A.
Environmental design and site plan review. In order to assure the harmonious development of all areas of the Borough of North Caldwell in accordance with the intended appearance of the Borough, as established by the Master Plan, to assure that maximum care is exercised to preserve and enhance existing natural features and environmental conditions, to preclude the creation of traffic flow or traffic safety problems and to maximize efforts to assure each property owner the right to safe and comfortable enjoyment of his property, an environmental design and site plan for new construction, not to include internal remodeling and/or internal alterations or renovations, shall be reviewed and approved by the North Caldwell
Planning Board prior to the issuance of a building permit, zoning permit or certificate of occupancy in the following situations:
(1)
Except for individual lot applications for detached one-or two-dwelling-unit buildings, prior to the issuance of any building permit, zoning permit or certificate of occupancy, as the case may be, for any new structure, addition to or alteration of any existing structure or change in use, a site plan shall be submitted to the Planning Board for its review and approval.
(2)
Site plan review shall also be required for the approval of a conditional use by the Planning Board, in which case the site plan shall be submitted to the Planning Board at the time of filing the petition for such conditional use.
(3)
At the time of application for approval of any cluster development.
(4)
At the time of application for or subsequent to the approval of a use variance by the Board of Adjustment, in which cases the site plan approval shall be granted by the Board of Adjustment pursuant to N.J.S.A. 40:55D-76.