If compliance with any of the requirements of this chapter would result in an exceptional hardship to a prospective builder, developer or landowner, East Earl Township may, upon request, grant relief from the strict application of the requirements.
A.
Requests for variances shall be considered by East Earl Township in accordance with the procedures contained in § 222-16 and the following:
(1)
No variance shall be granted for any construction, development, use, or activity within any floodway area/district that would cause any increase in the BFE on adjacent upstream or downstream properties.
(2)
No variance shall be granted for any construction, development, use, or activity within any AE Area/District without floodway that would, together with all other existing and anticipated development, increase the BFE more than one foot at any point on adjacent upstream or downstream properties.
(3)
Except for a possible modification of the regulatory flood elevation requirement involved, no variance shall be granted for any of the other requirements pertaining specifically to development regulated which may endanger human life.
(4)
If granted, a variance shall involve only the least modification necessary to provide relief.
(5)
In granting any variance, East Earl Township shall attach whatever reasonable conditions and safeguards it considers necessary in order to protect the public health, safety, and welfare, and to achieve the objectives of this chapter.
(7)
In reviewing any request for a variance, East Earl Township Zoning Hearing Board shall consider, at a minimum, the following:
(8)
A complete record of all variance requests and related actions shall be maintained by East Earl Township. In addition, a report of all variances granted during the year shall be included in the annual report to FEMA.
B.
Notwithstanding any of the above, however, all structures shall be designed and constructed so as to have the capability of resisting the one-percent annual chance flood.