A.
All users holding industrial discharge permits shall, at a frequency determined by the Director, submit a report as specified on their permit. This report shall include the results of the analysis of wastewater samples indicating the nature and concentration of pollutants in their wastewater that are limited by this Ordinance, and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with this Ordinance.
B.
All wastewater samples must be representative of the user's typical discharge. Wastewater monitoring and flow measurement facilities shall be at all times, properly operated, kept clean and orderly, and maintained in good working order. The failure of a user to maintain its monitoring facility in satisfactory working condition shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
C.
If a user subject to the reporting requirement in this Ordinance monitors any pollutant more frequently than required by the Director, using the procedures prescribed in Sections 6.8 and 6.9 of this Ordinance, the results of the monitoring shall be included in the report.