FIRE FEE SCHEDULE
UCC FIRE PROTECTION
IN-HOUSE INSPECTION SERVICES
| ||
---|---|---|
Item
|
Quantity
|
Fee
|
STORAGE TANKS (Install): Flammable/Combustible Materials (Above
or Below Grade)
| ||
Up to 275 Gal.
|
$100.00
| |
276 to 1,000 Gal.
|
$150.00
| |
1,001 to 2,000 Gal
|
$175.00
| |
2,001 to 10,000 Gal.
|
$350.00
| |
10,001 Gal. or More
|
$500.00
| |
LNG STORAGE TANKS:
| ||
2,000 Gal. or less
|
$175.00
| |
2,001 Gal. or more
|
$350.00
| |
CHEMICAL STORAGE TANKS:
| ||
2,000 Gal. or less
|
$175.00
| |
2,001 Gal. or more
|
$350.00
| |
TANK REMOVAL (UST & AST)
| ||
Up to 275 Gal.
|
$100.00
| |
276 to 1,000 Gal.
|
$150.00
| |
1,001 or 2,000 Gal.
|
$175.00
| |
2,001 to 10,000 Gal.
|
$350.00
| |
10,000 or more
|
$500.00
| |
FIRE SUPPRESSIONS SYSTEMS:
| ||
System Pump Rating
|
250 to 500 gpm
|
$300.00
|
501 to 1,000 gpm
|
$600.00
| |
1,001 to 2,000 gpm
|
$900.00
| |
2,001 or more gpm
|
$1,200.00
| |
Hydraulic Calculations System Rev.
|
Each
|
$75.00
|
Standpipe
|
Each riser
|
$350.00
|
Pre-Action Valve
|
Each
|
$125.00
|
Dry pipe Alarm Valve
|
Each
|
$125.00
|
All System Devices not Specifically Priced
|
1 to 10 devices
|
$75.00
|
Each additional device
|
$15.00/device
| |
Sprinkler Heads
|
20 or fewer
|
$125.00
|
21 to 100
|
$250.00
| |
101 to 200
|
$375.00
| |
201 to 400
|
$800.00
| |
401 to 1000
|
$1,600.00
| |
1000 to 1500
|
$2,000.00
| |
More than 1500
|
$2,500.00
| |
Fire Alarm Panel—Commercial
|
Each
|
$125.00
|
Fire Alarm Panel—Residential
|
Each
|
$75.00
|
Wireless Secondary Fire Alarm System
|
R-3 or R-5 use
|
No fee
|
Central Station Alarm
|
Each
|
$75.00
|
Fire Mains
|
Up to 250' in length
|
$250.00
|
Over 250' in length
|
$500.00
| |
Water Tanks—Fire System
|
Each
|
$250.00
|
DETECTOR/ALARM SYSTEMS:
| ||
1 to 5
|
$50.00
| |
6 to 10
|
$75.00
| |
11 to 15
|
$150.00
| |
16 to 20
|
$175.00
| |
21 to 25
|
$200.00
| |
26 to 30
|
$225.00
| |
31 or more
|
$225.00 + $5/each additional unit
| |
Pull Station
|
Each
|
$25.00
|
Horn/strobe
|
Horn or strobe
|
$25.00
|
Supply and return detectors
|
Each
|
$75.00
|
MULTI-GAS DETECTION SYSTEM:
|
Per system
|
$150.00
|
SMOKE CONTROL SYSTEM:
|
Each
|
$500.00
|
PRE-ENGINEERED SYSTEMS:
| ||
Independent
|
Each
|
$200.00
|
Carbon Dioxide (CO2)
|
Each
|
$200.00
|
Foam Suppression
|
Each
|
$200.00
|
Wet Chemical
|
Each
|
$200.00
|
Clean Agent
|
Each
|
$200.00
|
GAS/OIL-FIRED APPLIANCES:
| ||
Not connected to Plum. System
| ||
All other uses
|
Per appliance mechanical inspection
|
$125.00
|
New Construction:
| ||
R-3 and R-5
|
Per appliance
|
$75.00 per unit
|
R-2 (3 to 10 units)
|
Per appliance
|
$150.00 per unit
|
R-2 (11 units or more)
|
Per appliance
|
$750.00 per unit plus $50 each additional
|
All other uses
|
Each
|
$125
|
CHIMNEYS/VENTS:
| ||
Chimney
|
Each
|
$100.00
|
Fireplace Chimney
|
Each
|
$100.00
|
Vent
|
Each
|
$100.00
|
KITCHEN EXHAUST SYSTEMS
| ||
COMMERCIAL
|
Each
|
$200.00
|
HAZARDOUS EXHAUST SYSTEMS
|
Per system
|
$250.00
|
INCINERATORS:
|
Each
|
$575.00
|
CREMATORIUM:
|
Each
|
$575.00
|
GENERATOR/STANDBY POWER
|
Per system
|
$125.00
|
GASOLINE SERVICE STATIONS:
| ||
Gasoline Pump
|
Each
|
$100.00
|
TRENCH INSPECTION:
|
Each
|
$100.00
|
PLAN REVIEW:
|
Each application
|
20% of permit fee
|
AMENDED RELEASED PLAN REVIEW:
| ||
Review (Minimum One Hour)
|
Per hour
|
$75.00
|
Minimum Fee
|
Each application
|
$75.00
|
Any item not specifically addressed above will be priced
