The applicant shall provide a financial guarantee to the Township
for the timely installation and proper construction of all stormwater
management controls as required by the approved stormwater management
site plan and this chapter equal to the full construction cost of
the required controls plus construction contingency and construction
inspection costs, which amount shall be calculated by the Township
Engineer.