All structures and devices used to support solar collections shall
be nonreflective and/or painted a subtle or earth-tone color. All
transmission lines and wiring associated with a principal use solar
energy system shall be buried, to the extent reasonably possible,
and include necessary encasements in accordance with the National
Electrical Code and Town requirements. The applicant is required to
show the locations of all proposed overhead and underground electrical
utility lines, including substations and junction boxes and other
electrical components, for the project on the site plan.