
(5)
Legal description of the property.
(6)
Current zoning of the property.
(8)
Size of the property in acres, and any information deemed necessary
by the Planning Commission to determine gross site acreage and net
buildable acreage.
(9)
Signature of the applicant and owner of the property.
(10)
A narrative describing:
a.
The objectives of the PUD and how it relates to the intent of the PUD District as described in Section
38-363.
b.
The relationship of the PUD to the Park Township Master Plan.
c.
Phases of development and approximate time frame for each phase.
d.
Proposed deed restrictions, covenants, or similar legal instruments
to be used within the PUD.
e.
Anticipated start and completion of construction.
f.
Location, type, and size of areas to be dedicated open space.
g.
All proposed modifications from the zoning regulations which
would otherwise be applicable to the uses and structures of the current
zoning of the property in the absence of a PUD.
(c) Preliminary PUD development plan. The preliminary PUD development plan shall be drawn at a scale of not more than one inch equals 100 feet and shall contain all of the information as required by Section
38-102 of this chapter and the following information, unless specifically waived by the Planning Commission:
(1)
Small scale sketch of properties with parcel lines, streets,
zoning, and uses of land within 1/2 mile of the site. This sketch
shall be sufficient to illustrate the character of the area surrounding
the proposed PUD.
(2)
Significant natural features and other natural characteristics
on the site and within 100 feet of the site, including, but not limited
to, open space, stands of trees, bodies of water, brooks, streams,
wetlands, floodplains, slopes of 20% or greater, and similar natural
features.
(3)
Significant cultural amenities, such as historic sites or structures,
fence rows of trees, specimen trees, or other culturally significant
features.
(4)
Proposed lots, with lot line dimensions and the area of all
lots or site condominium units, and all proposed setbacks. Notes on
the PUD development plan shall state all proposed modifications from
the zoning regulations which would otherwise be applicable to the
uses and structures of the current zoning of the property in the absence
of a PUD.
(5)
All driveways opposite the site.
(d) Environmental impact assessment. The Planning Commission may require
an environmental impact assessment as part of the preliminary or final
PUD development plan.
(e) Review of preliminary PUD development plan. The Planning Commission
shall review the preliminary development plan and make recommendations
to the applicant regarding the PUD, together with any recommended
changes or modifications thereof.
(f) Final PUD development plan.
(1)
After receiving the recommendations of the Planning Commission
on the preliminary PUD development plan, the applicant for a PUD shall
submit a final PUD development plan to the Township in accordance
with the requirements for submittal of the preliminary PUD development
plan, along with the fee or fees as set by resolution of the Township
Board.
(2)
The final PUD development plan shall contain all of the information
required for preliminary PUD plan review (unless specifically waived
by the Planning Commission as not being reasonably necessary for the
consideration of the PUD), plus the following:
a.
All of the drawings, narrative, studies, assessments, and other
information and materials comprising the preliminary PUD development
plan, including all of the recommendations of the Planning Commission
thereon; or if the applicant has not incorporated all of such recommendations,
the final PUD development plan shall indicate such fact and shall
state the basis or grounds upon which such recommendations have not
been included.
b.
Projected time for completion of the entire PUD, proposed phasing,
if any, of the PUD, and the projected time for completion of each
phase.
c.
Any other information reasonably required by the Planning Commission
or Township Board in connection with the review of the PUD and consideration
of the approval of development of the lands in accordance with the
PUD plan.
(g) Planning Commission review of final PUD development plan. The Planning
Commission shall prepare a report containing its recommendation to
the Township Board concerning the PUD request. The report shall state
the conclusions of the Planning Commission concerning the PUD request,
the basis for the Planning Commission's recommendation, and any conditions
recommended for approval of the PUD.
(h) Planning Commission public hearing on final PUD development plan.
Prior to making a recommendation to the Township Board, the Planning
Commission shall hold an advisory public hearing on the final PUD
development plan. The giving of public notice for the public hearing
shall be as required by the Michigan Zoning Enabling Act, PA 110 of
2006, as amended.
(i) Standards for approval. The recommendation of the Planning Commission
and the decision of the Township Board to approve a PUD shall be based
on a finding that the application meets all of the following standards:
(1)
The PUD will result in a recognizable and substantial benefit
to ultimate users of the project and to the community, and the benefit
would otherwise be unfeasible or unlikely to be achieved.
