The Township shall establish a fee schedule by resolution of
the governing body to defray plan review, construction inspection
and administrative costs incurred by the Township from any outside
agencies or entities (required to review the plans) and the Township
Engineer. The Township shall periodically update the review fee schedule
to ensure that incurred costs are adequately reimbursed. The applicant
shall pay all such fees and escrows.
The fees required by this chapter shall, at a minimum, cover
the following:
B. Review of the plans by the Township and the Township Engineer.
C. Site inspections by the Township staff and/or Township Engineer.
D. Inspection of stormwater management facilities and stormwater management
improvements during construction.
E. Final inspection upon completion of the stormwater management facilities
and stormwater management improvements presented in the as-built plan.
F. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and ensure proper completion
of stipulated remedial actions.