|
$40.00 per $1,000.00
|
BUILDING FEE SCHEDULE
UCC CONSTRUCTION
IN-HOUSE INSPECTION SERVICES
| ||||
---|---|---|---|---|
The Building Subcode fees shall be as follows:
| ||||
(1)
|
New Construction: up to 100,000 cubic feet, the fee shall be
computed by volume multiplied by 0.040.
| |||
(2)
|
New Construction over 100,000 cubic feet the fee shall be computed
by volume multiplied by 0.037.
| |||
(3)
|
The unit rate for large, open volume single story spaces in
buildings, such as barns, silos, greenhouses, warehouses, distribution
centers and other storage-use occupancies, shall be calculated at
0.035 per cubic root of volume to a maximum height of 20 feet even
though the actual height of the space may be greater.
| |||
New Construction: Commercial farm building and structure
on farms. The fee shall be computed by volume multiplied by 0.0011
to maximum of $1,145.
| ||||
(4)
|
Alterations, renovation and repairs.
| |||
(5)
|
R5 residential, multiplied by estimated cost of construction.
| |||
(a)
|
R5 residential, multiplied by estimated cost of construction:
| |||
$35 per $1,000.
|
Up to $50,000.
| |||
$25 per $1,000.
|
$50,001-$100,000
| |||
$20 per $1,000.
|
Over $100,000
| |||
(b)
|
All other uses, multiplied by estimated cost of construction.
Minimum fee of $75.
| |||
$36 per $1,000.
|
Up to the first $50,000 (prorated)
| |||
$29 per $1,000.
|
Amount exceeding $50,001-$100,00 (prorated)
| |||
$26 per $1,000.
|
Amount exceeding over 100,00 (prorated)
| |||
(c)
|
Surcharge fee - State fee of New Jersey: 0.00371 per cubic foot
or $1.90 per $1,000 estimated cost of construction.
| |||
Flat fees shall be as follows:
| ||||
(1)
|
Swimming pools
| |||
Above ground less than 550 square feet
|
$75
| |||
Above ground greater than 550 square feet
|
$140
| |||
In ground lees than 550 square feet
|
$160
| |||
In ground greater than 550 square feet
|
$210
| |||
(2)
|
Fences over 6 feet high
|
$75
| ||
(3)
|
Antenna, mast satellite dish (R3 and R5)
|
$75
| ||
(4)
|
Radon
|
$100
| ||
(5)
|
Structural towers
|
$500
| ||
(6)
|
Asbestos removal or lead abatement
|
$150
| ||
(7)
|
Temporary structures, tents, temporary trailers (180 days)
|
$120
| ||
NOTE: Tents in excess of 900 square feet or more
than 30 feet in any dimension $210
| ||||
(8)
|
Demolition
| |||
(a)
|
Residential R3 and R5 and farm buildings under 5,000 square
feet and less than 30 feet
|
$100
| ||
(b)
|
All other use groups/per story each for 10,000 square feet or
less of floor space
|
$250
| ||
(9)
|
Retaining Walls
| |||
(a)
|
Class 3 Residential - Less than 550 square feet
|
$160
| ||
(b)
|
Class 3 Residential - greater than 550 square feet
|
$210
| ||
(c)
|
All other use groups - cost of construction as tabled in section
A and B
| |||
(10)
|
Minimum Fee
|
$75
| ||
Signs
| ||||
Fee for pylons signs shall be
|
$6 per square foot for the first 100 square feet,
| |||
$4.75 per square foot for the next 400 square feet
| ||||
$3.50 per square foot for thereafter
| ||||
Fee for ground signs or wall signs shall be
|
$5 per square foot for the first 100 square feet,
| |||
$3.75 per square foot for the next 400 square feet,
| ||||
$2.50 per square foot thereafter
|
PLUMBING FEE SCHEDULE
UCC PLUMBING
IN-HOUSE INSPECTION SERVICES
| |||
---|---|---|---|
Plumbing UCC in-house fees and definitions. Plumbing for the
following terms shall apply herein.
