After completing the requirements of Article
IV of this chapter, the subdivision process shall commence by a subdivider filing an application for preliminary acceptance on a form provided by the Town. Said application shall be filed with the Director of Engineering and Zoning in accordance with the standards and other provisions of this chapter. A preliminary plat shall be filed within 90 days of the sketch plan review meeting per §
400-17. Failure to submit a preliminary plat within 90 days of the sketch plan review meeting will require the applicant to recomplete the requirements of Article
IV of this chapter, including the fee payment requirement. The preliminary plat shall be considered officially filed when it has been examined by the Director of Engineering and Zoning, has been found to be in general compliance with the formal provisions of this chapter and an application acceptance letter has been issued to the subdivider from the Director of Engineering and Zoning.
The preliminary plat shall show, on a map, all of the facts
needed to enable the Town Council to determine whether the proposed
layout of the land in a subdivision is satisfactory from the standpoint
of public interest. These facts shall include, but not be limited
to, the proposed location and line sizes of sewer and waterlines,
paving widths, street and area drainage, and soil characteristics.
The preliminary plat shall be prepared by a Wyoming licensed
engineer or surveyor. The preliminary plat shall be clearly and legibly
drawn. The size of the map shall be 24 inches by 36 inches. The preliminary
plat shall be submitted to the Town in both a digital format, and
as 10 hard copies.
The preliminary plat shall contain the following information:
A. Description:
(1) Proposed name of the subdivision. The name shall not duplicate, be
the same in spelling or alike in pronunciation with any other recorded
subdivision.
(2) Names of adjacent subdivisions and owners of adjoining parcels of
unsubdivided land;
(3) Names and addresses of the subdivider, owner and engineer;
(4) Location by section, township, range, town, county, state; and
(5) Names of streets within both the preliminary plat and all adjoining
plats.
B. Existing conditions:
(1) Boundaries of the subdivision indicated by a heavy line and the approximate
acreage;
(2) Locations of utilities including sewer lines, waterlines, manholes,
fire hydrants, power lines, gas lines and communication lines, and
with line sizes included for sewer and waterlines;
(3) Location, widths and names of existing or platted streets, rights-of-way,
easements, parks, permanent buildings, section and corporate lines;
(4) Zoning districts, if any; and
(5) Soil characteristics and grades of slopes.
C. Proposed conditions:
(1) Proposed locations of utilities, including sewer lines, waterlines,
manholes, fire hydrants, power lines, gas lines and communication
lines, and with line sizes included for sewer and waterlines;
(2) Proposed paving width and street drainage;
(3) Proposed zoning district(s);
(4) Location and principal dimensions of all proposed streets, alleys,
rights-of-way, easements, parks, sections, corporate lines, lot lines,
wetland delineations, FEMA flood zone and any other areas to be reserved
for public or private use; and
(5) Provisions for stormwater disposal, drainage and flood control.
D. Survey data:
(1) Existing contours with intervals of not more than 10 feet where the
slope is greater than 5% and not more than two feet where the slope
is less than 5%. Elevations are to be based on a sea-level datum;
(2) Drainage channels, wooded areas, power transmission poles and lines,
and any other significant items shall be shown; and
E. Drafting of plat:
(2) Revision date(s), if any;
(9) Certificate of acceptance;
(10)
Certificate of Town Clerk;
(11)
Mayor, or designee, approval;
(12)
Certificate of mortgagee, if applicable; and
(13)
Proposed covenants and restrictions, if applicable.
Approval of the preliminary plat by the Town Council shall not
constitute final acceptance of the subdivision by the Town Council.
Preliminary approval shall confer upon the subdivider the right,
for a one-year period from the date of approval, that the general
terms and conditions under which the preliminary approval was granted
will not be changed. The subdivider must then comply with final approval
requirements. Construction of the improvements required for final
approval may be commenced upon preliminary approval subject to the
other requirements set out in this chapter or other Town ordinances.
Proper permits shall be obtained and provided to the Town prior to
performing any work on site.
A All design and construction drawings to be used by the subdivider in order to carry out development of improvements as shown on the preliminary plat and as required by Article
XII, Required Improvements, and including any other types of construction deemed necessary by the subdivider or Town Council, such as, but not limited to, lot grading, riprapping, diking, ditching or channelization, shall be subject to Town approval before any construction is started.
A. Such design and construction drawings shall be subject to the review
and approval of the Town Engineer, or third-party engineer selected
by the Town. The Town Council may, in its discretion, require the
subdivider to make appropriate changes in the drawings before construction
commences.
B. The drawings referred to in Subsections
A and
B of this section must be presented to the Town Engineer or third-party professional engineer at least 30 days prior to the planned construction date and receipt of required construction permits.