Gross Floor Area:
(square feet)
|
Spaces Required:
|
---|---|
0 to 1,000
|
Exempt
|
1,001 to 25,000
|
1
|
25,001 to 50,000
|
2
|
50,001 to 75,000
|
3
|
75,001 to 100,000
|
4
|
100,000 or greater
|
4 plus 1 space per each additional 50,000 square feet
|
Zone
|
Buffer
(feet)
|
---|---|
C or PE
|
5
|
MH
|
20
|
TH
|
20
|
APT
|
20
|
SC
|
20
|
MSR
|
10
|
NC
|
15
|
GC
|
20
|
LI
|
25
|
Zone
|
Coverage Minimum
|
---|---|
C and PE
|
90%
|
R
|
50%
|
AR-MHP
|
50%
|
TH and APT
|
40%
|
SC
|
40%
|
MSR
|
10%
|
NC
|
30%
|
GC
|
40%
|
LI
|
20%
|
Existing Tree
(inches)
|
Number of Replacement Trees
|
---|---|
18 or less
|
3
|
21 or less
|
4
|
24 or less
|
5
|
27 or less
|
6
|
29 or less
|
7
|
31 or less
|
8
|
33 or less
|
9
|
35 or less
|
10
|
37 or less
|
11
|
39 or less
|
12
|
L
|
=
|
Allowable leakage (GPH)
|
N
|
=
|
Number of joints tested
|
P
|
=
|
Average test pressure
|
D
|
=
|
Nominal diameter of pipe
|