[Adopted 10-18-2018 FTM by Art. 2 (Art. LVIV of the Bylaw Compilation)]
The Stretch Energy Code, as codified by the Massachusetts Board of Building Regulations and Standards as 780 CMR 115.AA, including any future editions, amendments or modifications thereto, shall be a requirement of the issuance of any building permit by the Town’s Building Inspector under the relevant sections of the building code for both new construction and existing buildings of a residential and commercial nature. Buildings not included in this scope shall comply with 780 CMR 13.00, 34.00, 61.00, or 93.00, as applicable.