Skip to content
home Home
code Code
Code
law Laws (0)
New Laws (0)
Law Ledger (0)
help_center Help
Help
About Us
ecode
Login
Township of Clinton, PA chevron_right chevron_right Part II: General Legislation chevron_right Chapter 127 Stormwater Management

Chapter 127 Stormwater Management

[HISTORY: Adopted by the Board of Supervisors of the Township of Clinton 5-24-2011 by Ord. No. 2011-03. Amendments noted where applicable.]
ATTACHMENTS
Attachment 1 - Appendix A, Operation and Maintenance AgreementAttachment 2 - Appendix B, Low Impact Development PracticesAttachment 3 - Appendix C, Stormwater Management Design CriteriaAttachment 1 - Appendix D, Review Fee Reimbursement AgreementAttachment 5 - Appendix E, Small Project SWM ApplicationAttachment 6 - Appendix F, Release Rate MapAttachment 7 - Appendix G, On Lot Sump Calculations and Specifications
Article I General Provisions
§ 127-1 Short title.
§ 127-2 Statement of findings.
§ 127-3 Purpose.
§ 127-4 Statutory authority.
§ 127-5 Applicability and exemptions.
§ 127-6 Repealer; conflict with other provisions.
§ 127-7 Severability.
§ 127-8 Compliance with other provisions.
§ 127-9 Duty of persons engaged in land development.
§ 127-10 Township liability disclaimer.
Article II Terminology
§ 127-11 Word usage.
§ 127-12 Definitions.
Article III Stormwater Management Standards
§ 127-13 General requirements and standards.
§ 127-14 Requirements for single-family and low-impact land developments.
§ 127-15 Requirements for standard-impact land developments.
§ 127-16 Waivers.
§ 127-17 Volume controls.
§ 127-18 Rate controls.
§ 127-19 Sensitive areas and stormwater hotspots.
Article IV Erosion and Sedimentation Standards
§ 127-20 Requirements during earth disturbance activities.
Article V Protected Watershed Standards
§ 127-21 Requirements.
Article VI Design Criteria
§ 127-22 Guidelines for stormwater management and drainage facilities.
§ 127-23 Calculation methodology.
Article VII SWM Site Plan and Report Requirements
§ 127-24 General requirements.
§ 127-25 SWM site plan and report contents.
§ 127-26 SWM site plan and report submission.
§ 127-27 SWM site plan and report review.
§ 127-28 Modification of plans.
§ 127-29 Authorization to construct and term of validity.
§ 127-30 Record drawings, completion certificate; final inspection.
Article VIII Easements and Covenants
§ 127-31 Recordation required.
Article IX Maintenance Responsibilities
§ 127-32 Financial guarantee.
§ 127-33 Maintenance guidelines.
§ 127-34 Maintenance agreement for privately owned stormwater facilities.
Article X Inspections
§ 127-35 Schedule of inspections.
§ 127-36 Right of entry.
Article XI Enforcement and Penalties
§ 127-37 Notification.
§ 127-38 Enforcement.
§ 127-39 Public nuisance.
§ 127-40 Suspension and revocation.
§ 127-41 Violations and penalties.
§ 127-42 Appeals.
Article XII Prohibitions
§ 127-43 Prohibited discharges and connections.
§ 127-44 Roof drains.
§ 127-45 Alteration of BMPs.
Article XIII Fees and Expenses
§ 127-46 General.
§ 127-47 Expenses covered by fees.
Article XIV Adoption
§ 127-48 Effective date.
By using eCode360 you agree to be legally bound by the Terms of Use and Privacy Policy.
eCode360: Get a Professional Subscription