[Added 3-4-2024 by L.L. No. 4-2024]
Where reduced bulk requirements are identified in Attachment A for lots with central sewer facilities, such reduced bulk requirements shall be applicable in the event that an existing sewer main is available within the right-of-way directly adjacent to the lot, or in an easement to which the lot has legal rights of use and that any proposed dwelling will be connected to the main prior to issuance of a certificate of occupancy, or that:
A.
Where sewer mains do not presently exist, they are proposed to be extended to the lot prior to issuance of a certificate of occupancy, and a bond or letter of credit suitable in form and amount to the Town Board to guarantee construction of the main is provided by the applicant; or
B.
That the lot is located within a public sewer district and the following conditions exist:
(1)
The lot is not proposed as part of a major subdivision; and
(2)
The lot has been in existence for at least one year, or, if proposed as part of a minor subdivision, the lot had not been part of a prior subdivision within the last five years; and
(3)
A licensed professional engineer certifies and the Town Engineer verifies that based upon observed soil testing and review of a wastewater disposal system designed by a New York State licensed professional engineer that the lot may be occupied, and the wastewater disposed of without resulting in a danger to public health or personal property, and that adequate separation distance exists to protect existing public and private wells, and that the proposed system would not preclude the viability for constructing a private well on any adjacent lot.