Prior to initiation of construction and prior to any site work, including clearing of vegetation, grading or earth removal, except that which is necessary for testing for wastewater disposal, the applicant shall be required to provide the Planning Board with the following:
A.
Construction schedule. The applicant shall submit a schedule of the projected work by major categories of work to the Planning Board for review and approval eight weeks prior to the start of construction. The schedule shall be by calendar weeks and address each category in Article VI, Design and Construction Standards. The schedule shall be adjusted periodically to reflect the actual work progress and related modifications to the schedule.
B.
Performance guarantee. Construction and installation of roadways, drainage, water supply, wastewater disposal, landscaping, utilities and other infrastructure associated with the development shall be secured by one, or in part by one and part by the other, of the following methods which may from time to time be varied by the applicant with the written consent of the Board. Said security shall be posted and approved by the Planning Board prior to any construction.
(1)
Approval with covenant. The applicant shall file a duly executed covenant, which provides that no unit in an SHC may be sold until the ways and municipal services necessary to adequately serve such unit have been constructed and installed. Such covenant shall be approved as to form and manner of execution by the Planning Board and shall be recorded in the Registry of Deeds by the owner of record and shall run with the land.