[Ord. No. 135, 11/18/1992; as amended by Ord. No. 165, 4/26/1999; and by Ord. No. 274, 10/5/2011]
Upon the completion of all improvements required under Part
5 (Design Standards and Required Improvements) of this chapter, the applicant or developer shall supply the Township with a set of plans for the entire tract showing all lot lines as deeded and all surface improvements and subsurface improvements as actually constructed. The plans shall be prepared at the same scale as the approved final plan. The plans will also be submitted on a CD in an electronic format compatible with Township's GIS software. Sanitary sewer facilities shall be mapped using GPS/GIS with this information being submitted to the Township.
The as-built/improvements plan shall contain the information and requirements specified under § 27-805 (Appendix E) of this chapter. The applicant/developer shall submit the as-built/improvements plan to the Township for review and approval prior to the acceptance of any municipal improvements within the development.