A separate and independent building sewer shall be provided for every building, except that where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer.
Old building sewers may be used in connection with a new building only when they are found, on examination and test by the Director, to meet all requirements of this chapter.
Sanitary sewers from building discharge to the sanitary main in the City right-of-way shall be constructed of:
A. 
Polyvinyl chloride pipe (PVC) conforming to ASTM D3034 with a minimum pipe stiffness of 46 psi at a maximum deflection of 5% and a standard dimension ratio (SDR) of 35 or less.
B. 
Ductile iron pipe conforming to ASTM C151 and C110.
The size and slope of the building sewer shall be subject to the approval of the Director, but in no event shall the diameter be less than four inches. The slope of such four-inch pipe shall be not less than 1/4 inch per foot. The slope of a six-inch pipe shall be not less than 1/8 inch per foot.
Building sewers must be laid no closer than 10 feet from parallel water service pipes. Where building sewers must cross water pipes, the pipe length should be centered over or under the water pipe so that the pipe joints are as far as possible from the water pipe. If any joint is less than 10 feet from the water pipe, it must be encased in concrete. No building sewer shall be laid parallel to or within three feet of any bearing wall which might thereby be weakened. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. The building sewer shall be laid with a minimum depth of cover of four feet. The building sewer shall be laid at a uniform grade and in straight alignment where possible. Changes in direction shall be made with fittings that have offsets of 60° or less unless a cleanout is installed and brought to the surface.
In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such drain shall be lifted by approved artificial means and discharged to the building sewer.
Ductile iron and PVC pipe shall be installed and backfilled in accordance with ASTM 2321. Blocking under the pipe is not permitted. Trenches may not be backfilled until the work has been inspected. If groundwater is encountered or the excavation contains stormwater, the water level in the excavation must be lowered to a level below the invert of the public sewer before removing the lateral plug. Cleanouts must be provided at the City right-of-way.
All joints and connections shall be gastight and watertight. Ductile iron pipe shall be installed using mechanical or push-on joints conforming to ASTM C111. PVC pipe shall be joined with push-on joints or solvent welded joints conforming to ASTM D3034.
A. 
The plumber to whom a permit is issued shall notify the Highway/Sewer Superintendent or Code Enforcement Officer when the building sewer is ready for inspection and connection to the public sewer lateral.
B. 
Building sewer pipe installations must be inspected by the Highway/Sewer Superintendent or Code Enforcement Officer before backfilling has been started and before any connection to the public sewer lateral has been started. All inspections will be performed during normal working hours for the City DPW.
C. 
The backfilling of a trench or connection to a public sewer lateral before inspection by the Superintendent will subject the plumber to whom the permit has been issued to a penalty up to $1,000 for each offense plus all costs associated to repair condition. Violation of any terms of this chapter or any other of the rules and regulations of the City by a plumber or persons in his employ may result in suspension or revocation of recognition of the plumber by the City.
All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the City.