The Director of Engineering shall be responsible for the general administration of this ordinance and ensure that all development activities within the floodplains under the jurisdiction of the City meet the requirements of this ordinance. Specifically, the Director shall:
A. 
Process development permits in accordance with Article V;
B. 
Ensure that all development in a floodway (or a floodplain with no delineated floodway) meets the damage prevention requirements of Article VI;
C. 
Ensure that the building protection requirements for all buildings subject to Article VII are met and maintain a record of either the "as-built" elevation of the lowest floor (including basement) or the foolproof certificate;
D. 
Assure that all subdivisions and annexations meet the requirements of Article VIII;
E. 
If a variance is requested, ensure that the requirements of Article IX are met and maintain documentation of any variances granted;
F. 
Inspect all development projects and take any and all actions outlined in Article XI as necessary to ensure compliance with this ordinance;
G. 
Assure that applicants are aware of and obtain any and all other required local, state, and federal permits;
H. 
Notify IDNR/OWR and any neighboring communities prior to any alteration or relocation of a watercourse;
I. 
Provide information and assistance to citizens upon request about permit procedures and floodplain construction techniques;
J. 
Cooperate with state and federal floodplain management agencies to coordinate base flood data and improve the administration of this ordinance; and
K. 
Maintain for public inspection base flood data, floodplain maps, copies of state and federal permits, and documentation of compliance for development activities subject to this ordinance.
[Ord. No. 2008-27]