[HISTORY: Adopted by the Board of Selectmen of the Town of
Salem as indicated in article histories. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch.
210.
Stormwater management — See Ch.
417.
[Adopted 11-15-1993 (Ch.
182 of the 1995 Code)]
Chapter 155-E of the New Hampshire Revised Statutes Annotated
requires that, with several exceptions, all mining and excavation
operations in the state obtain prior approval and permit from the
local municipality in which the operation is to occur. The purpose
of the statute and of these excavation regulations is to minimize
safety hazards created by open excavations; to safeguard the public
health and welfare; to preserve our natural assets of soil, water,
forests and wildlife; to maintain aesthetic features of our environment;
to prevent land and water pollution; and to promote soil stabilization.
A. Additional relevant definitions are contained in RSA 155-E, as amended,
and are made part of these regulations.
B. As used in this article, the following terms shall have the meanings
indicated:
EARTH
Sand, gravel, rock, soil or construction aggregate produced
by quarrying, crushing or any other mining activity or such other
naturally occurring unconsolidated materials that normally mask the
bedrock.
EXCAVATION
A land area which is used, or has been used, for commercial
taking of earth, including all slopes. Excavations shall be considered
commercial if earth material is sold or resold on or off the excavation
site. In addition, an excavation shall be considered commercial if
earth materials are transported to other land whose ownership is different
than the ownership of the land from which the earth was excavated.
EXCAVATION AREA
The area within an excavation site where excavation has occurred
or is eligible to occur under the provisions of RSA 155-E and these
regulations.
EXCAVATION SITE
Any area of contiguous land in common ownership upon which
excavation takes place.
All excavation areas require a permit except lawful existing
excavations, stationary manufacturing plants, public highway excavations,
and other exceptions as allowed in RSA 155-E:2 and 155-E:2-A.
A. The permit and zoning exemptions under §
252-3 shall not apply to any abandoned excavations as defined below.
(1) Any excavation, except for stationary manufacturing plants, for which the affected area has not been brought into complete compliance with the reclamation standards of these regulations (§§
252-6 and
252-8) shall be deemed abandoned if:
(a) No earth material of sufficient weight or volume to be commercially
useful has been removed from the site during any two-year period;
the regulator may extend the two-year period if the owner/operator
submits an acceptable timetable for reclamation to the regulator and
posts a performance guarantee in a form and amount prescribed by the
regulator sufficient to cover the costs of reclamation;
(b) The excavation site is still in use but does not conform to the site reclamation requirements of §§
252-6 and
252-8 of these regulations, or the owner/operator has not submitted an acceptable reclamation timetable to the regulator and posted a performance guarantee sufficient to cover the costs of reclamation; or
(c) The owner/operator of the excavation has neither secured a permit
pursuant to these regulations nor filed a report of an existing excavation
with the Town of Salem by August 4, 1991.
(2) The regulator, after notice and hearing pursuant to RSA 155-E:7,
may order, in writing, the owner of any land containing an abandoned
excavation to either file an acceptable reclamation timetable and
performance guarantee within a stated reasonable time by the regulator
to do so or complete the reclamation in accordance with these regulations
within one year of notification.
B. Failure to complete said reclamation within the prescribed time period
may result in the regulator requesting the Board of Selectmen to complete
the reclamation at the expense of the Town. The Town's costs shall
constitute an assessment against the owner and shall create a lien
against the real estate on which the excavation is located. Such assessment
and lien may be enforced and collected in the same manner as provided
for real estate taxes.
Except as provided for in §
252-3, any owner/operator subject to RSA 155-E shall, prior to excavation, apply to the Planning Board for a permit for excavation and submit a reclamation plan. The applicant shall also provide a copy of the application to the Town of Salem's Conservation Commission for comments. The permit application shall be signed and dated by the applicant, and the excavation plan shall contain the applicable information requested in the Excavation Application Checklist (see Appendix A). Waiver requests pertaining to these regulations may be submitted in writing to the regulator in accordance with §
252-16. All expenses for preparation of all plans, maps, and reports accompanying the application shall be borne by the applicant.
