General requirements for stormwater management:
A.
All regulated earth disturbance activities within the Borough shall be designed, implemented, operated, and maintained to meet the purposes of this chapter, through these two elements:
B.
No regulated earth disturbance activities within the Borough shall commence until the requirements of this chapter are met.
C.
Erosion and sediment control during regulated earth disturbance activities shall be addressed as required by § 120-10.
E.
All best management practices (BMPs) used to meet the requirements of this chapter shall conform to the state water quality requirements, and any more stringent requirements as determined by the Borough.