Consumption
(cubic feet)
|
Charge
|
Rate
(Calendar Year 2023)
|
---|---|---|
0 to 10
|
Flat charge
|
$55.72
|
11 or more
|
Consumption charge per 100 cubic feet (CCF)
|
$5.572
|
Meter Size
(inches)
|
Meter Capacity Ratio
(ratio to 5/8-inch Meter)
(EDUs)1
|
Water Connection Fee
|
---|---|---|
5/8
|
1.00
|
$231
|
3/4
|
1.45
|
$334.95
|
1
|
2.55
|
$589.05
|
1 1/4
|
3.79
|
$875.49
|
1 1/2
|
4.84
|
$1,118.04
|
2
|
9.97
|
$2,303.07
|
3
|
19.20
|
$4,435.20
|
4
|
29.60
|
$6,837.60
|
6
|
60.10
|
$13.883.10
|
8
|
80.00
|
$18,480
|
10
|
115.00
|
$26,565
|
12
|
215.00
|
$49,665
|
NOTES:
| |
---|---|
1
|
This calculation shall be automatically adjusted in accordance
with any amendments to N.J.A.C. 7:14A-23.
|
Main Size
(inches)
|
Tap Size
(inches)
|
Water Tapping Fee
|
---|---|---|
Any
|
3/4 inch to 2 inches
|
$403.25
|
Any
|
2 1/4 inches to 12 inches
|
$1,365
|
Hydrant flow test
|
$320
|
Water use at construction site
|
Charges for the consumption of water identified in § 193-12A and $3,000 deposit for temporary meter
|
Temporary meter fees
| |
Zero to 90 days
|
$100
|
Due first of each month following 90 days
|
$50
|
Meter test
|
$100
|
Return check fee
|
$25
|
Water shut-off fee
| |
Monday through Friday between 8:00 a.m. and 3:30
p.m.
|
$49
|
Saturday and Sunday between 7:00 a.m. and 3:30 p.m.
and Monday through Friday between 3:30 p.m. and 7:00 a.m.
|
$100
|
Water activation (turn-on) fee
| |
Monday through Friday between 7:00 a.m. and 3:30
p.m.
|
Residential: $25
Commercial: $75
|
Saturday and Sunday between 7:00 a.m. and 3:30 p.m.
and Monday through Friday between 3:30 p.m. and 7:00 a.m.
|
Residential: $50
Commercial: $150
|
Water services application fee for new or changed water services
|
For water service lines less than 2 inches: none
For water service lines 2 inches or larger: $50 per EDU
The number of EDUs a water service line size represents is set
forth in the table of connection fees herein
|
Water meter
|
(at prevailing cost)
|
Meter, fittings, valve boxes and other parts
|
Cost plus 15%
|