A. Copies of related permit approvals and other documents pertinent
to the excavation proposal, such as the Water Division of the New
Hampshire Department of Environmental Services (RSA 485-A:17), New
Hampshire Wetlands Bureau (RSA 482-A), stump disposal, New Hampshire
Department of Transportation (access permit, RSA 236:9 through 236:14),
and any other permits required by state or federal regulations, shall
be submitted, including such other information as the regulator may
reasonably require.
[Amended by the Board of Selectmen 11-2-2015]
B. Hauling information shall be submitted, including routes to be utilized
and the type and weight of motor vehicles involved, and the frequency
and schedule of operations of such vehicles shall be provided to the
regulator prior to the issuance of an excavation permit. The regulator
may require modifications to such plans and/or may place conditions
upon such operations, depending on surrounding land uses and road
conditions. The regulator reserves the right to conduct a traffic
study at the applicant's expense to ensure that public safety, neighborhood
compatibility and road capacity and condition have been properly considered
and addressed in the hauling plan.
A. Size and
reclamation time limit on new excavations. No excavation of a new
area shall exceed five acres in size at any one time. Any permitted
excavation shall be reclaimed according to the approved application
within one year after the permit expiration date. If reclamation of
the site is not completed within one year after the permit expiration
date, the Town may declare part or all of the performance guarantee
forfeited and use these moneys to reclaim the site.
A. No excavation covered under RSA 155-E shall be permitted closer than
50 feet to the boundary of a disapproving abutter. If written concurrence
is received from an abutter, then the boundary setback shall be 10
feet.
B. No excavation covered under RSA 155-E shall be permitted closer than
150 feet to an existing dwelling or to a dwelling for which a building
permit has been issued at the time the excavation is begun.
C. No excavation shall be permitted within 75 feet of any great pond,
navigable river, or any other standing body of water 10 acres or more
in area or within 25 feet of any other perennial stream, river, or
brook (as delineated on United States Geological Survey maps), or
any naturally occurring standing body of water of less than 10 acres,
prime wetlands as designated in accordance with RSA 482-A:15, I, or
any other wetland greater than five acres in area as defined by the
New Hampshire Wetlands Bureau.
[Amended by the Board of Selectmen 11-2-2015]
D. No excavation shall be permitted below road level within 50 feet
of the right-of-way of any public highway as defined in RSA 229:1
unless such excavation is for the purpose of said highway.
E. Vegetation shall be maintained or provided within the buffer areas required by Subsections
A,
B and
C.
F. Appropriate erosion, sedimentation, air and water quality measures
shall be integrated into the excavation process. Excavations shall
comply with the grading, drainage, and erosion and sediment control
provisions of the Town's Subdivision Regulations.
G. Where the depth of excavation will exceed 15 feet and temporary slopes
will exceed 1:1 in grade, every reasonable effort shall be made to
warn of danger and/or limit access to the site. In addition, in accordance
with RSA 31:41-b, the regulator may require removal, stabilization,
or fencing of such hazardous embankments, for the protection of the
health and safety of the public.
H. Excavation practices which result in siltation in streams or degradation
of any water supplies are prohibited.
I. Topsoil shall be stripped from the excavation area and stockpiled
for use in subsequent reclamation of the site. It shall be protected
from erosion (e.g., by seeding, covering, or other acceptable practices).
No topsoil shall be removed from the site without specific approval
from the regulator.
J. All temporary structures required during excavation operations shall
be removed from the site within 30 days after such operations cease.
K. All vehicles transporting excavated material shall utilize adequate
covering and/or sideboards to prevent dust and spillage when loaded.
L. No fuels, lubricants or other toxic or polluting chemicals shall
be stored on site unless in compliance with state and federal laws
or rules pertaining to fuels and lubricants or other toxic or polluting
chemicals.
M. Prior to the stripping of topsoil or removal of stumps or other material
from any land area that has not yet been excavated, the excavator
shall file a reclamation bond or other performance surety, as prescribed
by the regulator, sufficient to cover the cost of site reclamation.
N. Access roads leading to the excavation site shall intersect existing
streets and roads at locations that have been duly approved by state
or local officials and in a manner that will not endanger the safety
of highway users and local residents. The provisions of RSA 236:13
and 236:14 (highway access) shall be adhered to by the applicant and
shall be shown on the excavation plan.
