Application Charge
|
Review Escrow
| ||
---|---|---|---|
1.
|
Subdivision
| ||
a. Minor Subdivision
|
$500
|
$3,000 (Replenish at $2,000)
| |
b. Preliminary Major Subdivision
|
$750
|
$1,000/Lot
| |
$5,000 Minimum (Replenish at $2,000)
| |||
$30,000 Maximum initial deposit
| |||
c. Final Major Subdivision
|
$500
|
$1,000/lot
| |
$5,000 Minimum (Replenish at $2,000)
| |||
$20,000 Maximum initial deposit
| |||
d. Concept Plan*
| |||
1. Minor Subdivision
|
$200
|
$2,000 (Replenish at $1,000)
| |
2. Major Subdivision
|
$500
|
$3,000 (Replenish at $2,000)
| |
e. Amended Minor, Prelim. Major, or Final Major
|
$500
|
$1,000/lot
| |
$3,000 Minimum (Replenish at $2,000)
| |||
$20,000 Maximum initial deposit
| |||
2.
|
Site Plan
| ||
a. Minor Site Plan
|
$500
|
$4,000 (Replenish at $2,000)
| |
b. Preliminary Major Site Plan
|
$500
|
$4,000/acre of disturbance
| |
$5,000 Minimum (Replenish at $2,000)
| |||
$30,000 Maximum initial deposit
| |||
c. Final Major Site Plan
|
$500
|
$4,000/acre of disturbance
| |
$5,000 Minimum (Replenish at $2,000)
| |||
$20,000 Maximum initial deposit
| |||
d. Concept Plan*
| |||
1. Minor Site Plan
|
$200
|
$2,000
| |
2. Major Site Plan
|
$200
|
$3,000
| |
e. Home Occupation
|
$200
|
$500
| |
f. Amended Minor, Prelim.
Major, or Final Major
|
$500
|
$2,000 Minimum (Replenish at $1,000)
| |
3.
|
Variances
| ||
a. Appeals
(40:55D-70a)
|
$200 Residential
|
$3,000 each
| |
$500 Commercial/Industrial
| |||
b. Interpretation
(40:55D-70b)
|
$200 Residential
|
$3,000 each
| |
$500 Commercial/ Industrial
| |||
c. Bulk
(40:55D-70c)
|
$200 Residential
|
$3,000 each
| |
$500 Commercial/ Industrial
| |||
d. Use
(40:55D-70d)
|
$200 Residential
|
$5,000
| |
$500 Commercial/Industrial
| |||
e. Permit
(40:55D-34 & 35)
|
$200 Residential
|
$2,000
| |
$500 Commercial/Industrial
| |||
4.
|
Certified List of Property Owners
| ||
See Section 706D3 of this ordinance
|
$0.25/name or $10, whichever is greater
|
None required
| |
5.
|
Copy of Minutes, Transcripts or Decisions
| ||
See Section 706E2 and 708C of this ordinance
|
$0.75/page for first ten pages copied
|
None required
| |
$0.50/page for the next ten pages
| |||
$0.25/page for each additional copy
| |||
$2.00 for each CD
| |||
6.
|
Subdivision Approval Certificate
| ||
See Section 1004 of this ordinance
|
$15 per certificate
|
None required
| |
7.
|
Certificate of Compliance or Certificate of All Taxes
Paid to Date
|
$5 per certificate
|
None required
|
8.
|
Special Meeting (as requested by the applicant)
|
$500
|
None required
|
9.
|
Geographic Information System Fee: In addition
to any other applicable fees, there shall be assessed a charge of
twenty-five dollars ($25.00) to each property owner or other applicant
who makes an application under this section that will result in any
change in the existing lot lines within the Township, the change in
the building footprint of an existing structure, the construction
of a new structure, or any other change that would result in a revision
to the Township Geographic Information System atlas. This fee shall
be specifically allocated to and shall be used to pay for the cost
of updating the said atlas.
|
*Fee and escrows paid in connection with concept applications
shall be credited toward the fee and escrows required for minor and
major subdivision and minor and major site plan applications once
submitted within one (1) year of the Board's review of the concept
plan.
|
Developer's Cost
Total Enlargement or Improvement Cost
|
=
|
Development gpd
Total Tributary gpd
|
Developer's Cost
Total Project Cost
|
=
|
Development Tributary gpd
Total Tributary gpd to New System
|
Developer's Cost
Total Cost of Roadway Improvement and/or Extension
|
=
|
Additional Peak-Hour Traffic Generated by the Development
Future Total Peak-Hour Traffic
|
Developer's Cost
Total Enlargement or Improvement Cost of Drainage Facilities
[Amended by Ord. #2008-05 § 7] |
=
|
Development cfs
Total Tributary cfs
|