[Ord. No. 98-21 § 304-8; amended 6-9-2022 by Ord. No. 22-05]
The applicant shall, at the time of permit application in the Construction Department, pay the following nonrefundable fees to the Township of Aberdeen by cash, certified check, bank money order or check.
a. Zoning permits:
1. All zoning permit fees shall be $65.*
A single-family dwelling where there was no dwelling prior or grade changes substantially. A $1,500 escrow is to be posted with the Borough of Matawan Municipal Clerk for the purpose of review of topographic survey, and inspections of the site. The unused portion will be returned to the applicant; however, additional escrow may have to be posted as to the extent and required inspections. |
*A $1,500 escrow to be posted to the Borough of Matawan Municipal Clerk for the purpose of review of topographic survey, and inspection of the site. The unused portion will be returned to the applicant; however, additional escrow may have to be posted as to the extent and required inspections. |
b. Certificates of Occupancy: See Chapter
13, Building and Construction.
c. Demolition permit: See Chapter
13, Building and Construction.
d. Permit to move and relocate structure: See Chapter
13, Building and Construction.
e. Site plan review:
1. Conceptual site plan: $100.00.
2. Preliminary approval: $200.00 for each acre or portion thereof.
3. Final approval: 1/2 of the preliminary site plan fee.
4. Resubmission of revised plan: 1/3 of the original submission fee.
f. Subdivisions:
1. Sketch plans or minor subdivision: $50.00.
2. Preliminary approval of major subdivision: $100.00, plus $50.00 per lot.
3. Final approval of major subdivision: $100.00, plus $25.00 per lot.
g. Variances/appeals:
1. Hear and decide appeals: $50.00.
2. Interpretation of zoning regulations: $50.00.
3. Hardship or bulk variances: $50.00 per variance.
5. Building permit for lot not related to a street: $ 100.00.
h. Conditional use permit: $200.00.
i. Sign permits: See Chapter
13, Building and Construction.
j. Informal submissions: $50.00 per hearing.
k. Inspection fees for on-site and off-site improvements.
1. When any development proposal approved by the Unified Planning Board includes the construction of on-site or off-site improvements, the developer, owner or applicant shall post with the Borough Clerk a performance bond in the amount estimated by the Unified Planning Board Engineer. Said bond shall be for 120% of the estimated cost of the improvements. The developer, owner or applicant shall also post with the Borough Clerk cash or a certified check in the amount of 10% of the estimated cost of improvements. Said moneys shall be placed in an escrow account to be drawn against by the Borough Engineer for his required construction, administration and inspection fees. The required performance bond, cash bond and inspection fees shall be posted with the Borough Clerk prior to the issuance of any building permits or the commencement of any construction. Any inspection fee escrow account residual shall be returned to the developer at the time of the maintenance bond release.
2. The minimum inspection fee shall be $300.