O. Permit approval shall be conditional on compliance by the applicant
with street and highway regulations promulgated by federal, state
and local units.
P. No excavation shall substantially damage any aquifer identified on
mapping by the U.S. Geological Survey.
Q. The applicant shall be responsible for a proportionate share of refurbishing
existing Town roads which access the excavation site and for the repair
of Town-maintained roads which are damaged as a result of hauling
earth from the site. The regulator may require these costs to be part
of the performance guarantee.
R. No solid and/or hazardous waste, septage, dredge spoils, or organic
waste and debris shall be disposed of on the excavation site unless
specifically authorized and/or permitted by the appropriate federal,
state and local authority(ies).
S. The applicable state statutes and regulations pertaining to forest
practice and timber harvesting shall apply to the removal of vegetative
cover at excavation sites.
T. The regulator shall approve the hours of operation. Specified days
(e.g., Sundays and state and/or federal holidays) shall be restricted
for operation by the regulator. Hours of operation, including any
machinery use, other than those stipulated may be allowed if specifically
authorized by the regulator.
U. Excavation operations shall be set back at least 40 feet from wetlands as defined in Chapter
490, Zoning, and it must be demonstrated that no sedimentation of the wetlands will occur as a result of the excavation. The regulator shall have the authority to require greater wetlands setbacks in situations where it can be demonstrated that such setbacks are necessary.
Within 12 months after the expiration date of a permit issued
under these regulations, or of the completion of any excavation, whether
subject to permit or not (whichever occurs first), the owner of the
excavated land shall have completed the reclamation of the affected
area(s). With the exception of those excavations associated with stationary
manufacturing plants, the following minimum standards must be met
as part of the reclamation:
A. Reclaimed slopes shall blend with the surrounding terrain and shall
not be abrupt.
B. All debris, stumps, boulders, etc., shall be lawfully disposed of
in a manner acceptable to the regulator or its designee.
C. Ground levels and grades shall be established as shown on the approved
reclamation plan as soon as practical during site excavation, but
not later than one year after excavation has been completed.
D. The responsible party shall not be released from its performance
commitment (performance guarantee) until the regulator certifies compliance
with all terms of the excavation plan and the reclamation plan.
E. Any excavated area of five contiguous acres or more which is either fully excavated per the approved plan (excluding bedrock) or from which no earth materials have been removed for a two-year period shall be reclaimed in accordance with §
252-6 and this section within one year following such full excavation or two-year period, regardless of whether other excavation is occurring on adjacent land in contiguous ownership.
F. The regulator may require the elimination of any standing bodies
of water created in the excavation project that may constitute a hazard
to health and safety.
G. Upon completing the reclamation, the topography of the land shall
be left so that water draining from the site leaves the property at
the original, natural drainage points and in the natural proportions
of flow.
The regulator shall not grant a permit under the following conditions:
A. Where the excavation would violate the operational standards of §
252-7 or the reclamation provisions of §§
252-6 and
252-8.
B. Where existing visual barriers would be removed, except to provide
access to the excavation.
C. Where the excavation would substantially damage a known aquifer,
so designated by the U.S. Geological Survey in the report titled "Geohydrology
and Water Quality of Stratified-Drift Aquifers in the Lower Merrimack
and Coastal River Basins, Southeastern New Hampshire, 1992."
D. For excavation within 150 feet of an existing dwelling or a dwelling
for which a building permit has been issued at the time the excavation
is begun.
E. Where the excavation is not permitted by zoning or other applicable
ordinances, unless the application is approved by variance or the
special exception procedure contained in RSA 155-E:4, III.
F. Where an excavation is proposed below road level within 50 feet of
any highway right-of-way unless such excavation is for the purpose
of said highway.
When the scope of a project for which an excavation permit has
been issued is proposed to be altered so as to affect either the size
or location of the excavation, the rate of removal or the plan for
reclamation, the owner shall submit an application for amendment of
his excavation permit. The amended application shall be subject to
approval in the same manner as provided for an excavation permit.