(2)
The PUD will not result in a significant increase in the need
for public services and facilities and will not place a significant
burden upon surrounding lands or the natural environment, unless the
resulting adverse effects are adequately provided for or mitigated
by features of the PUD as approved.
(3)
The PUD will be generally compatible with the Master Plan and consistent with the intent and objectives of this Chapter
38, Article
III, Division 8, and this chapter.
(4)
The PUD will not result in significant adverse effects upon
nearby or adjacent lands and will be generally compatible with the
character of the surrounding area.
(5)
The PUD will protect all floodplains and wetlands from filling,
except as approved for essential services or recreation amenities.
(6)
The PUD will preserve and maintain mature woodlands, fields,
pastures, and meadows and create sufficient buffer areas to minimize
conflicts between residential and agricultural uses.
(7)
The PUD will leave scenic views and vistas unblocked or uninterrupted,
particularly as seen from public road rights-of-way, insofar as practicable.
(8)
The PUD will protect the rural roadside character where desirable.
(9)
Pedestrian walkways may be provided so that pedestrians can
walk safely and easily throughout the site.
(10)
The individual lots, buildings, roadways, and open space areas
are designed to minimize the alteration of natural and environmental
site features.
(11)
The PUD will be adequately served by public utilities and services
such as police and fire protection or public or on-site community
water or sanitary sewer.
(12)
The PUD shall be in compliance with all applicable federal,
state, county, and Township laws, ordinances, and regulations.
(13)
If a PUD is to be completed in phases, the PUD shall be designed
so that each phase is complete in and of itself, in terms of services,
facilities and open spaces, and so that each phase contains all of
the features necessary to ensure the protection of natural resources
and the health, safety and welfare of the users of the PUD and the
occupants of the surrounding area. The Planning Commission may recommend
and the Township Board may require that neighborhood amenities such
as recreational facilities, walkways, and similar facilities be completed
upon occupancy of a determined number or percentage of dwelling units
or nonresidential uses.
(j) Public hearing and final consideration of the PUD by Township Board.
(1)
The Township Board shall review the final PUD development plan
and the recommendations submitted by the Planning Commission. The
Township Board shall conduct a public hearing and provide notice as
required by the Michigan Zoning Enabling Act, PA 110 of 2006, as amended.
(2)
Following the public hearing, the Township Board shall determine
whether the final PUD development plan complies with the standards
of Section 38-673(i) and with the conditions recommended by the Planning
Commission; whether the PUD promotes the intent and purpose of this
chapter; and whether the PUD will be consistent with the public health,
safety, and welfare needs of the Township.
(3)
Upon a determination that a proposed project meets all such
standards, conditions, and requirements, the Township Board shall
approve the final PUD development plan and may impose reasonable conditions
on approval as provided in Subsection (k) below.
(k) Conditions of approval.
(1)
The Township Board may impose reasonable conditions upon any
PUD approval. Such conditions may include those reasonably necessary
to ensure that public services and facilities affected by a PUD will
be capable of accommodating increased service and facility loads caused
by the land use or activity, to protect the natural environment and
conserve natural resources and energy, to ensure compatibility with
adjacent uses of land, and to promote the use of land in a socially
and economically desirable manner. Conditions imposed shall meet all
of the following requirements:
a.
They shall be designed to protect natural resources; the health,
safety, and welfare and the social and economic well-being of those
who will use the PUD; residents, and landowners immediately adjacent
to the PUD; and the community as a whole.
b.
They shall be related to the valid exercise of the police power
and the purposes which are affected by the PUD.
c.
They shall be reasonably necessary to meet the intent and purpose of this chapter, be related to the standards established in this Chapter
38, Article
III, Division 8, for the proposed PUD under consideration, and be necessary to ensure compliance with those standards.
(2)
The conditions imposed with respect to the approval of a PUD
shall be recorded in the record of the approval action and shall remain
unchanged except upon the mutual written consent of the Township Board
and the property owner. The Township Board shall maintain a record
of all conditions which are imposed.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) Applications for planned unit developments proposed as land divisions or subdivisions shall be subject to the Park Township regulations for land divisions and subdivisions of Chapter
18, Land Divisions and Subdivisions.
(b) Applications for planned unit developments proposed as condominiums
shall be subject to the requirements of the State of Michigan Condominium
Act, Act 59 of 1978, as amended.
[Ord. No. ZO17-1, eff. 5-15-2016]
An approved final PUD development plan (and any conditions imposed
upon final PUD approval) shall not be changed except upon the mutual
written consent of the Township Board and the applicant as required
by this section.
