A.
Permanent concrete monuments which meet the specifications of the Borough shall be set at all boundary corners, angle points of boundary and such intermediary points as may be required at all new subdivisions to provide survey and property line control.
(1)
Bench marks shall be placed on all monuments in the streets based on the United States Coast and Geodetic Sandy Hook Datum. All lot corners shall be staked and plainly marked with metal pins.
B.
The installation and certification of all monuments and markers shall be made by a surveyor prior to the approval of the subdivision.
C.
The location of all monuments, markers and tie-in dimensions shall be shown on the plan for recording. No public improvements shall be accepted by the Borough until all monuments have been set and certified to by a surveyor.
D.
The location and installation of monuments and markers shall be planned to ensure that they will be permanent, accessible, and recoverable.
E.
All monumentation shall conform to recommended practices of the surveying profession, as contained in the most recent edition of the Manual of Practice for Professional Land Surveyors in the Commonwealth of Pennsylvania, or equivalent standard of professional practice acceptable to the Borough.
F.
Monuments shall be placed in a sufficient number of locations to define the boundary of a subdivision and the location of all streets. Sufficient monuments shall be placed to locate intersections, culs de sac, and curves in horizontal street alignments. Monuments shall be intervisible.
G.
Markers shall be placed at the corners of all lots or at such other locations as may be required to locate all lot lines.