A.
Subgrade, subbase and base shall not be laid in excess of 500 lineal feet without being rolled and thoroughly compacted.
B.
Copies of all invoices for material used in the construction of the roadbed and roadbed drainage structures must be provided to the Highway Superintendent.
C.
Highways and above- and below-grade improvements therein shall be guaranteed against defects and poor workmanship for a period of two years from the time of acceptance by the Town.
D.
Provide UL certificate for any repairs made to underground electric services damaged by developer operations.
E.
Prior to acceptance by the Town, the developer shall deliver to the Town a complete release of all liens arising out of the construction of the improvements proposed to be dedicated or conveyed to the Town, or receipts showing payment in full thereof, and if required in either case, an affidavit that so far as the developer has personal knowledge or information, the releases and receipts include all labor and materials for which a lien could be filed.