(1) Minor amendments. A minor change may be approved by the Zoning Administrator,
who shall notify the Planning Commission of the minor change and shall
indicate that such change does not substantially change the basic
design or alter the conditions required for the PUD. The following
items shall be considered as minor changes:
a. Reduction of the size of any building and/or sign.
b. Movement of buildings and/or signs by no more than 10 feet.
c. Plantings approved in the landscape site plan may be replaced by
similar types of landscaping.
d. Changes in floor plans which do not alter the character of the use.
e. Internal rearrangement of a parking lot which does not affect the
number of parking spaces or alter access locations or design.
f. Changes required or requested by the Township for safety reasons.
g. Changes which will preserve the natural features of the site without
changing the basic site layout.
h. Other similar changes of a minor nature proposed to be made to the
configuration, design, layout or topography of the site plan which
are deemed by the Zoning Administrator to be not material or significant
in relation to the entire site and which the Zoning Administrator
determines would not have any significant adverse effect on adjacent
or nearby lands or the public health, safety and welfare.
(2) The Zoning Administrator may refer any decision regarding any proposed
change to an approved PUD to the Planning Commission for review and
approval regardless of whether the change may qualify as a minor change.
In making a determination whether a proposed change is a minor change,
or whether to refer a proposed change to the Planning Commission for
approval, the Zoning Administrator may consult with the Chairperson
of the Planning Commission.
(3) If the Zoning Administrator determines that the requested modification
to the approved PUD is not minor, resubmission to the Planning Commission
for a formal amendment shall be required and shall be conducted in
the same manner as an original application. Adding additional land
to an approved PUD may not be deemed a minor change but will always
require an amendment to the approved PUD.
[Ord. No. ZO17-1, eff. 5-15-2016]
The applicant may be required to provide a bond, letter of credit,
escrow deposit, or other reasonable performance guarantees or assurances
deemed satisfactory to the Township Board in the circumstances and
as authorized by law. The amount and form of the performance guarantee
shall be determined by the Township Board and may be based upon a
recommendation from the Planning Commission.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) Each PUD shall be under substantial construction within one year
after the date of approval of the final PUD development plan and adoption
by the Township Board of a PUD resolution that includes a report stating
all conditions of approval of the PUD. If the requirement for substantial
construction within one year is not met, following a review and recommendation
of the Planning Commission, the Township Board may, in its discretion,
grant an extension not exceeding one year, provided that the applicant
submits reasonable evidence to the Township showing that unforeseen
difficulties or special circumstances have been encountered, causing
delay in commencement of the PUD.
(b) If the PUD has not been commenced within the above-stated period
of time, or within any authorized extension thereof, any building
permits issued for the PUD (or any part thereof) shall be of no further
effect, and all approvals of the PUD shall be void.
(c) If the PUD has been approved with more than one phase, and substantial
construction on any phase has not commenced within one year from the
period of completion of the preceding phase, or within any authorized
extension thereof, following a review and recommendation of the Planning
Commission, the Township Board may, in its discretion, grant an extension
not exceeding one year, provided that the applicant submits reasonable
evidence to the Township showing that unforeseen difficulties or special
circumstances have been encountered, causing delay in commencement
of the phases of the PUD. If approval of any extensions for construction
of phases of the PUD are denied, any building permits issued for the
PUD (or any part thereof) shall be of no further effect, and all approvals
of the PUD shall be void.
[Ord. No. ZO17-1, eff. 5-15-2016]
The Zoning Board of Appeals shall not have jurisdiction to accept appeals or to grant variances with respect to an approved PUD. Variances within a PUD that is within a subdivision shall be subject to the requirements of Chapter
18, Article
II, Division 5, Section
18-151, of the Code of Ordinances.
[Ord. No. ZO17-1, eff. 5-15-2016]
(a) Planned unit developments that were given either preliminary or final
PUD development plan approval prior to May 22, 2017, shall be considered
to be conforming uses and shall continue to be regulated by the approved
preliminary or final PUD development plan and any conditions imposed
for that particular PUD.
(b) A minor change to a planned unit development that was given either preliminary or final PUD development plan approval prior to May 22, 2017, may be approved by the Zoning Administrator according to the requirements of Section
38-375. Any change that is not a minor change shall be resubmitted to the Township in the same manner as the original application and shall be subject to the requirements of Division 8 of Article
III as of the effective date of May 22, 2017.