In the event that the construction is interrupted for a period
of more than 30 days, the permittee or contractor shall notify the
Director at the end of each interruption, and two working days in
advance of his intent to actively resume operations.
All discrepancies between the approved plans and field modifications
shall be brought to the attention of the Director and the engineering
professional representative and resolved as follows.
A. Major modifications.
(1) Major modifications, as determined by the Director, shall be requested
in writing. Modified plans shall be submitted to the Engineering Division
for re-review by all appropriate County agencies. These modified plans
shall be signed and sealed by the engineering professional representative.
(2) Within 30 calendar days from the date of receipt of the modified
plans, the Director shall approve, deny, approve with modification,
or provide written comments requesting revisions to the plans. The
Director may modify any time limit established in this section for
review if the Director makes a finding: that the modification is necessary
to ensure compliance with the provisions of this chapter; unusual
or extenuating circumstances make compliance within the time limits
impossible; or the time limit imposed is less than what is necessary
to ensure that the proposed construction shall comply with the provisions
of this chapter.
(3) Once reapproval is given, five paper copies of the revised approved
plans shall be submitted to the Engineering Division, and the construction
may proceed with coordination of the inspector.
(4) All major modifications shall be shown on the as-built plans.
B. Minor modifications.
(1) Minor modifications, as determined by the Director, shall be brought
to the attention of Project Management and Inspections prior to the
work proceeding.
(2) Within two working days, the Director shall approve or deny the minor
modifications in the field through a meeting of understanding.
(3) The approved modifications shall be documented on a field inspection
report, and the construction may proceed.
(4) All minor modifications shall be shown on the as-built plan.