Prior to the regulator approving an application for a permit
or an application for an amended permit, a public hearing shall be
held within 30 days of receipt of a completed application. A notice
of said hearing shall be sent to all abutters and shall specify the
grounds for the hearing as well as the date, time and place. At least
14 days' notice of the time and place of such hearing shall be published
in a paper of general circulation in the Town, and legal notice thereof
shall also be posted in at least three public places in the Town;
the 14 days shall not include the day of publication or the day of
the meeting but shall include any Saturdays, Sundays and legal holidays
within said period. Within 20 days of said hearing or any continuation
thereof, the Planning Board shall issue a written decision approving
or disapproving the application, giving reasons for disapproval.
If the regulator, after public hearing, approves the application
for a permit and determines it is not prohibited by these regulations,
it shall grant the excavation permit upon the posting of a performance
guarantee in the amount determined by the regulator to be sufficient
to guarantee compliance with the permit. The performance guarantee
shall be for a reasonable time period determined by the regulator.
A copy of the permit shall be prominently posted at the excavation
site and the principal access thereto. A permit shall not be assigned
or transferred without the prior written consent of the regulator.
Unless otherwise specifically decided by the regulator, a permit shall
be valid for a period of one year from the date of issuance. The regulator
may include in a permit such reasonable conditions as are consistent
with the purpose of RSA 155-E and these regulations and may include
excavation permit requirements which are more stringent than the standards
set forth in RSA 155-E, including the provision of visual barriers
to the excavation. A permit fee in an amount determined by the regulator
for application plan review and annual compliance review, by the regulator
or its designated agent, shall be assessed to the applicant upon application
for permit. In addition, fees may be required for the municipality's
designated engineer or other agents of the regulator to periodically
conduct required studies or field reviews at the excavation site to
ensure compliance with the approved excavation and reclamation plans.
The regulator shall establish the amount of a performance guarantee prior to the issuance of the excavation permit. The performance guarantee amount shall be reasonably sufficient to guarantee compliance with the restoration in compliance with §§
252-6 and
252-8. The guarantee requirements shall be based on the acreage of the project or approved phases and the estimated per acre restoration costs. The performance guarantee will be returned to the applicant when restoration work has been completed and a final satisfactory site inspection has been conducted by the regulator or its designee.
If the regulator disapproves or approves an application for
an excavation permit or an application for an amended permit, any
interested person affected by such decision may appeal to the regulator
for a rehearing on such decision or any matter determined thereby.
The motion for rehearing shall fully specify every ground upon which
it is alleged that the decision or order complained of is unlawful
or unreasonable, and said appeal shall be filed within 10 days of
the date of the decision appealed from. The regulator shall either
grant or deny the request for rehearing within 10 days, and if the
request is granted, a rehearing shall be scheduled within 30 days.
Any person affected by the regulator's decision on a motion for rehearing
may appeal in accordance with the procedures specified in RSA 677.
A. The regulator or its duly authorized agent may suspend or revoke the permit of any person who has violated any provision of his permit or these regulations or made a material misstatement in the application upon which his permit was granted. Such suspension or revocation shall be subject to a motion for rehearing thereon and appeal in accordance with §
252-14.
B. Fines, penalties and remedies for violations of this regulation shall
be the same as for violations of RSA Title LXIV, as stated in RSA
676:15, 676:17, 676:17-a and 676:17-b.
[Amended by the Board of Selectmen 11-2-2015]
C. The regulator or its duly authorized agent(s) will conduct site inspections
to verify permit compliance on an annual basis, unless a more frequent
site visitation is necessary due to special characteristics of the
excavation or restoration plans. To ascertain if there is compliance
with this regulation, a permit issued hereunder or an order issued
hereunder, the regulator or its duly authorized agent(s) may enter
upon any land on which there is reason to believe an excavation is
being conducted or has been conducted since August 24, 1979.
D. Where these regulations are in conflict with other ordinances, regulations
or laws, the more stringent shall apply.
The regulator, upon application and following a public hearing, may grant a waiver in writing in cases where, in the opinion of the Planning Board, strict conformity would pose an unnecessary hardship to the applicant and the waiver would not be contrary to the spirit and intent of the regulations (except as prohibited by RSA 155-E). The written decision shall state specifically what standards, if any, are being relaxed and include reasonable alternative conditions or standards. The regulator's decision on any waiver request may be appealed in accordance with §
252-14.
