(1)
Notice for final inspection shall be given to the Zoning Department for all POWTS installed, modified or reconnected.
(3)
Notification for final inspection shall be given in accordance with the requirements of Ch. SPS 383, Wis. Adm. Code.
(4)
The entire system shall be left completely open until it has been inspected and accepted unless the requirements of Ch. SPS 383, Wis. Adm. Code, are not met by the Department.
(5)
When a POWTS is ready for inspection, the plumber in charge shall make arrangements to enable the inspector to inspect all parts of the system. The plumber shall provide the proper apparatus, equipment and necessary assistance to make a proper inspection.
(6)
POWTS may be inspected periodically, after the initial installation inspection(s) and/or after the system is operative, as deemed necessary by the Issuing Agent.