| |||
Plumbing appliance means and includes, but shall
not be limited to, hot water heaters, tank-less heater units, water
conditioners and similar equipment.
| |||
Plumbing appurtenance means and includes but shall
not be limited to devices, be the device a manufactured device or
an on-the-job assembly on component parts, which device is an adjunct
to the basic piping system and plumbing fixtures. Plumbing appurtenances
shall include but be limited to pressure-reducing valves, backflow
prevention, back water valves, vacuum breakers, grease traps, interceptors
and similar devices.
| |||
Plumbing fixtures means and includes but shall
not be limited to stacks, lavatories, kitchen sinks, stop sinks, urinals,
water closets, toilets, bathtubs, shower stalls, laundry tubs, floor
drains, washing machine connections, hose bibs and similar devices.
| |||
Plumbing fees shall be as follows
| |||
Mechanical inspection fee for R3 or R5 $75 per unit,
$50 each additional unit
| |||
(1)
|
Fees for each plumbing fixture, backflow preventer (non-testable
type)
|
$16
| |
(2)
|
Water heater appliance
|
$35
| |
(3)
|
Fuel oil piping
|
$60
| |
(4)
|
Gas piping
|
$100
| |
(5)
|
Steam boiler
|
$100
| |
(6)
|
Hot water boiler
|
$100
| |
(7)
|
Sewer pump
|
$100
| |
(8)
|
Interceptor/separator and plumbing appurtenances
|
$100
| |
(9)
|
Grease trap/oil trap
|
$100
| |
(10)
|
A/C or refrigeration unit - condenser only
|
$75
| |
(11)
|
HVAC or combination A/C
|
$100
| |
(12)
|
Sewer connection:
| ||
Up to 6 inches
|
$100
| ||
7 inches to 11 inches
|
$150
| ||
12 inches to 23 inches
|
$250
| ||
24 inches and up
|
$300
| ||
(13)
|
Water service connection
|
$100
| |
(14)
|
Active solar system
|
$100
| |
(15)
|
Other minimum fee and testable back flow preventer
|
$100
| |
For cross connections and back flow preventers that
are subject to testing, requiring re-inspection annually, the fee
shall be $75 for each device when they are tested
| |||
(16)
|
Each stack
|
$16
| |
(17)
|
Each tie-in process
|
$16
| |
(18)
|
Lawn sprinklers
|
$45
| |
(19)
|
Roof drain (each)/floor drain (each)
|
$35
| |
(20)
|
Plumbing appurtenances (each)
|
$75
| |
(21)
|
Building sewer/drain system
|
$100
| |
(22)
|
Fees are to be based on per $1,000 of estimated cost
(i.e., hydronic piping, geothermal wells, etc.)
