General Fees
| ||
State surcharge is $0.00265 per cubic foot on new buildings
and additions.
| ||
For all others, the State surcharge is $1.35 per $1,000
| ||
Minimum fee for each subcode is $50
| ||
The State of New Jersey permit surcharge fee shall be collected
at the rate in effect at the time of permit issuance as per N.J.A.C.
5:23-4.19(b)
| ||
Minimum Fee for each sub-code is $50
| ||
Replacement of existing Residential (1 and 2 family) heating
or air-conditioning system
|
$125
| |
Contractor Change - per sub-code
|
$50
| |
Use Group Change
|
$200
| |
Re-Installment of lapsed or suspended permit
|
$125
| |
Application for Variation Fee
|
$175
| |
Annual Permit Fee
| ||
1 - 25 workers (per workers)
|
$700
| |
Additional workers (per worker)
|
$250
| |
Certificate of Occupancy - All Use Groups
|
$50
| |
Certificate of Occupancy - Asbestos
|
$50
| |
Certificate of Continued Occupancy
|
$250
| |
Certificate of Clearance for Lead
|
$50
| |
Plan Review Fee = 20% of Total Building Department Fee
| ||
New Building Construction - Per cu. ft.
| ||
(Residential and Commercial)
|
$0.030
| |
Except Use S1 and S2
|
$0.020 per cu. ft.
| |
Additions calculated same as New Construction
| ||
Rehabilitation - Alterations, Renovation, Repair and Reconstruction
(per $1,000 of construction cost)
| ||
Residential
| ||
Up to $50,000
|
$25 per $1,000
| |
Above $50,000
|
$20 per $1,000
| |
Commercial
| ||
Up to $50,000
|
$30 per $1,000
| |
Above $50,000
|
$30 per $1,000
| |
Residential Roof and Siding-1 and 2 Family only
|
$60
| |
Sign
|
$100 each
| |
Above Ground Swimming Pool
|
$100
| |
In-Ground Swimming Pool
|
$250
| |
Asbestos Abatement
| ||
Subchapter 8
| ||
Administrative Fee for Construction
|
$100
| |
Lead Hazard
|
$150
| |
Demolition (Commercial)
|
$1,500/bldg
| |
Demolition (Residential - less than 5,000 square feet, 30 feet)
|
$250
| |
Tents (when UCC permits are required)
|
$125
| |
Commercial Floor Finishes (carpet, wood and sheet goods)
| ||
Less than 1,000 square feet (11 cy)
|
$75
| |
Greater than 1,000 square feet (11 cy)
|
$150
| |
ELECTRICAL FEE SCHEDULE
| ||
Minimum Fee is $50
| ||
Electrical Devices (Receptacles and Fixtures)
| ||
First 50
|
$50
| |
For each additional 25
|
$25
| |
Electrical Devices counts shall also include fractional HP
| ||
Equipment/Appliances, smoke, heat, CO detectors, bells, horns/strobes,
water flow or tamper switch, low/high air and pull stations. In additional,
security items such as security door/window alarm points, card readers,
magnetic locks, etc.
| ||
Motors and Electrical Devices
| ||
1 to 10hp
|
$20
| |
15hp to 50hp
|
$50
| |
60hp to 100hp
|
$100
| |
Greater than 100hp
|
$457
| |
Electrical Devices (including Transformers and Generators)
| ||
Up to 10kw
|
$20
| |
11kw to 45kw
|
$50
| |
46kw to 112kw
|
$100
| |
Greater than 112kw
|
$457
| |
Service Equipment (including Services, Motor Control Centers,
Subpanels and Panels)
| ||
Up to 225 amps
|
$75
| |
300 amp to 400 amps
|
$150
| |
600 amp to 1,000 amps
|
$275
| |
Larger than 1,000 amp
|
$450
| |
Other Electrical Fees
| ||
Swimming Pools
| ||
Above Ground
|
$75
| |
In Ground
|
$125
| |
Spas, hot-tubs, fountains, etc.
