The owner or owner's agent of a POWTS shall furnish the Department
with a copy of the inspection report, in a manner specified by the
County, verifying the condition of the tank, whether wastewater or
effluent from the POWTS is ponding on the ground surface and the date
of pumping within 30 calendar days of the date of inspection and pumping.
Reports shall include all information required in Ch. SPS 383.55,
Wis. Adm. Code, and be signed by the person(s) inspecting and pumping
the private sewage system. Other maintenance or management reports
required by Ch. SPS 383 or SPS 384, Wis. Adm. Code, shall be included
with this report.