| ||
For purpose of determining estimated cost, the applicant
shall submit to the department cost date produced by the architect
or engineer of record, or by a recognized estimating firm or by the
contractor. $40 per thousand
| |||
Minimum fee
|
$75
| ||
Liner
|
$100
| ||
Roof drains
|
$50
| ||
Plan review fees: a non-refundable fee of 20% of the total fees
for plan review and prototype plans
|
ELECTRICAL FEE SCHEDULE
UCC ELECTRICAL
IN-HOUSE INSPECTION SERVICES
| ||||
---|---|---|---|---|
(1)
|
For the purpose of computing these fees, device outlets, fixtures
and switches shall include but not be limited to burglar alarms, intercom
panels, smoke detectors, thermostats, motors, photocells, level probes,
temperature sensors and similar items
| |||
(a)
|
For the first 75 devices
|
$75
| ||
(b)
|
Each additional 25 devices of fraction thereof
|
$25
| ||
(2)
|
For the purpose of computing these fees, the term service, service
panel, sub-panels, feeders, switches, switchboards, motor control
centers, alarm panels, sign, disconnects, re-inspections or of service
| |||
(a)
|
Up to 100 amps
|
$18
| ||
(b)
|
101 amps up to 200 amps
|
$150
| ||
(c)
|
201 amps up to 1,000 amps
|
$250
| ||
(d)
|
1000 amps and above
|
$650
| ||
(3)
|
For the purpose of computing these fees, all motors including
ranges, ovens, surface units, dryers, air conditioning units, water
heater, central heat, (oil, gas electric) baseboard heat units, generators,
transformers or other devices consuming, generating or altering electricity
| |||
(a)
|
Motors and electrical devices
|
$18
| ||
(b)
|
Fractional HP
| |||
[1]
|
Over 1 hp up to 10 hp
|
$20
| ||
[2]
|
11 hp up to 50 hp
|
$75
| ||
[3]
|
51 hp up 100 hp
|
$150
| ||
[4]
|
101 hp up to 500 hp greater than 100 hp
|
$650
| ||
[5]
|
Each increment of 50 hp or part thereof, add
|
$25
| ||
(c)
|
Transformer and generators
| |||
[1]
|
Fractional KW
|
$18
| ||
[2]
|
Over 1 kw up to 50 kw
|
$25
| ||
[3]
|
51 kw up 100 kw
|
$100
| ||
[4]
|
51 kw up yo 100 kw
|
$150
| ||
[5]
|
101 kw up to 500 greater than 100 kw
|
$750
| ||
(4)
|
Pools, fountains and similar installation includes bonding,
motor, 2 outlets and a switch
| |||
(a)
|
Above-ground
|
$126
| ||
(b)
|
In-ground
|
$189
| ||
(5)
|
Lights standard (each)
|
$15
| ||
(6)
|
Trailers
|
$75
| ||
(7)
|
Solar panels, grounding grids, disconnect switch etc., per unit
(module)
|
$20
| ||
(8)
|
Branch circuits
|
$35
| ||
(9)
|
Minimum fee
|
$75
| ||
(10)
|
All other work requiring review and inspection fees based on
$75 per hour with a one hour minimum.
| |||
(11)
|
The fee for the elevator plan review and elevator installation
shall comply with the standards listed in N.J.A.C. 5:23-12. By DCA
fees for permits and/or inspections for elevator plan review and elevator
installation not covered hereunder shall be governed by the State
Uniform Construction Code adopted and set forth under the General
Ordinances of the City of Perth Amboy Building and Housing.
| |||
(12)
|
Variations fees shall be as follows:
| |||
(a)
|
Class I
|
$850
resubmittal $350
| ||
(b)
|
Class II
|
$350
resubmittal $100
| ||
(c)
|
Class III
|
$350
resubmittal $100
| ||
(13)
|
Administrative fees as follows:
| |||
(a)
|
For review of any amendments for change to a plan that has already
been released, there shall be an additional fee of $75 per hour, minimum
of one hour
| |||
(b)
|
Change of contractor or change of owner on an issued permit
shall require an additional fee of $75
| |||
(14)
|
Other fees:
| |||
(a)
|
Certificate of Occupancy
| |||
[1]
|
R3 and R5 residential single family
|
$100
| ||
[2]
|
All other use groups
|
$250
| ||
(b)
|
Continued certificate of occupancy
|
$300 minimum per subcode
| ||
(c)
|
Certificate of approval
|
No Fee
| ||
(d)
|
Temporary certificate of occupancy - first issuance and renewal
(no fee for first issuance, if CO fee has already been paid
|
$50
|