[Adopted by the Board of Selectmen 2-26-2018]
Per the Town of Salem, New Hampshire, Board of Selectmen, a
person shall not disturb, excavate, or open the ground or pavement
in any street, highway, sidewalk, or within the Town right-of-way,
without first obtaining authorization from the Municipal Services
Department, Engineering Division. Street opening permits shall be
issued on an application form provided by the Town.
All applications for a permit to excavate in, or open, a public
right-of-way shall include, for each permit applied for, the fees
listed in general permit conditions and construction requirements.
The Municipal Services Department is authorized to establish and publish
rules, regulations, and procedures, including general permit conditions
and construction requirements related to street excavation permits,
and to prescribe the forms necessary for the management and operation
of the excavation permit programs under this Code. These rules, regulations,
and procedures shall be subject to review and approval by the Board
of Selectmen.
Permit requirements are as follows:
B. Required bonding and insurance on file with Town.
C. Proposed traffic control plan.
D. Work zone photos with premarks.
Persons who operate without a permit or violate the provisions
of any permit required by this article shall be subject to the penalty
outlined in general permit conditions and construction requirements.
If the Engineering Division determines that an excavation is not being
carried out in accordance with the requirements, a written notice
will be issued to the persons or business entities in violation. The
written notice will generally contain pertinent information, including
excavation location, violation, and any applicable penalties assessed,
including right to excavate in the Town.
Per Article 36 of the 1990 Annual Town Meeting: to prohibit
excavation, including utility cuts, within the traveled way of any
newly reconstructed roadway of the Town for a period of five years
from such reconstruction, except for emergency excavation which the
Board of Selectmen determines to be in the interest of public health
and safety.
A. In an effort to protect the Town's investment in its infrastructure,
excavations in newly constructed, reconstructed, rehabilitated, or
overlaid pavements within the public right-of-way or on Town property,
no excavation shall occur under the following:
(1) For newly reconstructed roads, the moratorium period shall be five
years from such reconstruction.
(2) For newly milled and overlaid roads, the moratorium period shall
be three winters from such mill and overlay.
B. The Town through its Board of Selectmen may grant waivers under the
following but not limited to:
(1) Excavations to remedy a public emergency or a situation that creates
an imminent threat to the public safety, health, or welfare.
(2) Repair or modification to prevent interruption of essential utility
services where no reasonable alternatives are available to avoid excavation
in new pavements.
(3) Relocation work that is mandated by state or federal legislation.
(4) Utility services for new development, buildings, or parcels without
existing utility services where no other reasonable means of providing
services exists or which are identified in utility master plans as
determined by the Engineering Division.
(5) Excavations within streets under moratorium where reconstruction
is needed due to failure of original pavement.
C. In all of the above, if warranted and allowed, the applicant will
pay an additional pavement life reduction factor. This is calculated
by the following:
(1) Street pavement less than two years old: three times the street damage
charge.
(2) Street pavement two to five years old: two times street damage charge;
or
D. The Board of Selectmen as recommended by Municipal Services may require
full lane width mill and overlay for any trench that falls into this
category.
A. Pavement cutting. All bituminous concrete or concrete pavements shall
be cut before any excavation is started. The pavement shall be neatly
and uniformly saw cut at each side of all trenches to ensure against
unnecessary damage to pavement. An acceptable alternative to saw cutting
is cold planing.
B. Excavation. Excavation shall be performed in a manner as to produce
the minimum possible width of disturbance. Excavation and handling
of materials shall be performed in a manner as to minimize the possibility
of cave-ins. Sheeting and shoring shall be used in accordance with
OSHA requirements to prevent such undermining. Pavement projecting
over undermined areas shall be saw cut square and removed. No opening
or excavation in any street shall extend beyond the center line of
the street before the excavated side of the street is made passable
to traffic. Where a trench crosses a street, steel plates capable
of bridging the trench and supporting traffic may be used.
