[Ord. No. 383, 8/27/2019]
The fee required by this chapter is the Municipal Review Fee.
The Municipal Review Fee shall be established by the Township from
time to time by resolution of the Board of Supervisors to defray review
costs incurred by the Township and the Township Engineer. The applicant
shall pay all fees.
[Ord. No. 383, 8/27/2019]
1. The fees required by this chapter shall, at a minimum, cover:
A. Administrative and clerical costs.
B. Review of the SWM site plan and report by the Township.
C. Pre-construction meetings.
D. Inspection of stormwater management facilities/BMPs and drainage
improvements during construction.
E. Final inspection and review of record drawing and as-built plan upon
completion of the stormwater management facilities/BMPs and drainage
improvements presented in the SWM site plan.
F. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and assure proper completion
of stipulated remedial actions.
[Ord. No. 383, 8/27/2019]
1. The owner of any land upon which permanent BMPs will be placed, constructed,
or implemented, as described in the SWM site plan, shall record the
following documents in the Office of the Recorder of Deeds of Washington
County, within 90 days of approval of the SWM site plan by the Township:
B. Operations and maintenance (O&M) agreement (Appendix A).
2. The Township shall suspend or revoke any approvals granted for the
project site upon discovery of the failure of the owner to comply
with this Section.
3. It is advised to coordinate the recording of the above listed information
with PADEP NPDES notice of termination requirements.