The Zoning Board of Appeals, as established by Town Law, shall hear
and decide appeals and requests for variances from the requirements
of this chapter.
The Zoning Board of Appeals shall hear and decide appeals when it
is alleged there is an error in any requirement, decision, or determination
made by the local administrator in the enforcement or administration
of this chapter.
Those aggrieved by the decision of the Zoning Board of Appeals may
appeal such decision to the Supreme Court pursuant to Article 78 of
the Civil Practice Law and Rules.
In passing upon such applications, the Zoning Board of Appeals shall
consider all technical evaluations, all relevant factors, standards
specified in other sections of this chapter and:
The expected heights, velocity, duration, rate of rise, and
sediment transport of the floodwaters and the effects of wave action,
if applicable, expected at the site; and
The costs of providing governmental services during and after
flood conditions, including search and rescue operations, maintenance
and repair of public utilities and facilities such as sewer, gas,
electrical, and water systems and streets and bridges.
Upon consideration of the factors of Subsection D and the purposes of this chapter, the Zoning Board of Appeals may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.
The local administrator shall maintain the records of all appeal
actions, including technical information, and report any variances
to the Federal Emergency Management Agency upon request.
Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one-half acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood level, provided items (1) through (12) in § 157-18D have been fully considered. As the lot size increases beyond the one-half acre, the technical justification required for issuing the variance increases.
Variances may be issued for the reconstruction, rehabilitation or
restoration of structures and contributing structures listed on the
National Register of Historic Places or the State Inventory of Historic
Places, without regard to the procedures set forth in this chapter.
Variances may be issued by a community for new construction and substantial
improvements and for other development necessary for the conduct of
a functionally dependent use, provided that:
The structure or other development is protected by methods that minimize
flood damages during the base flood and create no additional threats
to public safety.
A determination that the granting of a variance will not result in
increased flood heights, additional threats to public safety, extraordinary
public expense, create nuisances, cause fraud on or victimization
of the public or conflict with existing local laws or ordinances.
Any applicant to whom a variance is granted for a building with the
lowest floor below the base flood elevation shall be given written
notice that the cost of flood insurance will be commensurate with
the increased risk.