C. Backfill.
(1) Backfill material may consist of material excavated during the course
of construction if dry, but excluding pieces of pavement, frozen material,
organic matter, topsoil, muck, peat, clay, rocks larger than six inches,
or any other deleterious material that is deemed unacceptable by the
Engineering Division. If considered unsuitable for backfill, excavated
material shall be replaced with granular backfill as specified in
the "Standard Specifications for Road and Bridge Construction," State
of New Hampshire, Department of Transportation (Sand-NHDOT 209.3 Gravel-NHDOT
209.4).
(2) Excavated material shall be replaced or backfilled in layers or courses
not to exceed 12 inches in compacted thickness; and shall be compacted
at or near optimum moisture content using pneumatic tampers, vibratory
compactors or other approved means. Select materials immediately under
the pavement (gravels and processed gravels or reclaimed asphalt)
shall be replaced in kind or to a minimum depth of 12 inches of gravel
and four inches of crushed gravel meeting NHDOT Standard Specifications
for Road and Bridge Construction (Gravel NHDOT 304.2, Crushed Gravel
304.3).
D. Compaction. All excavated materials shall be compacted to a minimum
of 95% of the optimum density (ASTM 1557 Method D). A compaction test
performed by a certified material testing laboratory may be required.
If required, the compaction test must be performed prior to paving
and the results submitted to the Engineering Division. If a trench
exceeds 100 feet in length, compaction tests shall be required every
100 feet prior to paving.
E. Work zone maintenance. The roadway shall be periodically swept to
remove materials from the traveled way. The roadway shall be cleaned
of all foreign materials at the end of each working day.
F. Trench restoration. A typical section for permanent pavement repair
is attached as a reference. In general these guidelines will be followed
accordingly with the Engineering Division making the final determination
on any variance in consideration of the application.
G. Bituminous trench patch. A temporary patch shall be placed using
one of the following methods:
(1) Temporary patch method one. Bituminous concrete binder course will
be brought to the surface grade at a minimum depth of 2 1/2 inches.
This temporary patch will be maintained as necessary by the contractor
and allowed to remain in place for a minimum of 30 days but not more
than 60 days (stabilization period). At the end of the stabilization
period the temporary patch will be cut out and the trench trimmed
with neat straight cuts and square corners a minimum distance of 12
inches onto undisturbed material beyond the limits of the temporary
patch area or of the observed settlement area, whichever is greater.
The contractor will add or remove crushed gravel and compact, if necessary.
(2) Temporary patch method two. The gravels shall be brought to the appropriate
grade and bituminous concrete binder course brought to the surface
grade. This temporary patch will be maintained as necessary by the
contractor and allowed to remain in place for a minimum of 30 days
but not more than 60 days (the stabilization period). At the end of
the stabilization period the temporary patch will be milled to the
depth of 1 1/2 inches a minimum distance of 12 inches onto undisturbed
material beyond the limits of the temporary patch area or of the observed
settlement area, whichever is greater.
H. Permanent patch shall be installed as follows:
(1) Temporary patch and existing pavement shall be removed in a manner
that results in no damage to adjacent pavement and shall be replaced
with an equal depth but not less than four inches (two-and-five-tenths-inch
binder course Type B and one-and-five-tenths-inch wearing course Type
F) of hot bituminous pavement conforming to the standard specifications
below.
(2) Limits of saw cuts or milling for final patching shall be approved
by the Engineering Division prior to execution of final paving. The
Town may require the limits of the area to increase due to any damage
in the work area.
(3) In the case of a transverse or diagonal trenching, the pavement shall
be cut to provide a diamond-shaped patch with at least two-foot minimum
overlap, four-foot in center if full width, of the final patch onto
undisturbed material that will permit only one wheel of a vehicle
at a time to strike the patch area.
(4) An approved asphalt emulsion (tack coat) shall be applied to the
face of all exposed joints of the existing pavement and between all
pavement lifts. Rolling shall be done with a self-propelled roller
weighing not less than eight tons to achieve ninety-five-percent compaction
and shall continue until a firm, even surface true to the lines and
grade is obtained.
(5) In cases where multiple excavations are made in a street which would
result in multiple patches, the Engineering Division at its discretion
may require a continuous patch or overlay across the entire work zone.