|
$75
| |
Underground Electrical Trench
|
$75
| |
Annual Swimming Pool Inspections (per UCC)
|
$200
| |
PLUMBING FEE SCHEDULE
| ||
Minimum Fee is $50
| ||
Water Closet
|
$15
| |
Urinal/Bidet
|
$15
| |
Bath Tub
|
$15
| |
Lavatory
|
$15
| |
Shower
|
$15
| |
Floor Drain
|
$15
| |
Sink
|
$15
| |
Dishwasher
|
$15
| |
Drinking Fountain
|
$15
| |
Washing Machine
|
$15
| |
Hose Bibb
|
$15
| |
Stacks
|
$15
| |
Water Heater
|
$45
| |
Fuel Oil Piping
|
$45
| |
Gas Piping (up to 4 outlets)
|
$45
| |
$10 (each additional outlet)
| ||
LP Gas Tank - piping or oil tank - piping
|
$100
| |
Residential Hot Water or Steam Boiler
|
$75
| |
Commercial, Furnace, HVAC, Roof Top Unit Hot Water or Steam
Boiler
|
$250
| |
Steam/Hot water piping (2 and 4 pipe systems)
|
$75
| |
Sewer Pump
|
$65
| |
Oil Interceptor/Separator
|
$75
| |
Backflow Preventer (commercial)
|
$75
| |
Backflow Preventer (residential)
|
$15
| |
Grease Trap
|
$75
| |
Sewer Connection
|
$75
| |
Water Service or Sewer Connection
|
$75
| |
Underground Trench
|
$75
| |
HVAC, Furnace, heat pump, air conditioning or heat exchanger
|
$75
| |
Medical Gas Stations
|
$65
| |
Condensate Lines
|
$45
| |
Geothermal System (closed loop)
|
$75
| |
Annual Safety Inspections (per UCC)
|
$100
| |
Air Admittance Valves
|
$15
| |
FIRE PROTECTION FEE SCHEDULE
| ||
Minimum Fee is $50
| ||
Storage Tanks
| ||
Fuel Storage Tanks
| ||
Installation (above ground and underground) 550 gallon and less
|
$125
| |
Greater than 550 gallons
|
$250
| |
Storage Tanks Removal or abandonment (above and underground)
550 gallons or less
|
$125
| |
Greater than 550 gallons
|
$350
| |
Alarm Systems, Sprinkler Systems/Supervisory/Signaling/Security
Systems
| ||
Alarm Devices (Smoke, Heat, CO Detectors, bells, horns/strobes,
water flow or tamper switch, low/high air and pull stations). Also
included are security items such as security door/window alarm points,
card readers, etc.
| ||
First 10
|
$100
| |
11 - 50
|
$200
| |
Each additional 50
|
$200
| |
Fire Alarm Control Panel
|
$150
| |
Wet and Dry Sprinkler Heads
| ||
1 - 10
|
$150
| |
11 - 50
|
$250
| |
Each Additional 100
|
$100
| |
Stand Pipes
|
$250/each
| |
Pre-Engineered and Kitchen Hood Suppression Systems
| ||
Wet Chemical, Dry Chemical, CO2, Foam or Clean Agent
|
$200
| |
Miscellaneous
| ||
Kitchen Hood Exhaust System
|
$200
| |
Fire Pump
|
$500
| |
Pre-Action Fire Systems
|
$300
| |
Dry Pipe Alarm Valves
|
$100
| |
New Residential Gas or oil fired equipment
|
$65
| |
Commercial Gas or Oil Fired Equipment
|
$125
| |
Chimney Liner or Metal Flue Vent
|
$100
| |
Smoke Control System
|
$495
| |
Underground Fire Lines/Mains
|
$150
| |
Magnetic Locks with Fire Alarm Interface
|
$65
| |
ELEVATOR FEE SCHEDULE
| ||
Minimum Fee is $50
| ||
Elevator Plan Review Inspections: All associated fees for elevator
devices shall be in accordance with the rate in effect per N.J.A.C.
5:23-40.20(c)(6) and (7) and the awarded contract to EIC Inspections,
Jersey City, New Jersey (effective October 1, 2015 to October 1, 2018).
EIC Inspections contract states that the final elevator fee is 63%
of the State of New Jersey fees for elevator devices, plan review
and inspections plus a 40% administrative fee to the Town of Morristown.
| ||
Any fees not specifically set forth hereinabove that are contained
in Section 98-1(A) Schedule of Fees shall remain unchanged and in
full force and effect.
|
MECHANICAL SUBCODE FEES
| ||
Minimum fee
|
$50
| |
HVAC, furnace, boiler, A/C
|
$75
| |
Water heater
|
$45
| |
Generator
|
$50
| |
LPG or fuel oil tank replacement
| ||
550 gallons and less
|
$125
| |
Greater than 550 gallons
|
$250
| |
Gas log fireplace insert
|
$50
| |
Chimney liner
|
$100
| |
Fuel oil and gas piping
| ||
Fuel oil
|
$45
| |
Gas piping, up to four outlets
|
$50
| |
Each additional outlet
|
$20
|