[Amended 4-7-80 by Ord. No. 1980-9]
A.
No soil removal permit will be issued until the applicant has posted with the township a performance bond in a form and with surety that is acceptable to the township and in an amount that the Township Engineer deems to be reasonable.
B.
The Engineer shall determine that amount, taking into account the nature and extent of the work to ensure that the site will be restored with sufficient vegetative growth, adequate surface drainage and such other factors as may bear on the operation. The performance bond will be conditioned upon the full and faithful performance by the applicant and principal, within the time specified in the application, of all the proposed work in accordance with the provisions of this ordinance and of the soil removal permit issued pursuant hereto.